Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Eprocure
Opening Date27 Nov 2024
Closing Date7 Dec 2024
Tender Amount₹ 3,29,497 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1)

39.52

361

14266.72

... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for excavation works (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charg(e).With 3.75 cm. thick timber planks. For trench width upto 1.0 M a)  Depth upto 3.00 M below G.L.

6.4

496

3174.4

... More
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.(a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10)

3.68

4761

17520.48

... More
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.(b) 1:4:8 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10)

3.58

4566

16346.28

... More
Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe lin(e). A) Class NP-3 Pipe r) 300 mm dia

35

169

5915

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

32.39

77

2511.52

... More
Construction of manhole with chamber of size as given below as per requirement without shaft with cement brick work (1:4) over 150mm. thick jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4)  in the invert with 20mm. thick cement plastering (1:4) finished fine with neat cement 1.50 mm. thick in the inside walls and invert, including supplying, fitting and fixing R.C.P.C. manhole cover & frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4)  & C.I. steps (4kg. Each) including cutting hard crust, excavation, dewatering, back filling and removal of spoils but excluding shoring complete as per standard drawing . (Depth of invert shall be between 1.25 m. and 1.80 m. below G.L.) i) Average depth of invert 1.25 m. below G.L with 250 mm. thick brick work b) Above 400 mm to 600 mm dia having internal size (1500mmx1100mm)

1

31347

31347

... More
Construction of manhole with chamber of size as given below as per requirement without shaft with cement brick work (1:4) over 150mm. thick jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4)  in the invert with 20mm. thick cement plastering (1:4) finished fine with neat cement 1.50 mm. thick in the inside walls and invert, including supplying, fitting and fixing R.C.P.C. manhole cover & frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4)  & C.I. steps (4kg. Each) including cutting hard crust, excavation, dewatering, back filling and removal of spoils but excluding shoring complete as per standard drawing . (Depth of invert shall be between 1.25 m. and 1.80 m. below G.L.) ii) Addition to rate of manhole chamber without shaft    as per above item  for each addition in depth of 150 mm. or part thereof.  With 250 mm. thick brick work b) Above 400 mm to 600 mm dia having internal size (1500mmx1100mm)

2

3762

7524

... More
Constructing Special Inspection chamber pit (size 900 mmX600 mm) to a depth of 1.15 metre (insid(e), 250 mm thick 1st class brick work (1:4) in all sides over a layer of jhama brick soling and 150 mm thick Jhama cement concrete  (1:4:8) including necessary earth work, invert with ordinary cement concrete (1:2:4) with stone chips over brick-on-edge flooring, plastering inside  with 20 mm thick cement plastering (1:4) and neat cement punning, including supplying,fitting and fixing one 450 mm. dia (15 MT) heavy duty RCPC manhole cover of approved make with R.C.C. slab of 100 mm thick with cement concrete (1:1.5:3) with stone chips including necessary reinforcement, shuttering and CI foot steps (4 kg each) (Depth of invert between 1.15 m to 1.80 m below G.L.)

3

18392

55176

... More
Constructing Special Inspection chamber pit (size 900 mmX600 mm) to a depth of 1.15 metre (insid(e), 250 mm thick 1st class brick work (1:4) in all sides over a layer of jhama brick soling and 150 mm thick Jhama cement concrete  (1:4:8) including necessary earth work, invert with ordinary cement concrete (1:2:4) with stone chips over brick-on-edge flooring, plastering inside  with 20 mm thick cement plastering (1:4) and neat cement punning, including supplying,fitting and fixing one 450 mm. dia (15 MT) heavy duty RCPC manhole cover of approved make with R.C.C. slab of 100 mm thick with cement concrete (1:1.5:3) with stone chips including necessary reinforcement, shuttering and CI foot steps (4 kg each) (Depth of invert between 1.15 m to 1.80 m below G.L.) ii) Addition and deduction of rate of special inspection chamber pit as per above item  for each addition or reduction in depth of 150 mm. or part thereof.

5

1053

5265

... More
Constructing catch pit to a depth of 1.0m (Insid(e) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (150mm dia) with topping RCPC gully grid (5MT load bearing capacity) constructing invert with brick -on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 100mm th. R.C.C. slab (1:1.5:3)  with stone chips including necessary reinforcement, shuttering as per standard drawing  and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials. Inside measurement of catch pit,  600mm X 525mm

6

12175

73050

... More
Manhole connection (upto 450 mm. dia.) including mending good all complete with (1:2:4) cement concrete as per specification and direction of Engineer-in-charge.

1

388

388

... More
Sub Total

-

-

-

... More
GST 18%

1

49738

49738.15

... More
CESS 1%

1

3262

3262.35



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.