National Highways And Infrastructure Development Corporation Limited Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date24 Mar 2025
Closing Date8 Apr 2025
Tender AmountRefer Documents
Costs
EMD
₹ 35,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Pmc Work For Widening To 2l With Ps And Slope Protection Works From Km 0.000 To 52.100 Ie Rangpo To Sevoke Section Of Nh-10 In West Bengal
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_NHIDC_854294_1Tender No
NHIDCL/HQ/NH-10/PMC/2025Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Highway cum pavement Engineer 1 No.
6
-
-
... More
Material Engineer cum Geotechnical Engineer cum Geologist 1 No.
6
-
-
... More
Senior Survey Engineer 1 No.
12
-
-
... More
Road/ Traffic Safety Expert 1 No.
4
-
-
... More
Environmental Specialist 1 No.
8
-
-
... More
Quantity Surveyor cum Documentation Expert 1 No.
8
-
-
... More
Land Acquisition Expert 1 No.
10
-
-
... More
Utility Expert 1 No.
10
-
-
... More
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
-
-
-
... More
Sub-Professional-1
14
-
-
... More
Sub-Professional-2
14
-
-
... More
Sub-Professional-3
14
-
-
... More
Sub-Professional-4
14
-
-
... More
Sub-Professional-5
14
-
-
... More
Sub-Professional-6
14
-
-
... More
Sub-Professional-7
14
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager (1 No)
14
-
-
... More
Office Boy (1 No)
14
-
-
... More
Typist (1 No)
14
-
-
... More
Night Watchman (1 No)
14
-
-
... More
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 4000km/month run
-
-
-
... More
Bolero or equivalent 4x4 vehicle (2 nos.)
28
-
-
... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office/HQ. The quoted amount against remuneration should include Hotel Charges, travel costs etc. complete
1
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
... More
Office rent (Fixed Costs)
14
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
-
-
-
... More
Time period
14
-
-
... More
Office Furniture and Equipment (Rental) :
-
-
-
... More
Office Furniture and Equipment
1
-
-
... More
Reports and Document Printing
-
-
-
... More
Monthly report (3 copies per Month)
42
-
-
... More
Inception Report & QAP
3
-
-
... More
Environment and Social Impact Screening Report
4
-
-
... More
Draft Feasibility Report
4
-
-
... More
Final Feasibility Report
6
-
-
... More
Strip Plan with LA Reports
6
-
-
... More
Draft LA and Clearances I Report
4
-
-
... More
Final LA and Clearances I Report
4
-
-
... More
Draft Environmental Assessment Report & RAP
4
-
-
... More
Final Environmental Assessment Report and RAP
6
-
-
... More
Draft Detailed Design Report & Drawings etc.
4
-
-
... More
Draft EMP
4
-
-
... More
Draft Bidding Documents
4
-
-
... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
6
-
-
... More
Final EMP.
6
-
-
... More
Final Bidding Documents
6
-
-
... More
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
9
-
-
... More
LA & Clearances II Report
6
-
-
... More
IX. Survey and Investigation:
A. Topographical Survey (Fixed Rate)
-
-
-
... More
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
1
-
-
... More
Detailed topographic surveys using mobile/ aerial LiDAR including Bathymetric LiDAR etc.
1
-
-
... More
B. Investigation (Fixed Cost)
-
-
-
... More
Road and Bridge Inventory
1
-
-
... More
FWD Test and Pavement Evaluation
1
-
-
... More
Roughness Survey
1
-
-
... More
Axle Load Survey
1
-
-
... More
Material Survey and Investigation
1
-
-
... More
Sub-grade Investigation
1
-
-
... More
Traffice Survey
1
-
-
... More
Socio-economic & Census Survey/Studies
1
-
-
... More
Land Acquisition Studies
1
-
-
... More
Any other Investigations/Surveys etc. as per site requirement
1
-
-
... More
Sub-Soil Investigation (Boring)
-
-
-
... More
Boring in all type of soils (other than hard rock)
1500
-
-
... More
Boring in hard rock
200
-
-
... More
C. Network Survey and GPR
-
-
-
... More
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.
