Tribal Welfare Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tribal Welfare Engineering Department - TWED Tender
Opening Date27 Jun 2019
Closing Date11 Jul 2019
Tender Amount₹ 1,97,63,517 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
282239Bid Award Id
ViewTender No
Nit.No.16/2019-20/SE/TW/Nabard-XXIV/DB/Dt.21.06.2019Tender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://http://www.aptribes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem specification including cost,seignorage of all materials and including premixing the material with water at OMC in Mechanical mix plant (pug mill) carriag of mixed material by tipper to site , laying in uniform layers with motor grader on base course on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) and 406 MORD complete for finished item of work. (Payment based on levels for finished item of work)
1012.5
-
2863.5
Providing and applying primer coat with bitumen Emulsion (SS-1) on prepared surface of granular base including cleaning the road surface and spraying primer at the rate of 0.70-1.0 Kg/Sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet Mix Macadam & WBM) including contractors profit & Over head charges etc, complete for Prime coat.
6750
-
52.65
Providing and applying tack coat with bitumen Emulsion (Rapid settting-1) using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the prepared bituminous surface cleaned with hydralic broom as per MoRT&H Specification 503 (4th revision) and 503 MORD as directed by the Engineer-in-Charge complete for finished item of work.
6750
-
11.7
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates as per table 500-13 of MORD using penetration grade bitumen 60/70 Grade to serve as wearing course on a previously prepared base, including cost and conveyance of all materials, seigniorage charges, mixing in a suitable plant, laying and rolling with a three wheel 0-100 kN static roller capacity, finished to required level and grades to be followed by seal coat including labour charges, hire charges of T&P and all operational incidental charges complete for finished item of work as per Technical Specification Clause 508 MORD and 511 MORTH.
6750
-
164.6
Earth work excavation by mechanical means for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 Mt, dressing of sides and bottom and backfilling in trenches with excavated suitable material and seigniorage charges complete for finished item of work as per Technical Speicification 305 MORD/304 MORTH with bailing out Water & Mechanical Means.
-
-
98.05
Providing and laying Type 'B' (first class) bedding for pipe of well compacted granular material (gravel) including cost and conveyance of all materials to site, labour charges and seigniorae charges etc., complete for finished item of work as per technical specification clause 1105 of MORD
-
-
364.5
Providing Plain Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site, seigniorage charges and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course
-
-
4788.4
Plain cement concrete (1:3:6) using 40mm , 20mm and 10mm size HBGcrushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, seigniorage charges and all labour charges for machine mixing, laying concrete in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500, 1700, 2100 and 2700 (4th Revision) and 800 and 1211 MORD complete for finished item of work for Levelling course below approach slab.
23.58
-
5165.7
Vibrated Plain Cement Concrete M15 grade using 40mm,20mm & 10mm HBG machine crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost, seigniorage and conveyance of all materials to site and all labour charges for machine mixing, laying in position, compacting, vibrating and curing including all other incidental and all other operational charges of T&P required etc, as per techinical specification MORTH & H 1500,1700,2100( 4th revision) and 802, 803, 1202 &1203 MORD complete for finished item of work for footings of Abutments, Piers, Wing Walls and Raft Foundations
-
-
5170.2
Vibrated Plain Cement Concrete M15 grade using 40mm,20mm & 10mm HBG machine crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost, seigniorage and conveyance of all materials to site and all labour charges for machine mixing, laying in position, compacting, vibrating and curing including all other incidental and all other operational charges of T&P required etc, as per techinical specification MORTH & H 1500,1700,2100( 4th revision) and 802, 804, 805, 806, 807, 1202 &1204 MORD complete for finished item of work for Sub structure for Body Walls, Parapet Walls, Abutments, Piers and Wing Walls.
