To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tribal Welfare Engineering Department - TWED Tender
Opening Date21 Nov 2019
Closing Date5 Dec 2019
Tender Amount₹ 26,06,586 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,198
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
299430Bid Award Id
ViewTender No
71/2019-20/EE/TW/SCA/DB/Dt.11.11.2019Tender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://http://www.aptribes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply and fixing of Door of size 1.20x2.10 M Double Leaf with door frame of 40x40x6mm MS angular of 1 no horizontal, 2 nos, verticals and 12mm square bar at bottom to connect the verticles of the frame and double flush door shutter with solid bond wood block board type with commercial ply on both faces 35mm thick, Hardwarefixtures ie., MSPC Butt Hinges 150mm long 6nos, MSPC Handles 125mm long 1no, MSPC Tower Bolt 250mm long 2nos, MSPC Aldrop 300mm long 2 nos, MS Hold fast 6nos, and Heavy Door stopper 1 Nos., including labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work
5.04
-
2634
... More
Ornamental ceiling plastering 12mm thick single coat in CM (1:3) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
117
-
3032.8
... More
Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm) FRLS / HFFR P.V.C. insulated ISI Copper Cable GM/L&T/RPG/Havells/V-Guard/Power Flex/Polycab/Gold Medal/ Standard /Milion / Vimal/ Suncab/ Paragaon / FortuneArt make in the existing metallic / non-metallic conduct pipe with 6A 1 Way flush type switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including cost and conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work for light, bell, fan and exhaust fan points in Non-Residential Buildings.
20
-
461.93
... More
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FR / FLRS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes KEI / Polycab/ Havells/GM/Million?HPL/ Gold Medal/ Power Flex/ RPG/ Anchor/ Sun cab/ fortune Art/ Great white
25
-
86.223
... More
Drilling of bore well with DTH Rig to finished dia of 175mm dia in all formations including drilling of pilot bore to 350mm dia and insertion of 180mm dia PVC casing pipe, bore development, filling with pebbeled gravel alround pipe including flushing charges etc., complete.
75
-
702
... More
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams GROUND FLOOR
4
-
8508.9
... More
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126)
2
-
61639.9
... More
Supply and fixing of 1 X 36/40W Patty type tubel light luminaried powder coated CRCA sheet steel housing with copper chokes and all standard accessories of makes Cromption/Bajaj/Surya/HPL/Havells/Fortune including giving connection and all labour chrges etc., complete for finished item of work.
4
-
491.31
... More
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) GROUND FLOOR
128.03
-
3849.05
... More
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels GROUND FLOOR
1
-
9571.75
... More
Providing impervious coat to exposed RCC roof slab surface with CM(1:3)20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work GROUND FLOOR
117
-
4045.55
... More
White washing two coats with paint grade white lime for wash or equivalent quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work in all floors for walls
273.75
-
257.9
... More
Supply and Run of 2 of 6 Sq.mm (7/18) WPSC ISI Aluminium wire of makes Finolex / GM/ million /Payal/ V-Guard/ Nakoda / Gold Medal / HPL/RPG/ Nandicab along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including cost and conveyance of all materials to site, labour charges and sales tax etc., complete for finished item of work.
15
-
58.44
... More
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310
78.37
-
340.75
... More
Providing Skirting to internal walls to 15 cm height and risers of steps with Nano polished/stain free soluble salt porcelain vitrified tiles screen printed of size 600x600mm and thickness between 8-10mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15 of any colour and finish in all shades and designs, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work.
4.33
-
9695
... More
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as per SS - 20 B (APSS 308). for Building Foundation
67.77
-
191.3
... More
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns GROUND FLOOR
3.78
-
9804.8
... More
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 330Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings.
