Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Indian Oil Corporation Limited - IOCL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date6 Mar 2025
Closing Date20 Mar 2025
Tender Amount₹ 1,23,81,242.31 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
50 mm NB

75

75

5675.25

... More
100 mm NB

5

143

716.8

... More
150 mm NB

10

235

2355.7

... More
250 mm NB

5

417

2089.05

... More
300 mm NB

5

495

2478.1

... More
350 mm NB

5

544

2720.65

... More
400 mm NB

2

621

1243.72

... More
450 mm NB

2

699

1399.2

... More
600 mm NB

2

932

1865.58

... More
900 mm NB

15

1680

25201.8

... More
1200 mm NB

15

2240

33602.4

... More
"COLD CUTTING OF CARBON / ALLOY STEEL PIPE LINES (INSULATED / UNINSULATED): Cold cutting and removal of above ground or overhead/ underground in tranches/ insulated/ uninsulated pipelines of carbon steel/ all oy steel from various location such as pipe racks, columns, pump house, heaters, heat exchangers etc. including removal of insulatio n materials, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down / lifting the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregati ng for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc. trans porting and stacking the salvageable useful materials to workshop / instrument workshop/ store or as per the direction of the Engine er-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location within ERPL Haldia premises all complete as per t he instructions of Engineer-in-Charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, Machineries, all consumables and l abour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and deblinding, area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paid under separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately."

-

-

-

... More
25 mm NB

30

74

2223

... More
50 mm NB

25

172

4320.75

... More
100 mm NB

10

344

3440.7

... More
150 mm NB

10

565

5653.6

... More
250 mm NB

5

865

4327.1

... More
300 mm NB

5

1026

5132.95

... More
350 mm NB

2

1127

2254.12

... More
400 mm NB

2

1288

2576.14

... More
450 mm NB

2

1449

2898.14

... More
600 mm NB

2

1932

3864.2

... More
900 mm NB

2

3071

6143.34

... More
1200 mm NB

2

4095

8191.12

... More
"CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E- 6013/ER70S-2) - UNITS Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, O-let, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics u pto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The sc ope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and lab our etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flush ing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricat ion as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, TIG welding to be used in root run or as decided by Engineer in charge."

-

-

-

... More
25 mm NB, Schedule upto 40 (TIG)

10

86

868.7

... More
25 mm NB, Schedule above 40 but upto 80 (TIG)

250

128

32055

... More
50 mm NB, Schedule upto 40

10

193

1930

... More
50 mm NB, Schedule more than 40 but upto 80

150

259

38901

... More
100 mm NB, Schedule upto 40

5

491

2456.7

... More
100 mm NB, Schedule more than 40 but upto 80

5

547

2739.6

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The sco pe also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labo ur etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushi ng wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricati on as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, TIG welding to be used in root run or as decided by Engineer in charge."

-

-

-

... More
25 mm NB, Schedule upto 40 (TIG)

2

123

246.98

... More
25 mm NB, Schedule above 40 but upto 80 (TIG)

500

159

79735

... More
40 mm NB, Schedule upto 40 (TIG)

2

230

460.84

... More
40 mm NB, Schedule above 40 but upto 80 (TIG)

20

242

4842.4

... More
50 mm NB, Schedule upto 40

2

240

480.08

... More
50 mm NB, Schedule more than 40 but upto 80

25

252

6305.75

... More
80 mm NB, Schedule upto 40

2

371

743.36

... More
100 mm NB, Schedule upto 40

2

477

955.76

... More
100 mm NB, Schedule more than 40 but upto 80

2

533

1066.56

... More
350 mm NB, Schedule upto 20

2

1565

3130.72

... More
350 mm NB, Schedule above 20 but upto 40

2

1813

3627.54

... More
400 mm NB, Schedule upto 20

2

1788

3577.96

... More
400 mm NB, Schedule above 20 but upto 40

2

2072

4145.76

... More
450 mm NB, Schedule upto 20

2

2012

4025.2

... More
450 mm NB, Schedule above 20 but upto 40

2

2331

4663.98

... More
600 mm NB, Schedule upto 20

2

2683

5366.94

... More
900 mm NB, Schedule upto 20

2

4266

8532.42

... More
1200 mm NB, above 7.92 mm WT but upto 12.7 mm WT

2

7467

14934.42

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sa tisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all c onsumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after complet ion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc . used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, TIG welding to be used in root run or as decided by Engineer in charge. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis."

-

-

-

... More
25 mm NB, Schedule upto 40 (TIG)

500

296

148190

... More
25 mm NB, Schedule above 40 but upto 80 (TIG)

50

382

19136.5

... More
40 mm NB, Schedule upto 40 (TIG)

10

553

5530.1

... More
40 mm NB, Schedule above 40 but upto 80 (TIG)

10

581

5811

... More
50 mm NB, Schedule upto 40

10

576

5761

... More
50 mm NB, Schedule more than 40 but upto 80

150

605

90804

... More
80 mm NB, Schedule upto 40

5

892

4460.2

... More
100 mm NB, Schedule upto 40

5

1146

5734.5

... More
100 mm NB, Schedule more than 40 but upto 80

5

1279

6399.3

... More
350 mm NB, Schedule upto 20

2

3756

7513.72

... More
350 mm NB, Schedule above 20 but upto 40

2

4353

8706.08

... More
400 mm NB, Schedule upto 20

2

4293

8587.1

... More
400 mm NB, Schedule above 20 but upto 40

2

4974

9949.8

... More
450 mm NB, Schedule upto 20

2

4830

9660.5

... More
450 mm NB, Schedule above 20 but upto 40

2

5596

11193.54

... More
600 mm NB, Schedule upto 20

2

6440

12880.66

... More
900 mm NB, Schedule upto 20

2

10238

20477.8

... More
1200 mm NB, above 7.92 mm WT but upto 12.7 mm WT

2

17921

35842.62

... More
"SALVAGING OF CARBON STEEL PIPING: Cutting, Grinding, Bevelling and Welding of pipe ends upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches as per instruction of the Engineer-in-charge complete with supply of tools, tackles consumables labours and contractor's supervision. Note: ID = Inch-dia Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately"

100

389

38998

... More
"STAINLESS STEEL PIPING (GR. SS 300) Transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation of smal l bore isometric upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sa tisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, fl ushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabri cation as directed by the Engineer-in-Charge. Piping up to 40mm NB shall be fully TIG welded. "

-

-

-

... More
25 mm NB, Schedule upto 40 (TIG)

10

238

2389.6

... More
25 mm NB, Schedule more than 40 but upto 80 (TIG)

10

238

2389.6

... More
"STAINLESS STEEL PIPING (GR. SS 300) JOINTS Transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation of smal l bore isometric upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sa tisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, fl ushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabri cation as directed by the Engineer-in-Charge. Piping up to 40mm NB shall be fully TIG welded."

-

-

-

... More
25 mm NB, Schedule upto 40 (TIG)

100

573

57349

... More
25 mm NB, Schedule more than 40 but upto 80 (TIG)

5

573

2867.45

... More
"INSITU OVERHAULING / REVISIONING OF GATE, GLOBE, CHECK VALVES OF (UPTO #300 CLASS) Revisioning and overhauling job of valves up to #300 rating. Dismantling of valve bonnet from the body by removing studs, bolts, dis mantling all the parts, cleaning of all parts of the valves, repair of the components, replacement of damaged / worn out spare parts wherever necessary, depositing the welded material, machining, blue matching for the in-situ / manual lapping, greasing and assembl y, pressure testing per applicable standard. For welded valve, blue match will be the criteria. Repair will include machining (if re quired) grinding and or lapping before blue match polishing etc. wherever required. All the consumables except grease, rustoline, nu ts, bolts will be in the scope of contractor. Contractor will deploy technically qualified, experienced, skilled manpower in suffici ent quantity, to carry out the necessary jobs in well organised way so that the job can be completed within scheduled time. Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate."

-

-

-

... More
50 mm to 100 mm

2

1542

3084.48

... More
150 mm to 200 mm

2

3598

7197.12

... More
250 mm to 300 mm

2

5654

11309.76

... More
350 mm to 450 mm

2

8225

16450.56

... More
500 mm to 600 mm

5

11309

56548.8

... More
650 mm to 750 mm

2

14394

28788.48

... More
800 mm to 950 mm

2

17992

35985.62

... More
"INSITU OVERHAULING / REVISIONING OF GATE, GLOBE, CHECK VALVES (ABOVE #300 CLASS AND UPTO #900 CLASS) Revisioning and overhauling job of valves above #300 and up to #900 rating. Dismantling of valve bonnet from the body by removing st uds, bolts, dismantling all the parts, cleaning of all parts of the valves, repair of the components, replacement of damaged / worn out spare parts wherever necessary, depositing the welded material, machining, blue matching for the in-situ / manual lapping, greas ing and assembly, pressure testing per applicable standard. For welded valve, blue match will be the criteria. Repair will include m achining (if required) grinding and or lapping before blue match polishing etc. wherever required. All the consumables will be in th e scope of contractor. Contractor will deploy technically qualified, experienced, skilled manpower in sufficient quantity, to carry out the necessary jobs in well organised way so that the job can be completed within scheduled time. Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate."

-

-

-

... More
50 mm to 100 mm

2

1696

3392.92

... More
150 mm to 200 mm

2

3958

7916.84

... More
250 mm to 300 mm

2

6220

12440.74

... More
350 mm to 450 mm

2

9047

18095.62

... More
500 mm to 600 mm

5

12440

62203.7

... More
650 mm to 750 mm

2

15833

31667.34

... More
800 mm to 950 mm

2

19792

39584.18

... More
"HYDROTESTING OF GATE/GLOBE/ CHECK VALVES Job involves collection of valves from stores, go-down etc. transportation to testing bay or contractors' own premises, test the val ves for seat, body and backseat at recommended pressure including cleaning and greasing, transport back as per instruction and satis faction of the Engineer-in-Charge. Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate."

