West Bengal Mayel Lyang Lepcha Development Board Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal Mayel Lyang Lepcha Development Board Tender
Eprocure
Opening Date20 Aug 2019
Closing Date2 Sep 2019
Tender Amount₹ 5,85,423
Costs
EMD
₹ 11,708Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_MLLDB_238714_1Bid Award Id
ViewTender No
NIT/WBMLLDB/001/2019-20Tender Authority
West Bengal Mayel Lyang Lepcha Development Board ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(a) Depth of excavation not exceeding 1,500 mm.
-
-
-
... More
At ground
70.27
8381
119.27
... More
e) Add extra for cutting lateriate/sandstone
-
-
-
... More
1) Cutting with chisel
-
-
-
... More
Foundation
41.7
7287
174.75
... More
Rubble masonry in cement (1:4) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site
-
-
-
... More
(a) In Road and Jhora Work
-
-
-
... More
Wall
13.02
61559
4728
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks ofapproved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
-
-
-
... More
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
-
-
-
... More
Wing wall
172.87
57739
334
... More
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
-
-
-
... More
(i) (1:3:6) proportion
-
-
-
... More
Wing wall
81.74
324083
3964.8
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
-
-
-
... More
(ii) River Bazree
-
-
-
... More
R-beam
3.09
22367
7238.4
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
-
-
-
... More
(a) For works in foundation and upto roof of groundfloor/upto 4 m
-
-
-
... More
(i) Tor steel/Mild Steel
-
-
-
... More
I. SAIL/ TATA/RINL
-
-
-
... More
Assuming 1.2% of Ordinary cement Concrete.
0.49
43371
88513.2
... More
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
-
-
-
... More
At bed
42.54
2723
64
... More
Stone Boulder 150 mm of N. Bengal variety
-
-
-
... More
volume of boulder soling -
6.38
8115
1272
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
-
-
-
... More
(b) River bazree
-
-
-
... More
At bed
6.38
40646
6370.8
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
-
-
-
... More
(ii) With 1:4 cement mortar
-
-
-
... More
(b) 15 mm thick plaster
-
-
-
... More
Side wall
40.8
8617
211.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements