To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Bhabha Atomic Research Centre - BARC Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date2 Aug 2024
Closing Date17 Sep 2024
Tender Amount₹ 22,60,000 
Notes
Download

Costs

Summary

Barc (v)/tqs/wtp/01, Dated 01.08.2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Work of operation & running of WTP in shift. one shift consists of 8 hours of continuous duty. This may include round the clock operation. Minimum operating staff required for each shift operation shall include Supervisor (Degree in B.sc,/ Diploma in Mechanical/chemical) with two years min experience, and Technician (Electrical/Mechanical) (ITI) with two years minimum experience. Scope of work for this item includes but not limited to the conducting jar testing, Dosing estimation, mixing of chemicals, operation of plant & its equipment, checking water quality, maintaining log records, keeping the plant in running condition, any other work as directed by dept supervisor regarding WTP operation.

365

-

-

... More
Supply of chemicals for running of water treatment plant. All chemicals shall be food graded only. Food graded test certificate from chemical supplier shall be submitted.

-

-

-

... More
Supply of coagulant for raw water treatment

25

-

-

... More
Supply of Flocculant for raw water treatment

12

-

-

... More
Supply of sodium hypo chlorine for disinfection

25

-

-

... More
Pumps spare parts:

-

-

-

... More
Raw water Pump: Pump Make: Johnson SPX flow Model No: KGEC, 12B-5 Motor make: Bharat Bijilee Pump motor capacity: 3HP

-

-

-

... More
Impeller (CI)

1

-

-

... More
Shaft (SS)

1

-

-

... More
Gasket set

1

-

-

... More
Flap Valve

1

-

-

... More
Mechanical Seal

1

-

-

... More
Oil seal

1

-

-

... More
pump Bearing set

1

-

-

... More
Suction cover

1

-

-

... More
Motor bearing set

1

-

-

... More
Filter Feed water Pump: Pump Make & Model No.: Johnson SPX flow, KGEC 16-6. Motor Make: Bharat Bijilee Pump motor capacity: 7.5Hp

-

-

-

... More
Impeller (CI)

1

-

-

... More
Shaft (SS)

1

-

-

... More
Gasket set

1

-

-

... More
Flap Valve

1

-

-

... More
Mechanical Seal

1

-

-

... More
Oil seal

1

-

-

... More
pump Bearing set

1

-

-

... More
Suction cover

1

-

-

... More
Motor bearing set

1

-

-

... More
Supply, Installation & Testing of Dosing/metering pump of the following specification. This item is proposed to be executed if any new additional dosing system is proposed by Contractor as standby to existing dosing system. Flow: Min 12 LPH at the Injection pressure of min 2 Kg/Cm2. Type: Electro magnetically actuated diaphragm type. Power Supply to drive unit: 230V, 50Hz, Single phase power supply. This item includes dosing/metering pump, suction foot valve, injection valve, suction & delivery side tubing (total length of tubing shall be minimum 5 meter which includes both suction & delivery side piping), antisyphon valve, standard length cable comes along with OEM of pump, syntex tank of apprx size not less than 200Ltr for dosing chemical preparation, back pressure valve, standard nuts and bolts and any other accessories required for installation and proper function of dosing pump.

2

-

-

... More
Cleaning of RCC tanks which are used for storage of Raw and treated waters in the WTP premises. Each RCC water tank size is apprx. 4.5 x 6.5 x 3.2 meter. Scope of work: Supply of man power, machinery, tools, safety instruments, cleaning chemicals etc., for cleaning of RCC water tanks. Removal of sand, silt, small stones & dislodging of algae etc., from the water tanks and disposing the same to a distance of not more than 50 meter from the tank. Emptying of waste water from the RCC water tanks which will be obtained during cleaning using dewatering pump. After completion of cleaning in all respects, thoroughly disinfecting the tank with bleaching powder as per Department Engineer instructions.

4

-

-

... More
Testing & Submission of water quality reports obtained from NABL certified laboratory for both Raw & treated waters once in every month. Parameters needs to be tested are as follows: Turbidity, PH, Residual chlorine, TDS, Total Hardness, Total alkalanity, Color, odour.