-
-
4888.15
Vibrated Reinforced Cement Concrete M25 grade using 20mm & 10mm HBG crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost, seigniorage and conveyance of all materials to site and all labour charges for centring, machine mixing, laying in position, vibrating and curing including all other incidental hire and all other operational charges of T&P required etc, complete as per approved drawings and as directed during exection but excluding cost of steel and its fabrication charges for finished item as per MORTH specification 1500, 1600, 1700 & 2200( 4th revision) and 800, 1205.4, 1205.5 MORD and as directed by the Engineer-in-Charge for Deck Slab & Bed Blocks
83.02
-
7313.3
Vibrated Reinforced Cement Concrete M30 grade using 20mm & 10mm HBG crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost, seigniorage and conveyance of all materials to site and all labour charges for centring, machine mixing, laying in position, vibrating and curing including all other incidental hire and all other operational charges of T&P required etc, complete as per drawing BD81-69 (A) but excluding cost of steel and its fabrication charges for finished item as per MORTH specification 1500, 1600, 1700 & 2702 ( 4th revision) and 800, 1205.4, 1206.3 MORD and as directed by the Engineer-in-Charge for finished item of work for wearing coat over Deck Slab
59
-
6395.7
Vibrated Reinforced Cement Concrete M25 grade using 40mm, 20mm & 10mm HBG crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost, seigniorage and conveyance of all materials to site and all labour charges for centring, machine mixing, laying in position, vibrating and curing including all other incidental hire and all other operational charges of T&P required etc, complete as per approved drawings and as directed during exection but excluding cost of steel and its fabrication charges for finished item as per MORTH specification 1500, 1600, 1700 & 2704( 4th revision) and 800, 1211 MORD and as directed by the Engineer-in-Charge for completed for finished item of work for Approach Slab
23.58
-
5457.2
Construction of RCC railing of M25 grade using HBG crushed stone aggregate of size not exceeding 20 mm and fine aggregare conforming to table 1000-2 true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical posts not to exceed 2000mm, leaving adequate space between vertical posts for expansion including cost conveyance of all materials to site and seigniorage charges, labour charges for centring, machine mixing, laying concrete in postition, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution, excluding cost of steel and its fabrication charges as per approved drawings and technical specifications as per MoRT&H 2703, 1500, 1600, 1700 (4t Revision) and 800, 900 and 1208.3 MORD complete for finished item of work as per standard plans of MORTH vide drawing No.SD/202
135.6
-
880.8
Providing weep holes in plain/reinforced concrete Abutments, Return Walls and Wing walls with 100mm Diameter AC pipe extending through the full width of the structure at 1.00mm C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., as per technical specification MoRT&H 2706 & 2200 (4th Revision), 614, 709, 1204.3.7 MORD complete for finished item of work for weep holes.
36.6
-
500.7
Providing and fixing in position 25mm thick mastic pad in expansion joint 650mm deep for fixed ends of simply supported spans, covered with selant including cost and conveyance of all material to site and labour charges as per drawing and technical specifications 1207.2 MORD / 2600 MORTH complete for finished item of work
13.72
-
629.9
Providing and laying filter media using 50% of 150mm IRC soiling stone and 50% of 40mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal seignorage charges and all labour charges as directed by the departmental officers as per drawing and technical sp[ecifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (4th revision) and 1204.3.8 MORD complete for finished item of work
25.13
-
2672.45
Providing and laying pitching on slopes with stone boulders of size not less than 300mm thick other than granite and weighing not less than 40 Kgs as per table 1300.2 and laid grouted with 0.20 cum of Cement concrete 1:4:8 over perpared filter media including cost and conveyance of all materials to site, seigniorage charges and labour charges for packing the stones for Revetment etc., as pet technical specification 1302 MORD & 2504 MORTH (4th Revision) complete for finished item of work on Quadrants
32.4
-
3214.5
Providing and laying stone boulders for apron for bed protection with jeddy stone of minimum size 450 to 600mm other than granite (OTG) and weight as per Table 1300.1, laid dry including cost and conveyance of all materials to site seigniorage charges and labour charges as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH complete for finished item of work
55.8
-
2799.05
Providing HYSD Bars (Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding, binding rods, tying grills, placing them in postition etc., complete including cost and conveyance of binding wire and all handling charges and operation charges etc., and including over lapping welding if required etc., complete for all R.C.C. items for finished item of work as per standard drawing, as per the directions of the Engineer-in-Charge and as per technical specification MoRT&H 1600 & 2200 (4th revision) and 1002, 1005, 1010, 1202 MORD and as per I.S.1786 of 1985 complete for finished item of work for Sub Structure
20
-
54678.4
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including cost and conveyance of all materials, labour charges, centering, etc., complete for finished item of work.
150
-
6566
Construction of Gravel Shoulders with naturally occuring gravel including cost, seigniorage charges and conveyance of all materials to work site and spreading in uniform layers by with motor graded on prepared surface, by mixing by mix in place method with rotovator and compacting with smooth wheeled roller to achieve the desired density at OMC etc., as per MoRT&H specification 401, 407 (4th revision) and 408 MORD as directed by the Engineer-in-Charge complete for finished item of work.
400
-
515.7
Providing, laying Reinforced cement concrete Hume pipes of 1000 mm diameter NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm diameter R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H (4th Revision) Specification Clauses 2900, 2905 & 2906, IRC Special Publication No: 13 and 1106 MORD as directed by the Engineer-in-Charge, complete for finished item of work.
-
-
7780.65
TOTAL NUMBER OF ITMES 26 (TWENTY SIX ) ITEMS ONLY
-
-
-