7.65
-
8142.6
... More
Providing independent earthing for important equipment with 40mm dia 'B' class 2.5mm long G.I. Pipe and 19mm dia 'B' class G.I.pipe of 0.3mtr. Long connected with reducer providing G.I funnel with mesh enclosd in C.C.Chamber of 400m x 400m x 400m with R.C.C slab cover duly providing staggered holes filling with sald and charcoal from the borrom of the pipe giving earth connectionf rom electrode through G.I strip of 40 x 6mm x200mm length with all accessories and labour charges, contractor profit & overheads complete, as per Is specifications 732/1982 (PartIII)
1
-
3241.72
... More
Supplying and fixing of (Three Leaf Shutters) MS frame window 1.52m x 1.37 m with window outer angular frame of rolled steel equal angle ISA 4040 of size 40mmx40mmx6mm and rolled steel Tee bars 40mmx40mmx6mm - 2 Nos vertically, with MS 12mm square rods safety bars at 100mm C/C horizontally, door shutter with Solid bond wood block board type with commercial ply on both faces 30mm thick on both faces including Hardware fixtures such as M.S.'Z' Hold fasts 4 Nos, MSPC Butt Hinges 100mm long - 6 nos, MSPC tower bolts 150mm long - 6 nos, MSPC handles 125mm long - 3 nos including cost and conveyance of all materials to site, fabrication charges of MS Angular window frame, labour charges for fixing of window frame in position, labour charges for making window shtter and fixing of hardware fixxtures to window shutter, fixing the window shutter to the window frame, and red ixude oaint of Grade I quality to the MS angular frame and Tee bars etc complete for finished item of work
12.49
-
3836
... More
Supply and fixing of 6A 3/2 pin flush type socket with 6A switch control of Anchor / Gold medal olive / Million zoom make with ISI mark on a common switch board with earth continuity including wire leads, earth connections including cost and conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work
5
-
136.79
... More
No of items 38 (THIRTY EIGHT ITEMS) only
-
-
-
... More
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work GROUND FLOOR
7
-
710.55
... More
Supply and fixing of ISI mark 25mm dia 2.2mm thick PVC conduit pipe Sudhakar / Macoplast / Modimake concealed in roof slab with all required acessories including No.14 SWG GI wire for earth continuity including chiseling the wall wherever necessary , including necessary masonery work for light/fan point and seperate plug point with teak wood deep box including cost and conveyance of all materials to site and labour charges, sales tax etc., complete for finished item of work.
55
-
78.1
... More
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402) for Levelling Course and Flooring Bed
13
-
3538.7
... More
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. GROUND FLOOR
20.52
-
5362.35
... More
Supply and errecting ceiling fan of Crompton high speed plus / Bajaj electra50 /orient energy star with 3 blades and double ball bearings and with condenser AC 250V 50 C/S of 48" 1200mm sweep completely erected in position with out regulator, canopy down rod up to 301.80 mm in length is provided with hook/clamps nuts and bolts and 24/02 flexible copper wire etc., complete and pointed with lettering by enamil paint the Sl. No. and date of errection including cost and conveyance of all materials and labour chargers etc., complete.
4
-
2066.16
... More
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904) Ground Floor
90.88
-
3772.3
... More
Brick Masonry in superstructure with CM (1:6) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. GROUND FLOOR
18
-
4985.45
... More
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for PLINTH BEAM
3
-
10293.35
... More
Supply of 32A DP Flush type Makes: GM / Million / Gold Medal / Maru Mantero / Anchor Penta Cherry / Great white
1
-
293
... More
Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coatof wood Primer finishing with putty for wood work after thouroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
78.9
-
1731.5
... More
Supply and fixing of Batton Holder/Slanting holder in lieu of ceiling rose of light point complete with allconnetions and all labour charges with 40Watt bulb etc., complete for new installation. Anchor Make
5
-
101.12
... More
Flooring with Nano polished/stain free soluble salt porcelain vitrified tiles sceen printed of size 600x600mm and thickness between 8-10mm 1st quality conforming to IS:13711,IS13712,IS13630 (Parts 1 to 15 of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8) 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3Kgs per sqm & joined neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, water and tiles etc, cto site including deigniorage charges etc, complete for finished item of work. GROUND FLOOR
120.68
-
9750.4
... More
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 330Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedastals.
1.46
-
8583.45
... More
Supply and fixing of ISI mark 25mm dia 2.2mm thick PVC conduit pipe Sudhakar / Macoplast / Modimake concealed in wall with all required acessories including No.14 SWG GI wire for earth continuity including chiseling the wall wherever necessary , including necessary masonery work for light/fan point and seperate plug point with teak wood deep box including cost and conveyance of all materials to site and labour charges, sales tax etc., complete for finished item of work.
50
-
94.94