-

-

-

... More
200 mm

2

845

1690.4

... More
300 mm

2

1267

2535.64

... More
350 mm

2

1479

2958.2

... More
400 mm

2

1690

3380.82

... More
450 mm

2

1901

3803.44

... More
600 mm

2

2304

4609

... More
"FABRICATION OF STRAINER The job includes fabrication of strainer by cutting,bending,forming of strainer frame and fixing of SS wire mesh by tying,stitching and welding etc.and grinding/smoothening the same,complete in all respect as per specification, drawing and instruction of Engineer-in-Charge."

-

-

-

... More
Dia - 400 mm

2

1717

3434.84

... More
Dia - 600 mm

2

2576

5152.26

... More
Dia - 900 mm

2

4095

8191.12

... More
"HYDROTESING OF PIPING WORKS Hydrostatic testing of pipelines at the specified pressure including blinding/de blinding, fabrication and fixing of testing connections, pressure gauge installation. Hose pipe connection and making all other arrangements as required and dewatering, flushing and boxing up after fixing proper gaskets with supply of all labour, tools and tackles, instruments and instruction of the Engineer-in-Charge. The job has to be carried out at all elevations. In case of Hydrotest Failure, Re-testing shall be carried out at no extra cost. "

-

-

-

30

38

1158

... More
200 mm

30

188

5651.1

... More
300 mm

30

293

8793.9

... More
400 mm

30

367

11033.7

... More
600 mm

20

551

11033.6

... More
750 mm

10

730

7305.6

... More
900 mm

20

876

17533.6

... More
"FABRICATION AND ERECTION OF PIPE SUPPORT / DAVITS/ VALVE SUPPORT/ BASE FRAME OF PROCESS AND AUXILIARY EQUIPMENT SUPPORT ETC. The job includes getting the materials issued, transportation to work site and handling at site, fabrication at the required size an d shape using steel pipes, MS structural / plates etc. by cutting, bevelling and welding including fixing of materials at all elevat ion by welding, bolting or otherwise to existing pipes, devit, members or equipment. This also includes fabrication and fixing of pi pe clamps, required fasteners etc. inclusive of labour, consumables, heavy equipment, tools and tackles and materials required for U -clamps, J-bolts etc. and complete in all respect as per drawings, specifications and instructions of the Engineer-in-Charge. (Exclu ding cost of structural steel)."

10

30418

304182.8

... More
DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / DAVITS/ VALVE SUPPORT, BASE FRAME OF PROCESS AND AUXILIARY EQUIPMENT ETC.

-

-

-

... More
"Removal of existing pipe supports / davits / valve support/ base frame for process and auxiliary equipments etc. along with adjacen t fittings / members by cutting / debolting or by any other means without damaging the remaining unit and lowering down to the groun d, retrieving of all the usable materials and transportation to the storage point as directed by the Engineer-in-Charge and complete in all respect with all labour, tools, tackles, heavy equipment, consumables and supervision etc. as per the direction of the Engin eer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately."

6

13014

78084.54

... More
"DYE PENETRATION TEST FOR PIPING WORKS: Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc. along with all equipment’ s, labour, for carrying out the work as per specification and direction of engineer -in-charge at all elevations. Test has to be car ried out in all metallurgy the test has to carry out on all schedules of pipes."

-

-

-

... More
"For pipes (per inch dia) Note: ID = Inch-dia"

500

55

27675

... More
" For Vessels / Tanks (Per Inch)/other surfaces Per Inch length Note: "" = Per Inch"

10

17

174.9

... More
"RADIOGRAPHY OF PIPING WORKS: Performance of radiographic inspection on all type and sizing of piping/ pipe fittings in position at all heights inclusive of provi ding sources, film, chemicals, and all necessary equipment, consumables etc. complete in all respect as per specification and instru ction of the Engineer-in-Charge."

-

-

-

... More
"For pipes (per inch dia) Note: ID = Inch-dia"

100

329

32968

... More
"For Vessels / Tanks (Per Inch)/other surfaces Per Inch length Note: "" = Per Inch"

10

95

956.3

... More
"FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING UPTO 300# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating upto 300#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets from the sheet includi ng tools and tackles, consumables, supervision etc. and as per direction of the Engineer-in-Charge."

-

-

-

100

48

4802

25

96

2401.25

10

153

1536.7

... More
100 mm

25

192

4802.25

... More
150 mm

10

288

2881.4

... More
300 mm

5

576

2881.4

... More
350 mm

5

672

3361.6

... More
400 mm

5

768

3841.85

... More
450 mm

5

864

4322.1

... More
600 mm

5

1152

5762.75

... More
900 mm

5

1728

8644.15

... More
1050 mm

5

2016

10084.85

... More
"FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING MORE THAN 300# AND UPTO 600# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating more than 300# and upto 600#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets fro m the sheet, cleaning of fasteners and fange faces including tools and tackles, consumables, supervision etc. and as per direction o f the Engineer-in-Charge."

-

-

-

... More
300 mm

50

720

36017.5

... More
350 mm

5

840

4202

... More
400 mm

5

960

4802.3

... More
500 mm

5

1200

6002.9

... More
600 mm

5

1440

7203.45

... More
750 mm

5

1800

9004.3

... More
1050 mm

5

2521

12606.05

... More
"FABRICATION OF PLATE FLANGES Fabrication of plate flanges for the given plate and shifting of material for store to work place and fabricating as per drawing and instruction of Engineer-in-Charge."

-

-

-

... More
Upto size Dia 50 mm

2

58

117.04

... More
Above Dia 50 mm and up to Dia 100 mm

2

117

234.08

... More
Above Dia 100 mm and up to Dia 200 mm

50

253

12676

... More
Above Dia 200 mm and up to Dia 300 mm

50

380

19014

... More
Above Dia 300 mm and up to Dia 400 mm

2

507

1014.08

... More
Above Dia 400 mm and up to Dia 500 mm

2

1116

2233.4

... More
Above Dia 500 mm and up to Dia 600 mm

5

1340

6700.2

... More
"SUPPORT PAD WELDING OF PIPES The job involves transportation of all items including all types of structures, pipes etc. from owner's storage point to work site a nd / or prefabrication yard and welding including cutting / grinding / edge preparing and required testing to prove soundness of wel ding with supply of all consumables, manpower, tools as per technical specification and direction and satisfaction of the Engineer-i n-Charge."

-

-

-

... More
For Pipe Dia up to 25mm

2

259

519.04

... More
For pipe Dia 40 mm

2

273

547.46

... More
For pipe Dia 50 mm

2

285

570.36

... More
For pipe Dia 80 mm

2

312

624.92

... More
For pipe Dia 100 mm

2

336

673.4

... More
For pipe Dia 150 mm

2

388

776.42

... More
For pipe Dia 300 mm

2

536

1073.3

... More
For pipe Dia 350 mm

20

566

11337.8

... More
For pipe Dia 400 mm

2

615

1230.7

... More
For pipe Dia 450 mm

2

663

1327.64

... More
"INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES/ RADIATOR ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, engine radiator, gaskets, nut bolts etc. ei ther from owner's storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepe rs, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ r ing properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing s trips, complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles , hydra/crane, lifting belt, sling, D-schakle etc. consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable."

-

-

-

... More
For Valves (other than RTJ e.g. MOV/HOV/NRV)

35000

30

1068550

... More
REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES /RADIATOR ETC.

-

-

-

... More
Dismantling and removal of all types of flanged including RTJ valves, level troll, fire hydrant, monitor, engine radiator by debolti ng/ cold/ hot cutting of fasteners wherever required from pipelines at ground level i.e. up to a height of 5 meters on sleepers, pip e racks etc. or up to 5 meters depth in trenches including removal of gaskets, nut bolts etc. and transportation either to owner's s torage point / workshop and / or scrapyard including loosening of studs, disconnecting earthing protection all complete as per direc tion of the Engineer-in-Charge including all labour, tools, tackles, hydra/crane, lifting belt, sling, D-schakle etc. consumables an d supervision etc.

35000

22

801500

... More
"IN-SITU FLANGE MACHINING OF FLANGES (ALL TYPES): Charges to carry out in situ machining of Gasket Face Flanges (all types of flanges) of Pipe/ Pipe Fittings/ Manhole/ Vessel Manhole / or any other Equivalent Equipment with skilled manpower & suitable equipment/ machinery. Job includes supplying of all types of to ols and tackles, jigs and fixtures, lifting arrangements, electrodes, welding equipment, PMI machine, machineries, all consumables, labour etc. and supervision to complete the work in all respects as per drawings and direction of the Engineer-in-Charge, including area preparation, taking clearance for hot jobs, area cleaning after completion of work, flushing wherever required. The scope inclu des all necessary jobs (including weld buid up) required to restore the flange face finish as per ASME B16.5/ B16.47 as per drawing specifications. The machined surface flatness and/ AARH, as applicable, is to be maintained as per prevailing codes and standards. Contractor to identify the flange metallurgy for electrode selection required for weld build up. Contractor has to execute weld buil d up jobs under the inspection of executing Department of PHBPL Haldia. After completion of work, the flange has to pass through pre ssure testing. Unit of measurement ""inch-dia"" denotes inch-dia of the circular / oval flanges. In case of oval flanges, the measurement highest f lange dia of a particular flange will be considered. Note: • Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be pa id separately."

-

-

-

... More
"IN-SITU FLANGE MACHINING OF FLANGES Note: ID = Inch-dia"

5

1163

5816.5

... More
MOBILISATION AND DEMOBILIZATION CHARGES

1

18548

18548.07

... More
"WELDING OF CS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding o f CS plates including cutting / bending/ grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools & tackles, supervision as per technical specifications, drawings and complete the job in all re spect as per direction of the Engineer-in-Charge."

