National Highways And Infrastructure Development Corporation Limited Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NHIDC_591179_1Bid Award Id
ViewTender No
NHIDCL/Assam/NH-37/N-KT/2016Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Bridge/Structural Engineer
18
-
-
Senior Quality cum Material Expert
18
-
-
Road Safety Expert
18
-
-
Sub-Professional Staff
-
-
-
Survey Engineer (2*18)
36
-
-
Assistant Quality cum Material Engineer (1*18+1*(18+60))
96
-
-
Lab Technician (2*18)
36
-
-
Quantity Surveyor (1*18+1*(18+60))
96
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manager cum Accountant (1*(18+60))
78
-
-
Steno cum Computer Operator (1*(18+60))
78
-
-
Office Boy (1*(18+60))
78
-
-
Transportation (Fixed Costs)
-
-
-
Innova/scorpio or equivalent (not more than 2 years old) (2 nos during Construction Period), 2*18=36
Rate per month
36
-
-
Innova/scorpio or equivalent (not more than 2 years old) ( nos during Maintenance period/DLP), 1*60=60
Rate per month
60
-
-
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
-
-
-
For 18 round trip to Employer's Head Office
18
-
-
For 18 round trip to Employer's regional office.
18
-
-
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
-
-
-
During Construction period
18
-
-
During Maintenance /DLP period
60
-
-
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
-
-
-
Office Supplies (1*18+1*60)=78
78
-
-
Drafting Supplies (1*18+1*60)=78
78
-
-
Computer Running Costs (1*18+1*60)=78
78
-
-
Domestic and International Communication (1*18+1*60)=78
78
-
-
Office Furniture and Equipment (Rental)
Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc., The items shall be taken as per the project requirement.
-
-
-
During Construction period
18
-
-
During Maintenance /DLP period
60
-
-
Reports and Document Printing ( rate as per copy)
-
-
-
Monthly reports
(Design and Construction)
234
-
-
Half yearly Reports
42
-
-
Various others reports as provided in the Concession Agreement such as Completion Report
1
-
-
Road Survey Equipment, Rate per Km
-
-
-
Surface defects detection and roughness measurement using Network Survey Vehicle
102
-
-
Pavement strength measurement using FWD
102
-
-
Road signs inspection using Retro Reflectometer
102
-
-
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements