Indian Oil Corporation Limited Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Indian Oil Corporation Limited - IOCL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date4 Feb 2025
Closing Date11 Feb 2025
Tender Amount₹ 1,00,75,088.19 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Drain Work At Durgapur Terminal

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for every additional lift of 1.5m or part thereof in excavation or banking excavated or stacked materials in all kinds of soil

20

80

1613.8

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees & saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish outside the site and to an unobjectionable place.

5

11

56.05

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material outside premises at an unobjectionable place as per direction of Engineer-in-charge.

-

-

-

... More
i) 1:3:6 or richer mix (i/c equivalent design mix)

100

1550

155086

... More
Demolishing brick work manually/mechanical means including stacking of serviceable material & disposal of unserviceable material outside premises at an unobjectionable place as / direction of Engg-in-charge

150

1312

196806

... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars & disposal of unserviceable material outside site to an unobjectionable place as/ direction of Engineer-in-charge

30

2262

67875

... More
Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge.

250

770

192660

... More
Carriage charge for disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, stacking, unloading to approved municipal dumping ground/unobjectionable place as/direction of Engg- in-Charge beyond IOCL Premises for all leads and including all lifts

-

-

-

... More
ii) Distance 1 km 3 km

400

137

55112

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, within premises and lift upto 1.5m

300

196

58818

... More
Supplying and filling in plinth with sand within specified grading zone of fine aggregates specified in table 3.1, clause 3.1.3 of attached specifications under floors, etc. in layers not exceeding 20cm in depth, each deposited layer to be compacted by ramming including watering, consolidating and dressing complete.

-

-

-

... More
i) Local Fine Sand within grading zone IV

300

1355

406548

... More
Providing and laying dry brick on edge flooring in required pattern with bricks of Class designation 7.5 on a bed of 12 mm mud mortar including filling joints with river sand with common burnt clay non- modular bricks

170

607

103315.8

... More
Providing and laying in position cement concrete of specified grade excluding cost of centering & shuttering. All work up to plinth level:

-

-

-

... More
iii) 1:2:4(1 Cement : 2 Coarse Sand :4 Graded stone aggregate of 20mm)

65

6059

393872.7

... More
v) 1:3:6(1 Cement : 3 Coarse Sand : 6 Graded stone aggregate of 20mm)

15

5586

83804.1

... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level

-

-

-

... More
ii) RCC 1 Cement :1½ Coarse Sand: 3 Graded Stone Aggregate 20mm

5

6889

34446.95

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
i) Foundations,footings,bases of columns, etc. for mass concrete

252.9

254

64302.35

... More
Supply of Steel reinforcement for R.C.C. including straightening, cutting, bending, placing in position and binding all complete at all levels

-

-

-

... More
ii) Thermo Mechanically Treated Bars of Fe- 500D grade or more, conforming to IS1786

200

74

14906

... More
Providing and laying Brick work with common burnt clay F.P.S (non Modular) bricks of class designation 7.5 in foundation & plinth

-

-

-

... More
iii) Brick work in Cement mortar 1:4 (1 cement: 4 coarse sand) in superstructure in all shapes & sizes in superstructure ABOVE PLINTH & UP TO FLOOR V LEVEL

50

6970

348531

... More
Providing and laying cement plaster on surfaces with fine sand including curing etc.

-

-

-

... More
i) 12 mm cement plaster of mix 1:4 (1 cement: 4 fine sand)

372

238

88606.68

... More
Finishing walls with Acrylic Smooth exterior paint of required shade (2 or more coat applied @ 1.67 ltr/10 sqm over & including priming coat of exterior Primer applied @ 2.20kg/10 sqm)

350

147

51453.5

... More
Dismantling Steel work in built up sections in angles, tees, flats channels etc. including all gusset plates, bolts nuts, cutting rivets welding etc. including dismembering and stacking within premises

2000

3

7400

... More
Structural steel work riveted,bolted or welded in built up sections, trusses & framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete:

1000

90

90820

... More
Fabrication & Erection of IOC supplied structural steel work riveted, bolted or welded in single/ built up sections,trusses & framed work hoisting, fixing in position and applying a priming coat of approved steel primer all including cutting, complete

500

32

16130

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade with two or more coats over an under coat of suitable shade with ordinary paint of approved brand and manufacture.

300

158

47439

... More
Taking out existing CC interlocking paver blocks from footpath central verge, including removal of rubbish etc., disposal of unserviceable material out of site at unobjectionable place and stacking serviceable material within premises as per direction of Engineer - in-Charge

800

83

67160

... More
Laying Corporation supplied interlocking paver blocks of any design /shape laid in required line,level,curvature,colour & pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as/ direction of Engineer-in-charge.

800

289

231512

... More
Supply & drawing/laying, jointing, connecting, testing and commissioning of earth strip/copper strip/GI wire for earthing and lightning protection under or aboveground complete as per specification for the following :

-

-

-

... More
i) 50 x 10mm G.I. Strip

10

362

3627.4

... More
ii) 32 x 6 mm G.I.strip

10

138

1385.7

... More
iii) 50 x 6 mm G.I. Strip

10

205

2057.6

... More
iv) 25 x 6 mm GI strip

10

116

1161.7

... More
v) 25 x 3 mm GI strip

10

68

689.5

... More
vi) 8 S.W.G. G.I. Wire (bare)

10

34

349.9

... More
vii) 10 S.W.G. G.I. Wire (bare)

10

29

292.7

... More
viii) 12 S.W.G. G.I. Wire (bare)

10

28

285.9

... More
ix) 6 S.W.G. Cu. Wire

10

146

1465.6

... More
NEAT CEMENT PUNNING

250

56

14005

... More
Supply and Laying of 50 mm dia single wall flexible piping system comprising of Non-metallic HDPE (flexible) pipelines including all fittings

150

2973

446026.5

... More
Supply and Laying of 80 mm dia single wall flexible piping system comprising of Non-metallic HDPE (flexible) pipelines including all fittings

1400

4134

5788118

... More
SUPPLY OF MS PIPE: API 5L Gr. B:: 80 mm dia, 4.78 mm thickness

100

1197

119737

... More
LAYING & WELDING OF PRODUCT PIPELINE (UNDER GROUND) IN ZONE A

-

-

-

... More
80 mm dia pipe

100

1398

139847

... More
Supply (Class-150) CS Ball Valve for product and fire hydrant lines

-

-

-

... More
80 mm Dia

12

17560

210731.04

... More
Fixing & Installation of the supplied BALL VALVE

-

-

-

... More
80 mm dia

12

3734

44814.72

... More
Erecting temporary Mobile Fire Screen Wall

250

1447

361977.5

... More
Fire screen: Providing and laying in position approved quality profiled, pre-coated coloured galvanized steel sheets of minimum 0.45mm thickness (TCT) in barricading

250

381

95312.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.