-

-

-

... More
Upto 3mm thick

25

1365

34148.25

... More
Above 3 mm & upto 5 mm thick

70

1854

129835.3

... More
Above 5 MM & upto 6 mm thick

70

2414

169003.8

... More
Above 6 mm & upto 7 mm thick

25

2785

69648.75

... More
Above 7 mm & upto 9 mm thick

25

3078

76966.75

... More
Above 9 mm & upto 11 mm thick

25

3484

87110.25

... More
"CS / AS PLATE CUTTING Transportation of material from owner's storage point to work site, cutting of CS / AS plate by Gas/ grinding or any other means and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, cons umables and supervision etc."

-

-

-

... More
Upto 3mm thick

15

50

750.45

... More
Above 3 & upto 5mm thick

30

58

1751.1

... More
Above 5 & upto 6mm thick

350

63

22288

... More
Above 6 & upto 8mm thick

10

70

700.5

... More
Above 8 & upto 10mm thick

10

77

778.3

... More
Above 10 & upto 12mm thick

2

93

186.8

... More
"COLD CUTTING OF BOLTS Cutting of bolts in position with hacksaw by cold cutting because of seized condition of bolts and nuts that can not be opened by or dinary means, as per instructions of the Engineer-in-Charge. Supply of consumables, labour, tools and tackles, equipment, supervisio n, area cleaning etc. will be in contractor's scope."

-

-

-

... More
Cold Cutting of Bolts per Inch Dia

200

88

17652

... More
"BUFFING OF WELD JOINTS: Job involves buffing and cleaning of total weld area of the vessel /column etc. using power brush. The job has to be completed in al l respect to the entire satisfaction of the Engineer-in-Charge including all labour, tools, tackles, consumables and supervision etc . (each length of buffing will be up to width of 150 mm)."

100

48

4895

... More
"STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE): The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the area s specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding ma terial including supply of all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-Char ge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective r ates against mentioned height slabs."

-

-

-

... More
Up to 6m height

266

101

27030.92

... More
Above 6m up to 10m height

144

145

20904.48

... More
Above 10m up to 20m height

360

203

73162.8

... More
Above 20m up to 30m height

288

338

97551.36

... More
"ONLINE SEALING OF HYDROCARBON & OTHER LEAKS - BOX CLAMPS Fabrication, supply & fitment of box clamp with design & fabrication, required for on line sealing including supply of all raw mater ials, fasteners, tools & tackles, manpower etc. as per IOCL's ""Standard procedure & specification of online sealing job"" & as requ ired for completion of the job to the entire satisfaction of EIC. Note: 1) The clamps rates mentioned is for the clamps fabricated in Carbon Steel metallurgy (IS 2062 Gr A /ASTM A 283 Gr. C). 2) Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be p aid separately."

-

-

-

... More
"BOX CLAMP CHARGES Note: a) In measurement for box clamps, length of box clamp and OD of box clamp shall be exact measurement of clamp provided on the requir ed surface (pipe, exchanger flanges, pipe flanges or any other identifed surface) excluding collars dimensions. b) The unit of measurement of Inches ("") stands for per Inch length of the box clamp x per inch OD of the Box Clamp c) For non-circular box clamps, OD = Perimeter of the clamp/ no. of sides."

50

140

7023.5

... More
"BOX CLAMP FILLING CHARGES Charges for sealing of pin hole, weld crack, union joint utilising a box clamp including supply of all materials, tools & tackles, m anpower, machines, accessories etc. as per IOCL's ""Standard procedure & speification of online sealing job"" & as per direction of EIC. If clamp is required to arrest the leakage, the cost of the Box clamp shall be paid saperately. The unit of measurement inches ("") stands for Per Inch length of the box clamp x per Inch OD of Box Clamp. Note: In case of re-injection required due to leak/ fault in any exeucted job, then the job shall be done by the contractor as per the con ditions mentioned below:- a) Free of cost, if re-leak appears within 90 days. b) At 50% of normal sealing rate, if leak appears after 90 days but within 180 days."

50

105

5268

... More
"Supply and Erection of Structural Steel: Supplying at site, steel structural items such as steel plates, bars, MS gratings, chequered plates, angles, beams channels, commerc ial quality heavy pipes, C.I. Rollers, bolts & nuts, washers, grouting bolts, padding plates etc., fabrication and erection of saddl e supports and other type of supports for pipes manifolds and valves, fabrication and erection of platforms walkways, stairways etc. , sand blast/ power brush cleaning, priming and painting the finished structures including supply of all other inputs such as labour , materials, consumable etc. necessary to perform and complete the work in all respect, in accordance with drawings, specifications and instructions of the Site Engineer / EIC."

2

121947

243895.8

... More
Fasteners for Flanges 42" x 150# (1.0" Dia. X 8" Length)

5

1050

5253.75

... More
Fasteners for Flanges 36" x 150# (1.5" Dia. X 11.75" Length)

5

900

4502.45

... More
Fasteners for Flanges 30" x 150# (1.25" Dia. X 10.00" Length)

5

750

3751.15

... More
Fasteners for Flanges 28" x 150# (1.25" Dia. X 9.75" Length)

5

700

3500.75

... More
Fasteners for Flanges 24" x 150# (1.125" Dia. X 7.75" Length)

5

372

1862.55

... More
Fasteners for Flanges 20" x 150# (1.125" Dia. X 7.00" Length)

10

318

3182.5

... More
Fasteners for Flanges 18" x 150# (1.125" Dia. X 6.50" Length)

10

244

2441.6

... More
Fasteners for Flanges 16"" x 150# (1.000" Dia. X 6.00" Length)

10

223

2232.9

... More
Fasteners for Flanges 14" x 150# (1.000" Dia. X 6.00" Length)

10

260

2608.6

... More
Fasteners for Flanges 12" x 150# (0.875" Dia. X 5.50" Length)

10

156

1565.1

... More
Fasteners for Flanges 10" x 150# (0.875" Dia. X 5.25" Length)

10

142

1429.5

... More
Fasteners for Flanges 8" x 150# (0.750" Dia. X 4.75" Length)

10

112

1126.9

... More
Fasteners for Flanges 6" x 150# (0.750" Dia. X 4.50" Length)

20

89

1794.6

... More
Fasteners for Flanges 4" x 150# (0.625" Dia. X 4.00" Length)

20

67

1356.4

... More
Fasteners for Flanges 3" x 150# (0.625" Dia. X 4.00" Length)

20

56

1126.8

... More
Fasteners for Flanges 2" x 150# (0.625" Dia. X 3.75" Length)

20

59

1189.4

... More
Fasteners for Flanges 1 1/2" x 150# (0.500" Dia. X 3.25" Length)

20

67

1356.4

... More
Fasteners for Flanges 1" x 150# (0.500" Dia. X 3.00" Length)

20

45

918.2

... More
Fasteners for Flanges 24" x 600# (1.875" Dia. X 14.25" Length)

5

1313

6568.5

... More
Fasteners for Flanges 20" x 600# (1.625" Dia. X 12.50" Length)

5

1086

5431.15

... More
Fasteners for Flanges 18" x 600# (1.605" Dia. X 14.75" Length ) - extended stud length for flanges with spectacle blind

5

1100

5504.15

... More
Fasteners for Flanges 18" x 600# (1.605" Dia. X 12.00" Length)

5

945

4726.8

... More
Fasteners for Flanges 16" x 600# (1.500" Dia. X 13.75" Length) - extended stud length for flanges with spectacle blind

5

714

3573.8

... More
Fasteners for Flanges 16" x 600# (1.500" Dia. X 11.00" Length)

5

577

2885.1

... More
Fasteners for Flanges 12" x 600# (1.25" Dia. X 12" Length) - extended stud length for flanges with spectacle blind

5

661

3307.7

... More
Fasteners for Flanges 12" x 600# (1.25" Dia. X 9.75" Length)

5

546

2733.8

... More
"Fasteners for Flanges 10"" x 600# (1.25"" Dia. X 11.5"" Length ) - extended stud length for flanges with spectacle blind"

5

821

4105.95

... More
Fasteners for Flanges 10" x 600# (1.250" Dia. X 9.50" Length)

5

630

3151.2

... More
Fasteners for Flanges 8" x 600# (1.125" Dia. X 10" Length) - extended stud length for flanges with spectacle blind

5

476

2384.25

... More
Fasteners for Flanges 8" x 600# (1.125" Dia. X 8.25" Length)

5

376

1883.4

... More
"Fasteners for Flanges 6"" x 600# (1.0"" Dia. X 9.0"" Length) - extended stud length for flanges with spectacle blind"

5

290

1450.35

... More
Fasteners for Flanges 6" x 600# (1.000" Dia. X 7.50" Length)

5

248

1241.7

... More
Fasteners for Flanges 4" x 600# ( 0.875" Dia. X 7.75" Length) - extended stud length for flanges with spectacle blind

10

302

3026

... More
Fasteners for Flanges 4" x 600# (0.875" Dia. X 6.50" Length)

10

257

2577.3

... More
Fasteners for Flanges 3" x 600# ( 0.75" Dia. X 6.75" Length ) - extended stud length for flanges with spectacle blind

10

139

1398.2

... More
Fasteners for Flanges 3" x 600# (0.750" Dia. X 5.50" Length)

10

122

1220.8

... More
Fasteners for Flanges 2" x 600# (0.625" Dia. X 5.75" Length) - extended stud length for flanges with spectacle blind

10

122

1220.8

... More
Fasteners for Flanges 2" x 600# (0.625" Dia. X 4.75" Length)

10

102

1022.5

... More
Fasteners for Flanges 1" x 600# (0.625" Dia. X 5.0" Length ) - extended stud length for flanges with spectacle blind

10

108

1085.1

... More
Fasteners for Flanges 1" x 600# (0.625" Dia. X 4.00" Length)

10

79

793

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 42" SWMG ANSI 150#

2

2384

4768.56

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 36" SWMG ANSI 150#

2

2043

4086.14

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 30" SWMG ANSI 150#

2

1702

3405.8

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 24" SWMG ANSI 150#

2

1362

2725.48

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 18" SWMG ANSI 150#

2

730

1460.82

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 16" SWMG ANSI 150#

2

688

1377.34

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 14" SWMG ANSI 150#

2

597

1195.78

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 12" SWMG ANSI 150#

2

526

1053.88

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 10" SWMG ANSI 150#

2

416

832.66

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 8" SWMG ANSI 150#

2

342

684.5

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 6" SWMG ANSI 150#

10

245

2452.1

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 4" SWMG ANSI 150#

10

196

1961.6

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3" SWMG ANSI 150#

2

158

317.2

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 2" SWMG ANSI 150#

2

103

206.6

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1" SWMG ANSI 150#

2

63

127.3

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3/4" SWMG ANSI 150#

2

85

171.42

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 24" SWMG ANSI 600#

2

2106

4213.44

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 16" SWMG ANSI 600#

2

1100

2201.66

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 12" SWMG ANSI 600#

2

1101

2203.76

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 10" SWMG ANSI 600#

2

971

1942.9

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 8" SWMG ANSI 600#

2

841

1682.04

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 6" SWMG ANSI 600#

2

630

1260.48

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 4" SWMG ANSI 600#

2

420

841.02

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3" SWMG ANSI 600#

2

316

632.32

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 2" SWMG ANSI 600#

2

210

421.54

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1" SWMG ANSI 600#

2

112

225.38

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4", WNRF FLANGE, ANSI - 150# (B 16.5)

2

1095

2191.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3", WNRF FLANGE, ANSI - 150# (B 16.5)

2

746

1492.12

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", WNRF FLANGE, ANSI - 150# (B 16.5)

2

517

1035.1

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 11/2", WNRF FLANGE, ANSI - 150# (B 16.5)

2

413

826.4

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", WNRF FLANGE, ANSI - 150# (B 16.5)

2

304

609.36

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3/4", WNRF FLANGE, ANSI - 150# (B 16.5)

2

256

513.36

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", WNRF FLANGE, ANSI - 600# (B 16.5)

2

839

1679.94

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", WNRF FLANGE, ANSI - 600# (B 16.5)

2

649

1298.04

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3/4", WNRF FLANGE, ANSI - 600# (B 16.5)

2

560

1120.66

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 30", BLRF FLANGE, ANSI - 600# (B 16.5)

2

197734

395469.32

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 24", BLRF FLANGE, ANSI - 600# (B 16.5)

2

119274

238549.18

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 18", BLRF FLANGE, ANSI - 600# (B 16.5)

2

64871

129742.46

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 14", BLRF FLANGE, ANSI - 600# (B 16.5)

2

28639

57279.1

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", BLRF FLANGE, ANSI - 600# (B 16.5)

2

689

1379.42

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", BLRF FLANGE, ANSI - 600# (B 16.5)

2

300

601.02

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 36", BLRF FLANGE, ANSI - 150# (B 16.5)

2

153102

306204.34

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 24", BLRF FLANGE, ANSI - 150# (B 16.5)

2

30639

61279.68

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 16", BLRF FLANGE, ANSI - 150# (B 16.5)

2

11760

23521.42

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 12", BLRF FLANGE, ANSI - 150# (B 16.5)

2

6927

13854.9

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3", BLRF FLANGE, ANSI - 150# (B 16.5)

2

695

1391.96

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", BLRF FLANGE, ANSI - 150# (B 16.5)

2

386

772.14

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", BLRF FLANGE, ANSI - 150# (B 16.5)

2

207

415.28

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 6.625" ODx 0.280" WT (Sch.STD) ASTM A 106 Gr B Bare Pipe

10

4489

44899.6

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 4.500" ODx 0.237" WT (Sch.STD) ASTM A 106 Gr B bare Pipe

10

3050

30500

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 3.500" ODx 0.216" WT (Sch.STD) ASTM A 106 Gr B

10

2162

21620.2

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 2.375" ODx 0.218" WT (Sch.XS) ASTM A 106 Gr B bare pipe

100

1480

148065

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 1.315" ODx 0.179"WT (Sch.XS) ASTM A 106 Gr B Bare pipe

10

673

6730.2

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" 600# Equal Tee

2

1485

2971.74

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 600# Equal Tee

2

776

1552.64

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 600# Equal Tee

2

414

828.48

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 600# Equal Tee

15

390

5853.75

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" ANSI 600# 90 deg LR Bends

2

2035

4071.52

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 600# 90 deg LR Bends

2

1413

2827.74

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 600# 90 deg LR Bends

2

540

1081

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 600# 90 deg LR Bends

20

328

6573.6

... More
Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document: 1" X 1500# W/W or F/F, A/G, HOV, API 602 GATE VALVE_

2

15722

31445.38

... More
Corrosion Coupon: Supply of TOR Fitting Complete With Plug & Cap and Full bore Threaded Ball Valve: TOR fitting complete with Caps, Plugs, O-Rings, Nipple & 2" 600# full bore threaded ball valve.

1

21557

21557.66

... More
Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document: 1" x 800# W/W or F/F, A/G, HOV, API 602 GATE VALVE

5

8385

41925.75

... More
Supply and delivery of BS 5351/ISO 17292 Ball valve for use in process piping at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document. 1" x 800# Ball valve HOV W/ W or F/F BS 5351

2

13270

26541.16

... More
Supply and delivery of 2"x ANSI 150# HOV F/F API 6D Ball VALVE for use in process piping at respective stations as per Station wise Break up of material supply and as per technical specifications

1

24131

24131.84

... More
Supply and delivery of 12.75" OD x 0.438" WT, API5L PIPE, UPTO X52, BARE

10

8814

88149

... More
Supply and delivery of 16" OD x 0.438" WT, API5L PIPE, UPTO X52, BARE

10

11141

111417.7

... More
Supply and delivery of 24" OD x 0.438" WT, API5L PIPE, UPTO X52, BARE

10

16869

168694.5

... More
Supply and delivery of 30" OD x 0.438" WT, API5L PIPE, UPTO X52, BARE

10

21165

211652.1

... More
Supply and delivery of 36" OD x 0.438" WT, API5L PIPE, UPTO X52, BARE

10

25460

254609.7

... More
Taking out damaged insulation Taking out old worn out damaged insulation materials of any thickness including wool, mattress, pre-fo rmed sections or any other insulating materials including cladding of aluminium or GI sheet from any height and location etc. comple te and transporting and stacking the serviceable materials to owner's storage point and damaged materials within 2.00 km lead inside Refinery .The job also includes cleaning the site, transporting the materials to directed place at any height, complete with all la bour and materials etc. as per specification and direction of Engineer-In-Charge but excluding the cost of scaffolding. (Payment sha ll be made on the previously finished surface area).

200

32

6598

... More
Taking out damaged cladding: Taking out old worn out damaged cladding of any thickness (plain or corrugated; GI or Aluminium sheet) from any height and location and transporting and stacking the serviceable materials to owner's storage point and damaged material s to the directed place within refinery premises within 2.00 km lead. The job also includes cleaning the site, transporting the mate rials to directe place, complete with all labor and materials etc.as per direction of Engineer-in-Charge but excluding the cost of s caffolding. (Payment shall be made on the previously finished surface area).

200

16

3300

... More
New or old cladding over insulation: "Fixing cladding with new/ old aluminium/ GI sheets, plain or corrugated. The job includes cutt ing, bending and grooving to proper shape and size, providing minimum 50mm overlaps on both longitudinal and circumferential joints including end terminating securing the overlaps alternately by POP rivets and self-tapping screws at every 150mm c/c, and securing additionally with metalic bands at a maximum spacing of 300mm c/c at any height and location with all labour, materials etc. com plete as per direction of Engineer-in-Charge but excluding the cost of scaffolding. (Payment of above shall be made on the area of t he finished surface). Note: 1. Screw, required for metal jacket securement shall be SS /Cadmium plated steel self tapping , type A N o.8 Dia*12mm long to BS 4176 complete with Neoprene washers under the head. Rivets required for metal jacket securement shall be the expanding aluminium ""POP"" blind eye type/SS, 9.5mm long* 5mm dia. 2. For additional securement of cladding, Band, SS 12mm (Min.) wide *24SWG thick is to be used for pipings and Band, SS 20mm wide *24SWG thick is to be used for equpiments. 3.For ensuring perfe ct water proofing, all the cladding joints shall be sealed with approved elastomeric metal sealant. 4. For insulations with vapour b arrier, cladding shall not be applied until the vapour barrier has completely dried and solvents have dissipated. Self tapping scr ews/ rivets shall not be used to secure aluminium cladding as they may puncture the vapour barrier."

-

-

-

... More
Sheets issued by the owner free of cost: New / old aluminium / GI plain / corrugated sheets issue by the owner free of cost

200

125

25170

... More
Al sheet - Plain - 22 G sheet by contractor Aluminium sheet - Plain - 22 SWG as per ASTM B209 Alloy 3003 H16 or IS-737 Designation 3 1000, Condition H3 - to be arranged by contractor

200

688

137656

... More
Providing and fixing LRB mattresses Providing and fixing single/ multiple layer of machine stitched LRB mineral wool mattresses con forming to IS:8183/ASTM C 592, Class-II, faced on one side with 20mm galvanised 22 SWG wire mesh, suitable for temperature up to 550 Deg C, in required thickness over the pipings and technological equipments like columns, vessels, ducts, horton spheres, storage tanks etc., including cleaning of the surface with wire brush, fixing the insulation mattresses in position and securing the same p roperly etc. all complete with tools, tackles, materials such as lacing, binding, stitching wire, labour etc. complete in accordance with the specifications laid down in the contract, latest IS standards and as per the directions of Engineer-in-Charge; but excludi ng the cost of scaffolding. "Note: 1. Contractor has to make his own arrangement for procurement and storage of all the materials an d has to produce manufacturer's test certificate in support of characteristics of insulation materials i.e. 'K' value, density etc. 2. The joints of fibrous insulation material shall be tightly butted and laced together with 1mm dia galvanised lacing wire. 3. In sulation thickness more than 75mm shall be in multi layers. 4. Each layer of the piping insulation shall be secured firmly in place with atleast 3 loops of 24SWG thick x 12mm wide SS bands, one loop to be placed not more than 75mm from each end and atleast one lo op shall be equally spaced betweeen two end loops. 5. Shells of equipments shall be secured by 24SWG thick x 20mm wide SS bands at e very 225mm c/c 6.The item includes disposal of the debris to the directed place within 2km lead as per the direction of Engineer-in- Charge. "

-

-

-

... More
LRB mattress 100 kg/cum - 50mm: LRB mattress of density 100 kg/cum - 50mm Thick

200

358

71646

... More
Process Tube, Material: Stainless Steel, Manufacturing process: Seamless, Mat Specification:ASTM A269, Grade: TP316, end Finish: Pla in End, 1/2 IN OD, 0.065 IN Thickness, 3000 MM Length.

2

327

654.6

... More
Fitting, Bushing, 25.4 MM X 12.7 MM NPT(F), Material: Carbon Steel, Manufacturing Process: Forged, Material Specification: A105, End Finish: Threaded, conform to ANSI 16.11 

2

100

201.9

... More
Excess Flow Valve Nominal Working Pressure: 6000psi/421 Kg/Sqcm, End Connection: 1/2" NPTM for 1/2" OD SS tube, MATERIAL SS 316

2

1812

3625.98

... More
Male Connector, 12.7 MM MNPTX 12.7 MM OD Tube, Material: SS316, 211 kg/sqcm (3000 psi) complete with ferrules & nuts as per ANSI B.2 .1.

2

163

326.54

... More
Female Connector, 12.7 MM FNPT X 12.7 MM OD Tube, 211 kg/sqcm (3000 lbs) complete with ferrules and nut as per ANSI B.2.1, Material : SS316

2

185

371.42

... More
Union Tee, 3X12.7 MM OD Tube, 211 kg/sqcm (3000 lbs) as per ANSI 16.11, Material : SS316.

2

398

797.64

... More
Tube End Cap ( Sq Head), 12.7 MM OD Tube, 211 kg/sqcm (3000 lbs) as per ANSI B 16.11, Material : SS316.

2

99

198.98

... More
2 Way Valve Manifold 2 x 12.7 MM FNPT, Material : SS316 with blanking plug for each port.

2

1318

2636.94

... More
Hex Nipple, 12.7 MM MNPT X 12.7 MM MNPT X 80 MM Long, Material : SS316

2

81

162

... More
PLUG (SQ. Head) 12.7 MM (½”) NPTM, 211 Kg/Cm2 (3000 PSI) as per ANSI B 16.11, Material-SS 316

2

63

127.5

... More
NEEDLE VALVE 12.7 MM (½" FNPT) X 12.7 MM (½" FNPT), MATERIAL-SS316 [ SAP Code: ]

5

741

3708.5

... More
90 Deg ELBOW 12.7 MM (½”) FNPT X 12.7 MM (½”) FNPT, 211 KG/CM2 (3000 PSI) as per ANSI B 16.11. MATERIAL - SS 316

2

429

859.58

... More
Supply of ANTI CORROSIVE SPRAY,WD-40 (Material code: 6492751004)

25

201

5028.5

... More
WATER WORKS CLEANER (Material code: 6499921024)

20

1436

28739

... More
COTTON WASTE,YARN, 25 KGS (Material code: 9380580604) Note: EA means KG

100

41

4182

... More
COLOUR COTTON WASTE (Material code: 9380581454) Note: EA means KG

1000

55

55000

... More
Supply of Demineralized (DM) Water

200

62

12480

... More
"Calibration of Thermal Relief valves of different sizes and rating: 1. Closing of upstream and downstream valves (as applicable) of TRV, removal of TRV from the pressure piping and providing blind alo ng with gasket (already installed) in the piping on both upstream & downstream sides. 2. Dismantling all the parts of Thermal relief valve completely. 3. Cleaning all its critical parts by diesel, carrying out any lapping, machining of seat or any other part if required. Applying gr ease over metallic part wherever required. 4. Providing new gasket/O-ring if found damaged. 5. Assembly of TRV. 6. Pressure setting of the TRV at the desired pressure by loading in the test bench and calibration. 7. Removing blind from the station piping (from where the said TRV was removed) and fitment of the calibrated TRV. 8. Painting (synthetic enamel) of the TRV and providing metal tag with cable tie mentioning TRV tag no., serial no., calibration dat e, due date of calibration, pressure set point. 9. Putting back TRV back to operation by opening upstream and downstream valves. 10. Certification of TRV from PESO approved agency . 11. Submission of Calibration reports alonwith necessary documents from PESO approved agency Location of maintenance, testing and calibration: Within ERPL Haldia Premises"

160

1782

285163.2

... More
"Testing,Calibration and certification of Pressure Safety Valves of different size and rating 1.Dismantling all the parts of PSV completely. 2.Cleaning all its critical parts by diesel, carrying out any lapping, machining of seat or any other part if required. Applying gre ase over metallic part wherever required. 3.Providing new gasket/O-ring if found damaged 4.Location of maintenance, testing and calibration: Within ERPL Haldia Premises. 5.Painting (synthetic enamel) of the PSV and providing metal tag with cable tie mentioning PSV tag no., serial no., calibration date , due date of calibration, pressure set point. 6.Certification from PESO approved agency 7. Submission of Calibration reports alonwith necessary documents from PESO approved agency Location of maintenance, testing and calibration: Within ERPL Haldia Premises"

20

1517

30350.4

... More
Mech. Maint. ARC- PHBMPL Haldia

-

-

-

... More
"DISMANTLING OF CARBON STEEL/ALLOY STEEL PIPING BY HOT WORK (INSULATED / UNINSULATED): Dismantling and removal of above ground, overhead or under ground (upto height depth of 5m) redundant/ insulated/ uninsulated pipin g of carbon steel / alloy steel by gas cutting or by grinding from various locations such as pipe racks, columns, pump house, heater s, heat exchangers etc. including removal of insulation material, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregating for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbo lting, gas cutting, cold cutting etc.; transporting and stacking the salvageable useful materials to workshop / instrument workshop/ store or as per the direction of the Engineer-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location withi n PHBMPL-ERPL Haldia premises and completing the job as per the instructions of Engineer-in-Charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and l abour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and de-blinding, area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paid under separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately."

-

-

-

... More
25 mm NB

20

39

797.4

... More
50 mm NB

10

75

756.7

... More
100 mm NB

10

143

1433.6

... More
150 mm NB

5

235

1177.85

... More
200 mm NB

5

306

1533.35

... More
250 mm NB

5

417

2089.05

... More
300 mm NB

5

495

2478.1

... More
350 mm NB

5

544

2720.65

... More
400 mm NB

2

621

1243.72

... More
450 mm NB

2

699

1399.2

... More
"COLD CUTTING OF CARBON / ALLOY STEEL PIPE LINES (INSULATED / UNINSULATED): Cold cutting and removal of above ground or overhead/ underground in tranches/ insulated/ uninsulated pipelines of carbon steel/ all oy steel from various location such as pipe racks, columns, pump house, heaters, heat exchangers etc. including removal of insulatio n materials, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down / lifting the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregati ng for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc. trans porting and stacking the salvageable useful materials to workshop / instrument workshop/ store or as per the direction of the Engine er-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location within PHBMPL-ERPL Haldia premises all complete a s per the instructions of Engineer-in-Charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, Machineries, all consumables and l abour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and deblinding, area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paid under separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately."

-

-

-

... More
25 mm NB

10

74

741

... More
50 mm NB

5

172

864.15

... More
100 mm NB

5

344

1720.35

... More
150 mm NB

5

565

2826.8

... More
200 mm NB

5

694

3472.15

... More
250 mm NB

2

865

1730.84

... More
300 mm NB

2

1026

2053.18

... More
350 mm NB

2

1127

2254.12

... More
400 mm NB

2

1288

2576.14

... More
450 mm NB

2

1449

2898.14

... More
"CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E- 6013/ER70S-2) - UNITS Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, O-let, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics u pto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scop e also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labou r etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushin g wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricatio n as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%."

-

-

-

... More
25 mm NB, Schedule upto 40 (TIG)

25

86

2171.75

... More
25 mm NB, Schedule above 40 but upto 80 (TIG)

20

128

2564.4

... More
50 mm NB, Schedule upto 40

10

193

1930

... More
50 mm NB, Schedule more than 40 but upto 80

10

259

2593.4

... More
100 mm NB, Schedule upto 40

5

491

2456.7

... More
100 mm NB, Schedule more than 40 but upto 80

5

547

2739.6

... More
350 mm NB, Schedule more than 20 but upto 40

5

1902

9514.35

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%."

