Military Engineer Services Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Military Engineer Services - MES Tender

Services
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date28 Oct 2024
Closing Soon7 Dec 2024
Tender Amount₹ 24,77,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Notes: 1. Ground data. (a) Approximate length of existing drain = 55.5 Kilometer. (b) Site plan of area, position of existing drain & manholes, soil conditions, location of water body, postiton of Married/ OR/ OTM accomodations on visit of representative of contractor at site before quoting of bid. No representation of bidder will be entertained after commencement of work for not having ground data. (No grey water will be connected to drains.) (c) Evaluate adequacy of existing drains and drainage system (including culverts) and in case the existing sections were found inadequate, the appropriate solution of increasing the capacity has to be done. (d) Design of new drains. (It is desirable to start the design considering the levels at the outfall of drainage locations of drainage system so that the level and bed slopes of the drain are fixed accordigly as per outfall. To allow discharge to pass in gravity flow.

-

-

-

... More
1. Deliverables & Time and completion: (a) For STAGE I: INCEPTION REPORT (As stated under BOQ item No. 1.01.) :- C+30 (C=commencement date as mentioned in work order no. 1) All details as mentioned under BOQ item No 1.001 would be submitted in four sets of hard & soft copy withing 60 days from from the commencement date as mentioned in work order no. 1 and take approval from GE Panagarh within 10 days from submission of report. Completion certificate will be issued by GE Panagarh. (b) STAGE -II (DPR) (As stated under BOQ item No. 1.002) :C+105 (C=commencement date as mentioned in work order no. 1) All details including Structural drawings & Design duly vetted by IIT as mentioned under BOQ item No 1.02 would be submitted in four sets of hard & soft copy withing 60 days from the commencement date as mentioned in work order no. 1 and take approval from GE Panagarh within 45 days from submission of report. Completion certificate will be issued by GE Panagarh. (c) DPR including all details related for drainage system including Hydraulic design of drain (gravity flow) design and type of drain (PCC/RCC/masonry) layout of drain (existing and proposed) etc.

-

-

-

... More
Payment schedule: (a) Necessary Site clearance for survey should be done by the bidder at his own arrangement as per site requirement. (b) Total quoted rate in the BOQ item shall include GST for above mentioned work & deliverables. (i) 30% of contract amount on submission of Inception Report (Stage-I). (ii) 50% of contract amount on approval of Detailed Project Report (DPR) (Stage-II). (iii) Rest 20% payment post completion of construction of drainage system work by other agencies.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.