12

-

-

... More
Supply installation testing & commissioning of Turbidity meter system to check turbidity of water quality. Specification is as follows: Calibration: Automatic, Range 0-1000 NTU, Resolution: 0.01,0.1,1 for turbidity in various ranges between 0-1000NTU, Turbidity accuracy : +/- 2%,, calibration cuvvet kits, empty cuvvets, power supply adapter, cables, charging battery, carrying case, manuals etc all other accessories required for proper functioning of turbidity meter is in the scope of this item. Warranty: one year minimum. Make: Thermofisher scientific, Hach, or equvelent.

1

-

-

... More
Operation & Annual maintanance of treated water supply distribution system at Anuvihar colony

-

-

-

... More
Annual maintanance of treated water supply distribution system consists of following equipment: Treated water distribution system chiefly comprises of 2 No's of horizantal base mounted flexible coupled centrifugal pumps (15HP) , and one (01) no of submerssible pump (3HP), piping network connecting from Treated water storage tanks to various housing quarters located at various locations of Anuvihar colony, isolation valves(GM gate) , butterfly valves, float valves installed at roof mounted over head tanks of quarters, air release valves etc. Drawing of Treated water distribution system is attached as Annexure-D. Major piping and valves quantity needs to be considered for this AMC is attached as Annexure -E. Work nature: Treated water obtained from WTP plant shall be stored in the existing treated water storage tanks located near WTP premises. This stored treated water shall be supplied to various housing quarters of anuvihar colony using treated water distribution pumps installed at WTP premises via distribution piping (GI/MS pipe) network which is mostly under ground carbon steel piping. As per water supply requirement valves needs to be adjusted daily. For this water distribution AMC work, payment shall be made through individual items as mentioned below. O&M of pumps shall be paid through item/Sl.no 11,13. spare parts required for O&M of treated water distribution pumps shall be paid through item/Sl. no 12. supply of man power shall be paid thorugh BOQ item 14. For any repair work in existing piping, or in valves of Treated water supply distribution system considered for this AMC work, payment shall be paid through items/ Sl. no. of BOQ 15, 16 & 17 as and when repair requirement arises. For any new piping systems which needs to be extened to the existing system shall be paid through item/Sl. no 18, 19.

-

-

-

... More
Maintanance of Treated water distribution pumps of 2No's along with its motors, isolation valves, NRV, strainer, interconnection (from storage tank to discharge header line) SS piping, pressure gauges, fittings, all other accessories making system operational. Pump Make & Model No.: Johnson SPX flow, CN 32-250. Motor make: Bharat Bhijilee. Pump motor capacity: 15Hp Major spare parts of pumps required during operation & maintanance shall be paid through item no B2. If any spares parts or consumables which are not covered in item B2 will automatically comes under this item and no seperate payment will be made in this regards.

12

-

-

... More
Treated water distribution Pump spare parts: Major Spare parts required to keep treated water distribution pumps (of BOQ item no B1) in running condition are mentioned below: Pump Make & Model No.: Johnson SPX flow, CN 32-250. Motor make: Bharat Bhijilee. Pump motor capacity: 15Hp

-

-

-

... More
Impeller (CI)

1

-

-

... More
Shaft (SS)

1

-

-

... More
Sleeve (SS)

1

-

-

... More
Gasket set

1

-

-

... More
Mechanical Seal

1

-

-

... More
pump Bearing set

1

-

-

... More
Motor bearing set

1

-

-

... More
Maintanance of submersible pump (3HP ) of qty 1 No, which is used as a Standby pump for treated water distribution during lean period. Make of submerssible pump: Falcon. Model: VRS series. Body: SS, Capacity: 3Hp. Any spare parts, lubrication oils, consumables etc consumed during operation & maintanance of this pump shall be comes under this item only and no seperate payment will be made. Consumables like grease etc needs to be applied and pumps needs to be maintained as per OEMs reccomendation.