-

-

-

... More
25 mm NB, Schedule upto 40 (TIG)

25

123

3087.25

... More
25 mm NB, Schedule above 40 but upto 80 (TIG)

25

159

3986.75

... More
40 mm NB, Schedule upto 40 (TIG)

20

230

4608.4

... More
40 mm NB, Schedule above 40 but upto 80 (TIG)

20

242

4842.4

... More
50 mm NB, Schedule upto 40

10

240

2400.4

... More
50 mm NB, Schedule more than 40 but upto 80

10

252

2522.3

... More
80 mm NB, Schedule upto 40

5

371

1858.4

... More
100 mm NB, Schedule upto 40

5

477

2389.4

... More
100 mm NB, Schedule more than 40 but upto 80

2

533

1066.56

... More
350 mm NB, Schedule upto 20

2

1565

3130.72

... More
350 mm NB, Schedule above 20 but upto 40

2

1813

3627.54

... More
400 mm NB, Schedule upto 20

2

1788

3577.96

... More
400 mm NB, Schedule above 20 but upto 40

2

2072

4145.76

... More
450 mm NB, Schedule upto 20

2

2012

4025.2

... More
450 mm NB, Schedule above 20 but upto 40

2

2331

4663.98

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis."

-

-

-

... More
25 mm NB, Schedule upto 40 (TIG)

10

296

2963.8

... More
25 mm NB, Schedule above 40 but upto 80 (TIG)

10

382

3827.3

... More
40 mm NB, Schedule upto 40 (TIG)

10

553

5530.1

... More
40 mm NB, Schedule above 40 but upto 80 (TIG)

10

581

5811

... More
50 mm NB, Schedule upto 40

10

576

5761

... More
50 mm NB, Schedule more than 40 but upto 80

10

605

6053.6

... More
80 mm NB, Schedule upto 40

5

892

4460.2

... More
100 mm NB, Schedule upto 40

5

1146

5734.5

... More
100 mm NB, Schedule more than 40 but upto 80

5

1279

6399.3

... More
350 mm NB, Schedule upto 20

2

3756

7513.72

... More
350 mm NB, Schedule above 20 but upto 40

2

4353

8706.08

... More
400 mm NB, Schedule upto 20

2

4293

8587.1

... More
400 mm NB, Schedule above 20 but upto 40

2

4974

9949.8

... More
450 mm NB, Schedule upto 20

2

4830

9660.5

... More
450 mm NB, Schedule above 20 but upto 40

2

5596

11193.54

... More
"SALVAGING OF CARBON STEEL PIPING: Cutting, Grinding, Bevelling and Welding of pipe ends upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches as per instruction of the Engineer-in-charge complete with supply of tools, tackles consumables labours and contractor's supervision. Note: ID = Inch-dia"

2

389

779.96

... More
"STAINLESS STEEL PIPING (GR. SS 300) Transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation of smal l bore isometric upto 0.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sa tisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, fl ushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabri cation as directed by the Engineer-in-Charge. Piping up to 40mm NB shall be fully TIG welded."

-

-

-

... More
15 mm NB, Schedule upto 40 (TIG)

20

95

1911.8

... More
15 mm NB, Schedule more than 40 but upto 80 (TIG)

20

152

3053.4

... More
15 mm NB, Schedule above 80 but upto 120 (TIG)

20

152

3053.4

... More
20 mm NB, Schedule upto 40 (TIG)

20

119

2389.4

... More
20 mm NB, Schedule more than 40 but upto 80 (TIG)

20

190

3816.2

... More
20 mm NB, Schedule above 80 but upto 120 (TIG)

20

227

4540.8

... More
25 mm NB, Schedule upto 40 (TIG)

20

238

4779.2

... More
25 mm NB, Schedule more than 40 but upto 80 (TIG)

20

238

4779.2

... More
25 mm NB, Schedule more than 80 but upto 160 (TIG)

20

300

6000.4

... More
"STAINLESS STEEL PIPING (GR. SS 300) JOINTS Transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation of smal l bore isometric upto 0.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sa tisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, fl ushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabri cation as directed by the Engineer-in-Charge. Piping up to 40mm NB shall be fully TIG welded."

-

-

-

... More
15 mm NB, Schedule upto 40 (TIG)

10

229

2294.2

... More
15 mm NB, Schedule more than 40 but upto 80 (TIG)

10

366

3664.2

... More
15 mm NB, Schedule above 80 but upto 120 (TIG

10

366

3664.2

... More
20 mm NB, Schedule upto 40 (TIG)

10

286

2867.3

... More
20 mm NB, Schedule more than 40 but upto 80 (TIG)

10

457

4579.4

... More
20 mm NB, Schedule above 80 but upto 120 (TIG

10

544

5448.9

... More
25 mm NB, Schedule upto 40 (TIG)

10

573

5734.9

... More
25 mm NB, Schedule more than 40 but upto 80 (TIG)

10

573

5734.9

... More
25 mm NB, Schedule more than 80 but upto 160 (TIG)

10

720

7200.6

... More
"FABRICATION OF STRAINER The job includes fabrication of strainer by cutting,bending,forming of strainer frame and fixing of SS wire mesh by tying,stitching and welding etc.and grinding/smoothening the same,complete in all respect as per specification, drawing and instruction of Engineer-in-Charge."

-

-

-

... More
Dia - 200 mm

2

925

1851.8

... More
Dia - 250 mm

2

1153

2307.78

... More
Dia - 450 mm

2

1932

3864.2

... More
"HYDROTESING OF PIPING WORKS Hydrostatic testing of pipelines at the specified pressure including blinding/de blinding, fabrication and fixing of testing connections, pressure gauge installation. Hose pipe connection and making all other arrangements as required and dewatering, flushing and boxing up after fixing proper gaskets with supply of all labour, tools and tackles, instruments and instruction of the Engineer-in-Charge. The job has to be carried out at all elevations. In case of Hydrotest Failure, Re-testing shall be carried out at no extra cost. "

-

-

-

... More
200 mm

20

188

3767.4

... More
250 mm

20

247

4942.2

... More
450 mm

20

413

8275.2

... More
"FABRICATION AND ERECTION OF PIPE SUPPORT / DAVITS/ VALVE SUPPORT/ BASE FRAME OF PROCESS AND AUXILIARY EQUIPMENT SUPPORT ETC. The job includes getting the materials issued, transportation to work site and handling at site, fabrication at the required size an d shape using steel pipes, MS structural / plates etc. by cutting, bevelling and welding including fixing of materials at all elevat ion by welding, bolting or otherwise to existing pipes, devit, members or equipment. This also includes fabrication and fixing of pi pe clamps, required fasteners etc. inclusive of labour, consumables, heavy equipment, tools and tackles and materials required for U -clamps, J-bolts etc. and complete in all respect as per drawings, specifications and instructions of the Engineer-in-Charge. (Exclu ding cost of structural steel)."

3

30418

91254.84

... More
DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / DAVITS/ VALVE SUPPORT, BASE FRAME OF PROCESS AND AUXILIARY EQUIPMENT ETC.

-

-

-

... More
"Removal of existing pipe supports / davits / valve support/ base frame for process and auxiliary equipments etc. along with adjacen t fittings / members by cutting / debolting or by any other means without damaging the remaining unit and lowering down to the groun d, retrieving of all the usable materials and transportation to the storage point as directed by the Engineer-in-Charge and complete in all respect with all labour, tools, tackles, heavy equipment, consumables and supervision etc. as per the direction of the Engin eer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately."

2

13014

26028.18

... More
"DYE PENETRATION TEST FOR PIPING WORKS: Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc. along with all equipment’ s, labour, for carrying out the work as per specification and direction of engineer -in-charge at all elevations. Test has to be car ried out in all metallurgy the test has to carry out on all schedules of pipes."

-

-

-

... More
"For pipes (per inch dia) Note: ID = Inch-dia"

200

55

11070

... More
" For Vessels / Tanks (Per Inch)/other surfaces Per Inch length Note: "" = Per Inch"

50

17

874.5

... More
"RADIOGRAPHY OF PIPING WORKS: Performance of radiographic inspection on all type and sizing of piping/ pipe fittings in position at all heights inclusive of provi ding sources, film, chemicals, and all necessary equipment, consumables etc. complete in all respect as per specification and instru ction of the Engineer-in-Charge."

-

-

-

... More
"For pipes (per inch dia) Note: ID = Inch-dia"

100

329

32968

... More
"For Vessels / Tanks (Per Inch)/other surfaces Per Inch length Note: "" = Per Inch"

25

95

2390.75

... More
"FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING UPTO 300# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating upto 300#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets from the sheet includi ng tools and tackles, consumables, supervision etc. and as per direction of the Engineer-in-Charge."

-

-

-

10

48

480.2

25

96

2401.25

25

153

3841.75

... More
100 mm

25

192

4802.25

... More
150 mm

10

288

2881.4

... More
300 mm

10

576

5762.8

... More
350 mm

10

672

6723.2

... More
400 mm

10

768

7683.7

... More
450 mm

10

864

8644.2

... More
"FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING MORE THAN 300# AND UPTO 600# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating more than 300# and upto 600#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets fro m the sheet, cleaning of fasteners and fange faces including tools and tackles, consumables, supervision etc. and as per direction o f the Engineer-in-Charge."

-

-

-

10

60

600.3

10

96

960.5

10

120

1200.6

10

192

1920.9

... More
100 mm

10

240

2401.2

... More
150 mm

10

360

3601.7

... More
200 mm

10

480

4802.3

... More
250 mm

10

600

6002.9

... More
300 mm

10

720

7203.5

... More
350 mm

20

840

16808

... More
400 mm

5

960

4802.3

... More
450 mm

5

1080

5402.6

... More
"FABRICATION OF PLATE FLANGES Fabrication of plate flanges for the given plate and shifting of material for store to work place and fabricating as per drawing and instruction of Engineer-in-Charge."

