New Town Kolkata Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

New Town Kolkata Development Authority - NKDA Tender

Services
Eprocure
Opening Date23 Oct 2019
Closing Date13 Nov 2019
Tender Amount₹ 2,77,58,928 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Wbnkda/23/ee-i/nkda/2019-20 -2nd Call- Supply, Erection, Commissioning, Operation And Maintenance -for 03 Years Of Prefabricated Single Tank Based Modular Biogas Plant In Connection With Solid Waste Management At New Town, Kolkata Under Nkda

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Feeding tank in S.S, with SS table for segregation

2

486080

243040

... More
Standard Control panel with On/Off Switch

1

132160

132160

... More
Pressuring aeration system (primary digestor) / Air Compressor

1

84000

84000

... More
Internal Wiring

1

39200

39200

... More
Gas piping* (100 mtrs if required) 25 NB upto GENSET

1

33600

33600

... More
Valves as required (SET)

1

20160

20160

... More
Instrumentation, Temperature / pH / Pressure / Flare

2

156800

78400

... More
Thermowell with heaters 5 kW X 2

2

492800

246400

... More
Biogas flaring unit

1

151200

151200

... More
Gas Storage Balloon 100 m3 (it can be either single unit or two unit, it will be based on actual site condition)

2

604800

302400

... More
Moisture and Hydrogen Sulphide filter column

2

145600

72800

... More
Pressure Regulator / Gauge

2

26880

13440

... More
Flame Arrester in Biogas Pipe line

1

8848

8848

... More
Biogas meter Digital

1

277760

277760

... More
Special Biogas Genset of 20 X2 kVA, Ashok Leyland /Kirolaskar equivalent make

2

3019520

1509760

... More
Mechanical Commissioning of Plant

1

302400

302400

... More
Biological Commissioning of Plant

1

237440

237440

... More
Transportation Cost

1

481600

481600

... More
Civil Work : Foundation for Biogas Digester Segregation room, along with vitrified tiles, approx 500 Sq.ft Feed handling system: 10m X 10m (min. size) steel structure shed (1.5m brick wall + 3m GI sheeting on sides) Manure pits : HDPE / as per site condition: of appropriate size & nos in brickwork & plaster, with filter media. Balloon storage: Metal safe protective enclosure on the top of digester Engine shed/ enclosure Size 2.5m X 1.5m X 2.5m (min), open shed/ enclosure with angle and sheets on top. Water storage tank : of HPDE / LDPE or equivalent make (30000 Liter capacity)

1

1767360

1767360

... More
Operation & Maintenance : Maintenance of the entire Biogas System including Pump , Heater, Biogas Genset and other accessories etc for 3 years including the defect liability period of 1 year

-

-

-

... More
1st year (DLP)

-

-

-

... More
2nd Year (Rs.62,500 / Month)

1

885000

885000

... More
3rd Year (Rs.62,500 / Month)

1

885000

885000

... More
Operation & Maintenance : Operation of the system including secondary segregation of waste, feeding the waste into digester, full operation of biogas plant, supplying the gas into Biogas genset and performance record of the Biogas plant with adequate 10 Nos of Labourer and 01 Supervisor

-

-

-

... More
1st year (Rs. 1,75,000 / Month)

12

2478000

206500

... More
2nd year (Rs. 1,75,000 / Month)

12

2478000

206500

... More
3rd year (Rs. 1,75,000 / Month)

12

2478000

206500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.