Oil India Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Oil India Limited Tender
GEM
Opening Date31 Jan 2025
Closing Date4 Mar 2025
Tender AmountRefer Documents
Costs
EMD
₹ 1,57,250Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
GEM/2025/B/5891797Tender No
GEM/2025/B/5891797Tender Authority
Oil India Limited ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
list-of-categories-where-trials-are-allowed_1712126171.pdf
BOQ Items
... More
Third Party Certification: Charges towards Third party certification & vetting of Structural Assessment Report by IIT or any other reputed Govt. institution.
1
-
-
... More
Maintenace & Tightening of bolts: Maintenance & tightening of bolts, “U” bolts of tower
1
-
-
... More
Revamping of Towers Earthing: Revamping of Earthing system of the towers as per IS 3043 standard.
Each tower 4 earth Pits . Bills shall be on actual no. of earth pits revamped.
1
-
-
... More
Wiring of Tower Lamps: Wiring of all Tower lamps including top avialation lamp from existing Electrical junction board near the base of the tower. The wiring shall be completed upto the MCB switch near the base of the tower which shall be not more than 30 m from the base of the tower
1
-
-
... More
Fitting of new Lamp holders: Replacement of existing lamp holders with weatherproof lamp holders
1
-
-
... More
Lightning Counters/Arrestors: Supply & installation of Lightning Counters or Arrestors
Only damaged or deteriorated Lightning arrestors shall be changed.
These items shall be billed on actuals.
1
-
-
... More
As built diagrams: Preparation of “As built” diagram of the towers
Soft & Hard Copy (2 Nos.)
1
-
-
... More
Tower Painting: Tower painting as per IS codes
1
-
-
... More
Tower Health Checkup 51m - 75m
-
-
-
... More
Site Survey: Site Survey for data collection & health check-up, Design Analysis & calculation of Tower structural adequacy for current loading & status
3
-
-
... More
Foundation Check up: Foundation Health Check with NDT UPV & Rebound Hammer. (Assessment on the exposed surface above ground level).
3
-
-
... More
Third party Certification: Charges towards Third party certification & vetting of Structural Assessment Report by IIT or any other reputed Govt. institution.
3
-
-
... More
Maintenace & Tightening of bolts:Maintenance & tightening of bolts, “U” bolts of tower
3
-
-
... More
Revamping of Towers Earthing: Revamping of Earthing system of the towers as per IS 3043 standard
Each tower 4 earth Pits . Bills shall be on actual no. of earth pits revamped.
3
-
-
... More
Wiring of Tower Lamps: Wiring of all Tower lamps including top avialation lamp from existing Electrical junction board near the base of the tower. The wiring shall be completed upto the MCB switch near the base of the tower which shall be not more than 30 m from the base of the tower
3
-
-
... More
Fitting of new Lamp holders: Replacement of existing lamp holders with weatherproof lamp holders
3
-
-
... More
Lightning Counters/Arrestors: Supply & installation of Lightning Counters or Arrestors
Only damaged or deteriorated Lightning arrestors shall be changed.
These items shall be billed on actuals.
3
-
-
... More
As built diagrams: Preparation of “As built” diagram of the towers
Soft & Hard Copy (2 Nos.)
3
-
-
... More
Tower Painting: Tower painting as per IS codes
3
-
-
... More
Tower Health Checkup 76m - 100m
-
-
-
... More
Site Survey:Site Survey for data collection & health check-up, Design Analysis & calculation of Tower structural adequacy for current loading & status
-
-
-
... More
Foundation Check up: Foundation Health Check with NDT UPV & Rebound Hammer. (Assessment on the exposed surface above ground level).
1
-
-
... More
Third Party Certification: Charges towards Third party certification & vetting of Structural Assessment Report by IIT or any other reputed Govt. institution.
1
-
-
... More
Maintenace & Tightening of bolts: Maintenance & tightening of bolts, “U” bolts of tower
1
-
-
... More
Revamping of Towers Earthing: Revamping of Earthing system of the towers as per IS 3043 standard
Each tower 4 earth Pits . Bills shall be on actual no. of earth pits revamped.
1
-
-
... More
Wiring of Tower Lamps: Wiring of all Tower lamps including top avialation lamp from existing Electrical junction board near the base of the tower. The wiring shall be completed upto the MCB switch near the base of the tower which shall be not more than 30 m from the base of the tower
1
-
-
... More
Fitting of new Lamp holders: Replacement of existing lamp holders with weatherproof lamp holders
1
-
-
... More
Lightning Counters/Arrestors: Supply & installation of Lightning Counters or Arrestors
Only damaged or deteriorated Lightning arrestors shall be changed.
These items shall be billed on actuals.
1
-
-
... More
As built diagrams: Preparation of “As built” diagram of the towers
Soft & Hard Copy (2 Nos.)
1
-
-
... More
Tower Painting: Tower painting as per IS codes
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%