-

-

-

... More
Upto size Dia 50 mm

5

58

292.6

... More
Above Dia 50 mm and up to Dia 100 mm

2

117

234.08

... More
Above Dia 100 mm and up to Dia 200 mm

2

253

507.04

... More
Above Dia 200 mm and up to Dia 300 mm

2

380

760.56

... More
Above Dia 300 mm and up to Dia 400 mm

2

507

1014.08

... More
Above Dia 400 mm and up to Dia 500 mm

2

1116

2233.4

... More
"SUPPORT PAD WELDING OF PIPES The job involves transportation of all items including all types of structures, pipes etc. from owner's storage point to work site a nd / or prefabrication yard and welding including cutting / grinding / edge preparing and required testing to prove soundness of wel ding with supply of all consumables, manpower, tools as per technical specification and direction and satisfaction of the Engineer-i n-Charge."

-

-

-

... More
For Pipe Dia up to 25mm

2

259

519.04

... More
For pipe Dia 40 mm

2

273

547.46

... More
For pipe Dia 50 mm

2

285

570.36

... More
For pipe Dia 80 mm

2

312

624.92

... More
For pipe Dia 100 mm

2

336

673.4

... More
For pipe Dia 150 mm

2

388

776.42

... More
For pipe Dia 300 mm

2

536

1073.3

... More
For pipe Dia 350 mm

5

566

2834.45

... More
For pipe Dia 400 mm

5

615

3076.75

... More
For pipe Dia 450 mm

4

663

2655.28

... More
"INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES/ RADIATOR ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, engine radiator, gaskets, nut bolts etc. ei ther from owner's storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepe rs, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ r ing properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing s trips, complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles , hydra/crane, lifting belt, sling, D-schakle etc. consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable."

-

-

-

... More
For Valves (other than RTJ e.g. MOV/HOV/NRV)

8000

30

244240

... More
REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES /RADIATOR ETC.

-

-

-

... More
Dismantling and removal of all types of flanged including RTJ valves, level troll, fire hydrant, monitor, engine radiator by debolti ng/ cold/ hot cutting of fasteners wherever required from pipelines at ground level i.e. up to a height of 5 meters on sleepers, pip e racks etc. or up to 5 meters depth in trenches including removal of gaskets, nut bolts etc. and transportation either to owner's s torage point / workshop and / or scrapyard including loosening of studs, disconnecting earthing protection all complete as per direc tion of the Engineer-in-Charge including all labour, tools, tackles, hydra/crane, lifting belt, sling, D-schakle etc. consumables an d supervision etc.

8000

22

183200

... More
"IN-SITU FLANGE MACHINING OF FLANGES (ALL TYPES): Charges to carry out in situ machining of Gasket Face Flanges (all types of flanges) of Pipe/ Pipe Fittings/ Manhole/ Vessel Manhole / or any other Equivalent Equipment with skilled manpower & suitable equipment/ machinery. Job includes supplying of all types of to ols and tackles, jigs and fixtures, lifting arrangements, electrodes, welding equipment, PMI machine, machineries, all consumables, labour etc. and supervision to complete the work in all respects as per drawings and direction of the Engineer-in-Charge, including area preparation, taking clearance for hot jobs, area cleaning after completion of work, flushing wherever required. The scope inclu des all necessary jobs (including weld buid up) required to restore the flange face finish as per ASME B16.5/ B16.47 as per drawing specifications. The machined surface flatness and/ AARH, as applicable, is to be maintained as per prevailing codes and standards. Contractor to identify the flange metallurgy for electrode selection required for weld build up. Contractor has to execute weld buil d up jobs under the inspection of executing Department of PHBMPL-ERPL Haldia. After completion of work, the flange has to pass throu gh pressure testing. Unit of measurement ""inch-dia"" denotes inch-dia of the circular / oval flanges. In case of oval flanges, the measurement highest f lange dia of a particular flange will be considered. Note: • Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be pa id separately."

-

-

-

... More
"IN-SITU FLANGE MACHINING OF FLANGES Note: ID = Inch-dia"

24

1163

27919.2

... More
MOBILISATION AND DEMOBILIZATION CHARGES

1

18548

18548.07

... More
"WELDING OF CS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding o f CS plates including cutting / bending/ grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools & tackles, supervision as per technical specifications, drawings and complete the job in all re spect as per direction of the Engineer-in-Charge."

-

-

-

... More
Upto 3mm thick

2

1365

2731.86

... More
Above 3 mm & upto 5 mm thick

2

1854

3709.58

... More
Above 5 MM & upto 6 mm thick

2

2414

4828.68

... More
Above 6 mm & upto 7 mm thick

5

2785

13929.75

... More
Above 7 mm & upto 9 mm thick

5

3078

15393.35

... More
Above 9 mm & upto 11 mm thick

2

3484

6968.82

... More
"CS / AS PLATE CUTTING Transportation of material from owner's storage point to work site, cutting of CS / AS plate by Gas/ grinding or any other means and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, cons umables and supervision etc."

-

-

-

... More
Upto 3mm thick

2

50

100.06

... More
Above 3 & upto 5mm thick

2

58

116.74

... More
Above 5 & upto 6mm thick

2

63

127.36

... More
Above 6 & upto 8mm thick

10

70

700.5

... More
Above 8 & upto 10mm thick

10

77

778.3

... More
Above 10 & upto 12mm thick

2

93

186.8

... More
"COLD CUTTING OF BOLTS Cutting of bolts in position with hacksaw by cold cutting because of seized condition of bolts and nuts that can not be opened by or dinary means, as per instructions of the Engineer-in-Charge. Supply of consumables, labour, tools and tackles, equipment, supervisio n, area cleaning etc. will be in contractor's scope."

-

-

-

... More
Cold Cutting of Bolts per Inch Dia

100

88

8826

... More
"BUFFING OF WELD JOINTS: Job involves buffing and cleaning of total weld area of the vessel /column etc. using power brush. The job has to be completed in al l respect to the entire satisfaction of the Engineer-in-Charge including all labour, tools, tackles, consumables and supervision etc . (each length of buffing will be up to width of 150 mm)."

250

48

12237.5

... More
"STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE): The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the area s specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding ma terial including supply of all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-Char ge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective r ates against mentioned height slabs."

-

-

-

... More
Up to 6m height

266

101

27030.92

... More
Above 6m up to 10m height

144

145

20904.48

... More
Above 10m up to 20m height

360

203

73162.8

... More
Above 20m up to 30m height

144

338

48775.68

... More
"Supply and Erection of Structural Steel: Supplying at site, steel structural items such as steel plates, bars, MS gratings, chequered plates, angles, beams channels, commerc ial quality heavy pipes, C.I. Rollers, bolts & nuts, washers, grouting bolts, padding plates etc., fabrication and erection of saddl e supports and other type of supports for pipes manifolds and valves, fabrication and erection of platforms walkways, stairways etc. , sand blast/ power brush cleaning, priming and painting the finished structures including supply of all other inputs such as labour , materials, consumable etc. necessary to perform and complete the work in all respect, in accordance with drawings, specifications and instructions of the Site Engineer / EIC."

3

125372

376118.37

... More
"Fasteners for Flanges 16"" x 300# (1.25"" Dia. 10.25"" Length ) - extended stud length for flanges with spectacle blind"

10

859

8592.7

... More
Fasteners for Flanges 16" x 300# (1.25" Dia. X 8.5" Length)

10

609

6093.2

... More
"Fasteners for Flanges 10"" x 300# (1.0"" Dia. X 8.25"" Length ) - extended stud length for flanges with spectacle blind"

10

321

3218.2

... More
Fasteners for Flanges 10" x 300# (1.0" Dia. X 7" Length )

10

271

2714

... More
Fasteners for Flanges 8" x 300# (0.875" Dia. X 7.5" Length) - extended stud length for flanges with spectacle blind

10

297

2971.5

... More
Fasteners for Flanges 8" x 300# (0.875" Dia. X 6.25" Length)

10

247

2478

... More
Fasteners for Flanges 4" x 300# (0.75" Dia. X 5.75" Length ) - extended stud length for flanges with spectacle blind

10

130

1308.7

... More
Fasteners for Flanges 4" x 300# (0.75" Dia. X 5.00" Length )

10

114

1147.8

... More
Fasteners for Flanges 3" x 300# (0.75" Dia. X 5.5" Length) - extended stud length for flanges with spectacle blind

10

105

1051.2

... More
Fasteners for Flanges 3" x 300# (0.75" Dia. X 4.75" Length)

10

89

890.3

... More
Fasteners for Flanges 2" x 300# (0.625" Dia. X 4.75" Length) - extended stud length for flanges with spectacle blind

10

84

847.4

... More
Fasteners for Flanges 2" x 300# (0.625" Dia. X 4.00" Length)

10

78

783.1

... More
Fasteners for Flanges 1" x 300# (0.625" Dia. X 4" Length) - extended stud length for flanges with spectacle blind

10

67

675.8

... More
Fasteners for Flanges 1" x 300# (0.625" Dia. X 3.5" Length)

10

63

632.9

... More
Fasteners for Flanges 18" x 600# (1.605" Dia. X 14.75" Length ) - extended stud length for flanges with spectacle blind

5

1131

5658.75

... More
Fasteners for Flanges 18" x 600# (1.605" Dia. X 12.00" Length)

5

971

4859.55

... More
Fasteners for Flanges 16" x 600# (1.500" Dia. X 13.75" Length) - extended stud length for flanges with spectacle blind

5

734

3674.15

... More
Fasteners for Flanges 16" x 600# (1.500" Dia. X 11.00" Length)

5

593

2966.15

... More
Fasteners for Flanges 12" x 600# (1.25" Dia. X 12" Length) - extended stud length for flanges with spectacle blind