12

-

-

... More
Work of operation of treated water distribustion system in shift. One shift consists of 8 hours of continuous duty. This may include round the clock operation. Minimum operating staff required for each shift operation shall include one no of Technician (plumer/fitter) (ITI) with two years minimum experience. Scope of this work includes operation of Treated water distribution pumps mentioned in item 11 & 13 of this BOQ, operation of valves to supply treated water to colony quarters as per water demand, maintaining of log books, any other work as directed by department supervisor regarding water supply distribution system.

365

-

-

... More
Leakage arrestation work in GI/MS carbon steel pipe work through welding,cutting, plumbing etc including supply of man power, tools, tackles, safety instruments, consumables, required fittings to complete the work as per direction of EIC. This item does nt includes under ground excavation, supply of pipe material for which seperete item is available in this BOQ.

-

-

-

... More
GI/MS pipe of upto 50mm NB, for one leakage joint arrestation.

4

-

-

... More
GI/MS pipe of from 60-80mm NB, for one leakage joint arrestation.

2

-

-

... More
GI/MS pipe of 100 mm NB, for one leakage joint arrestation.

2

-

-

... More
GI/MS pipe of 200 mm NB, for one leakage joint arrestation.

1

-

-

... More
Under ground earth work excavation to locate pipeline during leakage arrestation. This work includes under ground excavation by using manual or mechanical means in all types of soils other than hard rock including supply of man power, tools, tackles etc as per direction of department supervisor.

7.5

-

-

... More
Repair, rectification, if requires complete replacement of existing following valves (Gate,butterfly, ball, float, air release) to bring items in working condition, making leak proof and also to keep the existing water supply distribution system network operational in colony. This item includes supply of man power for repair, tools, tackles, spare parts and also if requires complete change of valve.

-

-

-

... More
200mm NB Dia. Gate valve. Body is CI/DI, resilent seated.

1

-

-

... More
200mm Dia. Butterfly valve. Body is CI/DI, resilent seated.

1

-

-

... More
100mm NB butterfly valve. CI/DI body, resilient seated.

1

-

-

... More
40mm/50mm NB GM gate valve

6

-

-

... More
40mm/50mm NB butterfly valve

2

-

-

... More
50mm NB Air release valve. CI/DI body.

2

-

-

... More
80mm NB Air release valve. CI/DI body.

1

-

-

... More
40mm to 65 mm NB, SS ball valves

4

-

-

... More
Copper alloy float valves from 40mm upto 50mm NB, installed in over head tanks of residential quarters

8

-

-

... More
Supply, installation & testing of GI pipe line through plumbing, cutting, welding, jointing etc as leakproof including all necessary fittings like bends, reducers, Tees etc to complete the work in all aspects. This job also includes supply of man power, tools, tackles for installation & testing. This job needs to be done as an extension to the existing system whenever need arises.

-

-

-

... More
GI pipe 25mm NB, heavy duty thickness

40

-

-

... More
GI pipe 40mm NB, heavy duty thickness

20

-

-

... More
GI pipe 50mm NB, heavy duty thickness

20

-

-

... More
GI pipe 80 mm NB, heavy duty thickness

5

-

-

... More
GI pipe 100mm NB, heavy duty thickness

5

-

-

... More
SIT & C of following new valves including necessary fittings, accessories including supply of manpower, consumables as required for complete installation of valve as an extension to the existing water supply distribution system whenever new requirement araises as per direction of EIC.

-

-

-

... More
25mm NB GM Gate valve

6

-

-

... More
50mm NB GM Gate valve

4

-

-

... More
25mm NB Copper alloy float valve at roof mounted over head tank

2

-

-

... More
50mm NB Copper alloy float valve at roof mounted over head tank

4

-

-

... More
25mm NB Air release valve. Body: CI/DI

4

-

-

... More
50mm NB Air release valve Body: CI/DI

2

-

-

... More
Supply & application of grease for various valves as per direction of EIC

4

-

-

... More
Painting: Two coats of primer (redoxide or any suitable) followed by two coats of enamel (or coal tar/epoxy) painting for various equipment of treated water supply distribution system including piping, valves as per direction of EIC.

120

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.