Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Eprocure
Opening Date7 May 2021
Closing Date10 Jun 2021
Tender Amount₹ 8,35,96,792 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 10,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IWD_330625_1Bid Award Id
ViewTender No
WBIW/SE/EC/NIT-01(e)/2021-22Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
A) Depth of excavation not exceeding 1,500 mm.
1250
-
13491.82
... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, channels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
A) Beyond 500 metre and upto 1.00 km.
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge [The rate is inclusive of Royalty & Cesses Charges and Compensation for earth for land owned/arranged by the contractor. Royalty payment certificate in original from competent authority are to be produced along with the bill, otherwise amount due towards Royalties @ Rs. 29.00/Cum & Cesses Charges @ Rs. 5.30/Cum will be deducted from the bills of works] Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
67215
-
313.69
... More
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
A) 15 cm av. Diameter.
1052.5
-
245.47
... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
A) 15 cm av. diameter.
842
-
118.78
... More
Making sausages Square or Rectangular in section (any length) made with 1st class kiln burnt / 1st class picked jhama full bricks rolled inside with 10 S.W.G. galvanised square pattern (internal dimension of mesh will be 100 m.m. x 100 m.m. square) galvanised wirenet caging with proper lapping of minimum 150 m.m, and sewing with 12 S.W.G. galvanised wire including cost of all materials, carriage upto site, placing and laying the same in position, after preparing the bed to proper slope etc. complete as per direction of the Engineer-in-charge. (cost is excluding the cost of end pieces.) A) 1.0 metre x 1.0 metre nominal section.
1250
-
4918.46
... More
Providing and laying pre-cast brick block pitching of required size (53 Cm. x 53 Cm, x 25 Cm. or as directed by the Engineer-in-charge ) with 1st class kiln burnt bricks in cement mortar including flush pointing on all faces except exposed face which to be plastered with 19 m.m. thick cement plaster , curing, dressing, ramming & preparing subgrade in slopes & bed complete with necessary earth work not exceeding 300 mm in depth with all leads & lifts including cost of all materials/ blocks up to site by all means of transport. The gap between adjacent blocks will not be more than 10 m.m. (Sand, cement mortar mix for making blocks, pointing & plastering is1:4)
6414
-
6567.75
... More
Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least
15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge.
Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top.
2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7,
2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate.
3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles.
24931
-
273.75
... More
Making cubical bamboo porcupine cages with bamboo of 60 mm to 75mm dia. having length of 1.8 metre each for all horizontal and vertical struts and 2.5 metre length for diagonal struts, 3nos horizontal and 3 nos vertical struts should be placed equi-distant from each face to make the square cage of outer dimension 60 cm x 60 cm and projecting each strut by 60 cm on all directions. Two nos dioganals or cross bamboo posts should be placed on each face having their centre tied with the centre of cage properly including fitting, fixing corners, vertical, horizontal and diagonal struts with iron nails not less than 20 cm long and tying corners with 16 SWG galvanized iron wires, filling the cages with 1st class kiln burn Brick @ 40 nos bricks per cage. Cages builts with 10 SWG hexagonal or square pattern 10 cm mesh, with proper lapping, tying and sewing with 10 SWG GI wire including cost of all materials, carriage to site and laying the same in the bed or slope of the river etc. complete as per direction of the Engineer - in - Charge (N.B::- If G I wirenetting is not considered then Rs. 215.00 per cage may be deducted from the following costs, towards cost of wire netting including OH and conctarcor's profit.) For cages of size 60cm x 60cm x 60cm with 1st class kiln burn Bricks.
A) Single cage.
1263
-
3369.84
... More
Extra rate for items 11 above for dumping by boat in flowing water including cost of hiring of boat, boatman, loading into boat and dumping in specified location including all other equipments etc. complete as per direction of the Engineer-in-charge.
1010
-
92.76
... More
Supplying at site the following materials including carriage, Overhead Charges and Contractor's Profit.
A) 8,10,12 SWG G I Wire.
9.9
-
6917.29
... More
Brick work with 1st class bricks in cement mortar (1:4).
A) In foundation and plinth.
12.6
-
6350.15
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
A) Pakur Variety.
31.8
-
6939.22
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface].
A) With 1:4 cement mortar,
A) 20 mm thick plaster.
43
-
213.86
... More
Testing of Geo-textile materials including UV Test from well eqipped laboratories like Jadavpur University, BITRA, CIPET etc.) (This item is applicable only for third party testing conducted by the Engineer-in-charge to assure the quality of the Geo-textile material).