1
-
-
... More
GPR Survey for detection of under ground utilities
1
-
-
... More
X. Cost of Supply and Fixing Boundary pillars
-
-
-
... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25, 1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/orconstruction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
1
-
-
... More
XI. Land Acquisition Team including support staff and logistics/ transportation.
A. Land Acquisition Team including support staff :
-
-
-
... More
Ex-Land Revenue Inspector/ Officer or equivalent
(1)
6
-
-
... More
Ex-Kanoogo/Girdwar or equivalent (1)
6
-
-
... More
Ex-Patwari or equivalent (1)
6
-
-
... More
Typist (1)
6
-
-
... More
Peon (1)
6
-
-
... More
B. Logistics for Land Acquisition Team
-
-
-
... More
Computer including necessary peripherals
(2)
12
-
-
... More
Printers (2)
12
-
-
... More
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
(1)
6
-
-
... More
Estimate of Local Currency costs
B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE)
I. REMUNERATION FOR LOCAL PROFESSIONAL STAFF A. Professional Staff
(Construction Period 30 months + DLP 60 months)
-
-
-
... More
Team Leader cum Senior Highway Engineer 1 No.
45
-
-
... More
Resident cum Highway Engineer 1 No.
90
-
-
... More
Senior Bridge/ structural Engineer 1 No.
34
-
-
... More
Senior Pavement Specialist 1 No.
30
-
-
... More
Senior Quality cum Material Expert1 No.
24
-
-
... More
Road / Traffic Safety Expert 1 No.
40
-
-
... More
Geotechnical Engineer cum Geologist 1 No.
30
-
-
... More
Sub-Professional Staff
-
-
-
... More
Survey Engineer, 1 Nos.
40
-
-
... More
Assistant Highway Engineer 2 Nos.
(30 months x 2 + 60 months x1)
120
-
-
... More
CAD Expert, 1 No.
10
-
-
... More
Environmental Engineer, 1 Nos.
8
-
-
... More
Assistant Bridge Engineer, 1 Nos.
24
-
-
... More
Assistant Quality cum Material Engineer, 2 Nos. (2 x 30 months)
60
-
-
... More
Electrical Engineer, 1 Nos.
9
-
-
... More
HTMS/ Toll Expert , 1 No.
3
-
-
... More
Quantity Surveyor, 1 Nos.
38
-
-
... More
Horticulture cum Landscaping Expert, 1 Nos.
6
-
-
... More
Lab Technician, 1 Nos.
30
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager (1 No)
90
-
-
... More
Accountant cum Cashier (1 No)
90
-
-
... More
Steno cum Computer Operator (1 No)
90
-
-
... More
Office Boy (1 No)
90
-
-
... More
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 4000km/month run
-
-
-
... More
Vehicle (2400 cc & above and not more than 1 years old) during construction period ( 2 No.s for 30 month each)
60
-
-
... More
Vehicle (2400 cc & above and not more than 1 years old) during DLP ( 1 No.)
60
-
-
... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office/HQ. The quoted amount against remuneration should include Hotel Charges, travel costs etc. complete for 25 round trips to Employer HQ and 25 round trips to Employer RO Office
1
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
... More
One Office of Minimum 200 sqm area shall be rented . The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete.
90
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
-
-
-
... More
Time period
90
-
-
... More
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
-
-
-
... More
Time Period
90
-
-
... More
Reports and Document Printing
-
-
-
... More
Monthly reports
270
-
-
... More
Half yearly Reports
45
-
-
... More
Various other reports as provided in the Concession Agreement such as Completion Report
12
-
-
... More
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
-
-
-
... More
Surface defects detection and roughness measurement
using Network Survey Vehicle (52.1 kms x 8 times)
417
-
-
... More
Pavement strength measurement using FWD (52.1 kms x 4 times)
208
-
-
... More
Bridge inspection using Mobile Bridge Inspection Unit (52.1 kms x 8 times)
417
-
-
... More
Road signs inspection using Retro Reflectometer (52.1 kms x 8 times)
417
-
-
... More
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%