Irrigation And Waterways Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Eprocure
Opening Date31 Aug 2021
Closing Date15 Sep 2021
Tender Amount₹ 59,86,781 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,19,736Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/ee-ii/ldcd /e-nit-16/2021-22 Sl. 3
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IWD_341585_3Bid Award Id
ViewTender No
WBIW /EE-II/LDCD/e-NIT-16/2021-22Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Labour charges for collecting loose scattered laterite and stone boulders from slope, bed or apron and stacking the same above ground level within a lead of 100 metre and all lifts as per direction of the Engineer - in-charge.
293.63
-
231.9
... More
Relaying displaced stone or laterite boulder pitching including dressing, with cost of collection of boulder within a lead of 30 metre.
293.63
-
225.11
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and
backfilling with approved material complete as per direction of the Engineer-in-Charge .
I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.
a) upto 3 m depth
(iv) With pumping water and without shoring
338.1
-
128.96
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation
34
-
87.71
... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge withina lead of,
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. E) Beyond 4.00 km and upto 5.00 km This rate is includes compensation for earth for land owned / arranged by the contractor @ add Rs.25.00 per cum extra over rate of E/W for land. owned/arranged by the department . Royalty charges on earth Rs 29.00 per cum & Cess charges @ Rs5.30 per cum(i.e. Rs 15.00 per 100 cft). asper Govt. Notification, which will be paid on production of neecessary documents in support of payment made towards the royalties & cess.
169.77
-
352.15
... More
Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm.includingsewingthe jointswith 12SWG GI wireand supplyof all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces ) b) 1.20 metre x 0.90 metre nominal section
290
-
787.32
... More
d) 0.90metre x 0.60 metre nominal section
290
-
511.3
... More
h) 0.75 metre x 0.45 metre nominal section
120
-
390.26
... More
Labour charges for bouIder pitching on top and slope by placing required boulders (each weighing 20 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope upto 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in-charge. a) Over Jhama Khoa / metal filter/ Geo-textile filter.
183.6
-
566.73
... More
Supplying,fitting,fixing end pieces for rectangular/square/circular sausages at the ends,with10SWG/8SWG GI wire net of different mesh size stying &sewing the same maintaning a lap langth of 150 mm all around with 12SWG GI wire complete,including the cost of supply of wire netting,fitting etc , complete as per direction of the Engineer-in-charge.
b) Mesh size 125 mm x 125 mm with 10 SWG wire
31.32
-
122.17
... More
Supply of stone / laterite boulders at site including cost of material, loading, unloading and carriage and including all incidental charges like Royalty,complete. (Royalty certificate in original from concerned authority are to be submitted along with the bill)
. c) Laterite Boulder (Each weighing 20 kg & upto 40 kg) Rate of Royalty of laterite boulder : Rs. 36 per Cum
636.75
-
1990.36
... More
Labour charges for stacking unloaded boulder / shingles to make them convenient for measurement as per direction of the Engineer-in-charge.a) Boulder of size above 20 kg
636.75
-
80.32
... More
Supply of different materials as per approved specification Bricks / Jhama / Bats sorted & stacked at site
(f) Brick Bats
174
-
1301.44
... More
Labour charge for dumping / laying of Laterite / Stone Boulders 25 kg & above / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges.
(d) Brick Bats
174
-
128.96
... More
Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void).
b)1st class brick ballast
318.15
-
2113.08
... More
Caulking joints of laterite / stone boulder or Brick pitching with cement mortar 1:4 and flush pointing as per direction of the Engineer-in-charge.
(a) Stone / laterite boulder pitching
1396
-
141.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements