Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Inland Waterways Authority Of India - IWAI Tender
Eprocure
Opening Date21 Sep 2023
Closing Date3 Oct 2023
Tender Amount₹ 17,79,600
Costs
EMD
₹ 36,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_IWAI_772463_1Bid Award Id
ViewTender No
IWAI/KOL/150/MN/44/1/2022Tender Authority
Inland Waterways Authority Of India ViewPurchaser Address
-Website
http://https://iwai.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for Dry dock repair of IWAI vessel SL Dihang for the year 2023-24
Tender Documents for Dry dock repair of IWAI vessel SL Dihang for the year 2023-24
BOQ Items
... More
During the execution of work under Serial No #
3 mentioned above - the renewal of bottom
plates at engine room, crew cabin, rudder
compartment, ship side plate is necessary and
further labour charges for both main engine
dismounting, generator set engine
dismounting, removal of pipelines, stern tube's doubler plate and remounting
of all items viz, wall panel, electrical
lines and other fitments inside and outside,
same as metioned (at the time of removal of
pipelines, panels and other fittings may get
damaged and hence the same needs to be
replaced for OE position, as per direction of
EIC / IWT Surveyor.
1
160000
160000
... More
Under water hull plate & side plate to be scraped & chipped & wire brushed from keel to LWL to remove fouling and old paints. Painting of hull plate & side plate to be done by two coats of exisiting colour marine grade paint after application of one coat of zinc chromate primer as per painting scheme from keel to water level as per direction of Surveyor / EIC.
350
84000
240
... More
Supply and fitting of self sacrificing Zinc (99%)
anode at hull (Appx. Size-20cm x 9 cm x 5 cm)
as per dirction of IWT Surveyor/ EIC.
12
18000
1500
... More
All Sea chest, Mud Box, Stainer, sea water valves to be checked, repaired, cleaned, painted and tested as required as per direction of Surveyor/ EIC.
-
-
-
... More
Labour charges
1
3000
3000
... More
Cost of spares (on Actual + 10 % basis )
-
-
-
... More
All Main sea suction valve and sea line valves
along with its entire pipe lines to be checked,
tested and serviced , repaired/ renewed
including other fitment valves such as Fresh water valves, HSD valves, LO valves, fire line valves in entire ship as required as
per direction of EIC / IWT Surveyor.
-
-
-
... More
Labour charges
1
52000
52000
... More
Cost of spare-parts / materials and machining
charges on actual plus 10% basis.
-
-
-
... More
Both side propeller,propeller shaft and it bushes is to be opened for finding out the clearness & checking of turness, buildup of bushes, etc and rectified in OE position as per drawing after fairing with same composition of Material / renewed the bushes if required and same to be fitted as required as per direction of EIC / IWT Surveyor.
-
-
-
... More
Labour charges
2
100000
50000
... More
Cost of spares and machining charges (on Actual + 10 % basis )
-
-
-
... More
Build up of propeller blade if required, dressing
to profile, bedding balancing of propeller, key
to be bedded as required as per direction of
EIC/IWT Surveyor.
-
-
-
... More
Labour charges
2
30000
15000
... More
Cost of spares and machining charges (on Actual + 10 % basis )
-
-
-
... More
Both rudder assembly to be dismantalled,
rudder stock, shaft, bushes etc to be checked
and if required same to be build up as per OE
size (as per drawing) and fitted back in position
as per direction of EIC/IWT Surveyor.
-
-
-
... More
Labour charges
2
44000
22000
... More
Cost of spares and machining charges (on Actual + 10 % basis )
-
-
-
... More
Officer/crew area comod/systern/tap/shower
etc was reported deffect same to be
renewed/repaired as required as per direction
of EIC.
-
-
-
... More
Labour charges
1
6000
6000
... More
Cost of spares (on Actual + 10 % basis )
-
-
-
... More
All bilges to be cleaned as per direction of
EIC/IWT Surveyor.
1
8500
8500
... More
All pumps of the vessel such as Sea water, Fresh Water pumps, GS Pumps, Seaweage pumps etc. along with its motors are to be seviced with renewal of required spares as required as per direction of Surveyor / EIC.
-
-
-
... More
Labour charges
1
8000
8000
... More
Cost of spares and machining charges (on Actual + 10 % basis )
-
-
-
... More
All quick closing valaves are to be checked for proper functioning, to be serviced with renewal of necessary spares(including) as required and smooth operation/functioning is to established as per direction of EIC/Surveyor.
1
10000
10000
... More
HSD tank (Reserve & Service) ,seawage tank to be cleaned as required as per direction of EIC/IWT Surveyor.
1
10000
10000
... More
Fuel transfer pump to be be seviced as required as per direction of EIC/IWT Surveyor.
-
-
-
... More
Labour charges
1
2000
2000
... More
Cost of spares and machining charges (on Actual + 10 % basis )
-
-
-
... More
Blower to be seviced as required as per direction of
EIC/IWT Surveyor.
-
-
-
... More
Labour charges
4
6000
1500
... More
Cost of spares (on Actual + 10 % basis )
-
-
-
... More
Tyre fender alogwith its chains of appropriate
length & dia. ,buldog clamp to be supplied as
per direction of EIC.
8
12000
1500
... More
Fire hydrant valves( 3nos. in deck & 1 nos. in engine room) to be serviced as required as per
direction of EIC/IWT Surveyor.The damaged fire hoses are also to be replaced.
-
-
-
... More
Labour charges
4
10000
2500
... More
Cost of spares and machining charges (on Actual + 10 % basis )
-
-
-
... More
All Electrical / Electronic line & AC/DC fan
navigation light , other fitment including engine
related to be checked line, panne! board,
sensor,battery charger,pannel board, and
rectified the defects including DC light
connection to be provided in kitchen & officer
cabine toilet as per direction of EIC/IWT
Surveyor.
-
-
-
... More
Labour charges
1
35000
35000
... More
Cost of spares (on Actual + 10 % basis )
-
-
-
... More
Some of the FRP corrugated sheet of the shed in the fwd side/aft of deck is damaged. Same is to be renewed with good quality/branded FRP corrugated sheet , fixing with screws, sealing the joints and screw point with suitable sealant to ensure watertightedness of the roof as required as per direction of EIC/Surveyor.
30
26100
870
... More
The glass of electrical panel in the control room is to be changed.The glass of fire hose boxes are to be also checked and damaged one are to be changed as per direction of EIC/Surveyor.
-
-
-
... More
Labour charges
1
1000
1000
... More
Cost of spares (on Actual + 10 % basis )
-
-
-
... More
It has been reported that wire rope of the devit for FRP boat handling is damaged.The same is to replaced with existing diameter wire rope of reputed make as per direction of EIC/Surveyor.The crane is to be serviced with renewal of required spares as required for smooth operation of the devit/crane.
-
-
-
... More
Labour charges
1
20000
20000
... More
Cost of spares (on Actual + 10 % basis )
-
-
-
Evaluation Notes How It Works ?