5

680

3400.6

... More
Fasteners for Flanges 12" x 600# (1.25" Dia. X 9.75" Length)

5

562

2810.6

... More
"Fasteners for Flanges 10"" x 600# (1.25"" Dia. X 11.5"" Length ) - extended stud length for flanges with spectacle blind"

5

844

4221.25

... More
Fasteners for Flanges 10" x 600# (1.250" Dia. X 9.50" Length)

5

647

3239.7

... More
Fasteners for Flanges 8" x 600# (1.125" Dia. X 10" Length) - extended stud length for flanges with spectacle blind

5

490

2451.2

... More
Fasteners for Flanges 8" x 600# (1.125" Dia. X 8.25" Length)

5

387

1936.3

... More
"Fasteners for Flanges 6"" x 600# (1.0"" Dia. X 9.0"" Length) - extended stud length for flanges with spectacle blind"

5

298

1491.1

... More
Fasteners for Flanges 6" x 600# (1.000" Dia. X 7.50" Length)

5

255

1276.55

... More
Fasteners for Flanges 4" x 600# ( 0.875" Dia. X 7.75" Length) - extended stud length for flanges with spectacle blind

10

311

3110.9

... More
Fasteners for Flanges 4" x 600# (0.875" Dia. X 6.50" Length)

10

264

2649.7

... More
Fasteners for Flanges 3" x 600# ( 0.75" Dia. X 6.75" Length ) - extended stud length for flanges with spectacle blind

10

143

1437.4

... More
Fasteners for Flanges 3" x 600# (0.750" Dia. X 5.50" Length)

10

125

1255.1

... More
Fasteners for Flanges 2" x 600# (0.625" Dia. X 5.75" Length) - extended stud length for flanges with spectacle blind

10

125

1255.1

... More
Fasteners for Flanges 2" x 600# (0.625" Dia. X 4.75" Length)

10

105

1051.2

... More
Fasteners for Flanges 1" x 600# (0.625" Dia. X 5.0" Length ) - extended stud length for flanges with spectacle blind

10

111

1115.6

... More
Fasteners for Flanges 1" x 600# (0.625" Dia. X 4.00" Length)

10

81

815.2

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 4" SWMG ANSI 150#

2

201

403.34

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3" SWMG ANSI 150#

2

163

326.1

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 2" SWMG ANSI 150#

2

106

212.4

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1" SWMG ANSI 150#

12

65

785.16

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3/4" SWMG ANSI 150#

24

85

2057.04

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 18" SWMG ANSI 300#

12

1224

14692.32

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 16" SWMG ANSI 300#

12

1154

13851.36

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 14" SWMG ANSI 300#

12

1084

13010.28

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 12" SWMG ANSI 300#

12

1014

12169.2

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 10" SWMG ANSI 300#

12

944

11328.24

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 8" SWMG ANSI 300#

12

656

7878.24

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 6" SWMG ANSI 300#

12

587

7054.32

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 4" SWMG ANSI 300#

12

440

5290.8

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3" SWMG ANSI 300#

12

285

3424.2

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 2" SWMG ANSI 300#

12

150

1802.16

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1" SWMG ANSI 300#

12

81

978.24

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3/4"" SWMG ANSI 300#

12

64

772.2

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1/2"" SWMG ANSI 300#

12

47

566.28

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 18" SWMG ANSI 600#

12

1266

15203.04

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 16" SWMG ANSI 600#

2

1131

2263.5

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 14" SWMG ANSI 600#

24

1132

27174.72

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 12" SWMG ANSI 600#

4

1132

4531.28

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 10" SWMG ANSI 600#

6

998

5992.38

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 8" SWMG ANSI 600#

24

864

20751.12

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 6" SWMG ANSI 600#

12

647

7775.28

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 4" SWMG ANSI 600#

6

432

2593.86

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3" SWMG ANSI 600#

4

325

1300.16

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 2" SWMG ANSI 600#

2

216

433.38

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1" SWMG ANSI 600#

2

115

231.7

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3/4" SWMG ANSI 600#

6

90

543.84

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1/2" SWMG ANSI 600#

6

65

392.58

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4", WNRF FLANGE, ANSI - 150# (B 16.5)

2

1126

2252.78

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3", WNRF FLANGE, ANSI - 150# (B 16.5)

2

767

1534.02

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", WNRF FLANGE, ANSI - 150# (B 16.5)

2

532

1064.16

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 11/2", WNRF FLANGE, ANSI - 150# (B 16.5)

4

424

1699.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", WNRF FLANGE, ANSI - 150# (B 16.5)

2

313

626.48

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3/4", WNRF FLANGE, ANSI - 150# (B 16.5)

6

263

1583.34

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1/2", WNRF FLANGE, ANSI - 150# (B 16.5)

4

209

836.72

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", WNRF FLANGE, ANSI - 300# (B 16.5)

6

646

3881.22

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", WNRF FLANGE, ANSI - 300# (B 16.5)

4

395

1583.36

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3/4", WNRF FLANGE, ANSI - 300# (B 16.5)

6

325

1950.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1/2", WNRF FLANGE, ANSI - 300# (B 16.5)

6

225

1351.62

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", WNRF FLANGE, ANSI - 600# (B 16.5)

4

863

3454.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", WNRF FLANGE, ANSI - 600# (B 16.5)

2

667

1334.5

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3/4", WNRF FLANGE, ANSI - 600# (B 16.5)

4

576

2304.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1/2", WNRF FLANGE, ANSI - 600# (B 16.5)

4

384

1536.16

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 18", BLRF FLANGE, ANSI - 600# (B 16.5)

1

66693

66693.13

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 14", BLRF FLANGE, ANSI - 600# (B 16.5)

1

29443

29443.88

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 12", BLRF FLANGE, ANSI - 600# (B 16.5)

1

28291

28291.74

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 10", BLRF FLANGE, ANSI - 600# (B 16.5)

2

14241

28483.76

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 8", BLRF FLANGE, ANSI - 600# (B 16.5)

2

8767

17535.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 6", BLRF FLANGE, ANSI - 600# (B 16.5)

2

5524

11049.36

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4", BLRF FLANGE, ANSI - 600# (B 16.5)

1

2581

2581.04

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3", BLRF FLANGE, ANSI - 600# (B 16.5)

2

1407

2814.9

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", BLRF FLANGE, ANSI - 600# (B 16.5)

1

709

709.09

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", BLRF FLANGE, ANSI - 600# (B 16.5)

1

308

308.95

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 16", BLRF FLANGE, ANSI - 300# (B 16.5)

2

22356

44712.38

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 12", BLRF FLANGE, ANSI - 300# (B 16.5)

2

12510

25020.92

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 10", BLRF FLANGE, ANSI - 300# (B 16.5)

2

7279

14559.42

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 8", BLRF FLANGE, ANSI - 300# (B 16.5)

2

4809

9618.3

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 6", BLRF FLANGE, ANSI - 300# (B 16.5)

2

2443

4887.46

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4", BLRF FLANGE, ANSI - 300# (B 16.5)

2

1795

3591.58

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3", BLRF FLANGE, ANSI - 300# (B 16.5)

2

998

1997.46

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", BLRF FLANGE, ANSI - 300# (B 16.5)

2

506

1012.68

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1 1/2", BLRF FLANGE, ANSI - 300# (B 16.5)

2

403

806.7

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", BLRF FLANGE, ANSI - 300# (B 16.5)

1

326

326.11

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 4.500" ODx 0.237" WT (Sch.STD) ASTM A 106 Gr B bare Pipe

12

3135

37627.92

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 3.500" ODx 0.216" WT (Sch.STD) ASTM A 106 Gr B

12

2222

26672.88

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 2.375" ODx 0.218" WT (Sch.XS) ASTM A 106 Gr B bare pipe

12

1522

18266.76

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 1.315" ODx 0.179"WT (Sch.XS) ASTM A 106 Gr B Bare pipe

12

691

8303.04

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" 600# Equal Tee (LTCS)

2

1763

3527.2

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 600# Equal Tee (LTCS)

4

877

3510.04

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 600# Equal Tee

2

425

851.76

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 600# Equal Tee

2

401

802.42

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" 300# Equal Tee

2

1085

2171.24

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 300# Equal tee

2

517

1034.12

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 300# Equal tee

2

321

643.64

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 300# Equal tee

2

313

626.48

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" ANSI 600# 90 deg LR Bends

2

2092

4185.88

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 600# 90 deg LR Bends

4

1453

5814.32

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 600# 90 deg LR Bends

4

555

2222.72

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 600# 90 deg LR Bends

50

337

16895.5

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" ANSI 300# 90 deg LR Bends

2

2186

4372.54

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 300# 90 deg LR Bends

2

1841

3683.82

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 300# 90 deg LR Bends

2

1086

2173.4

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 300# 90 deg LR Bends

50

330

16520

... More
Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document: 1" X 1500# W/W or F/F, A/G, HOV, API 602 GATE VALVE_

2

16164

32328.52

... More
Corrosion Coupon: Supply of TOR Fitting Complete With Plug & Cap and Full bore Threaded Ball Valve: TOR fitting complete with Caps, Plugs, O-Rings, Nipple & 2" 600# full bore threaded ball valve.

1

22163

22163.1

... More
Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document: 1" x 800# W/W or F/F, A/G, HOV, API 602 GATE VALVE

6

8620

51723.9

... More
Supply and delivery of BS 5351/ISO 17292 Ball valve for use in process piping at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document. 1" x 800# Ball valve HOV W/ W or F/F BS 5351

2

13643

27286.56

... More
Supply and delivery of 2"x ANSI 150# HOV F/F API 6D Ball VALVE for use in process piping at respective stations as per Station wise Break up of material supply and as per technical specifications

1

24809

24809.58

... More
Supply and Delivery of 18" OD x 0.438" WT, API5L PIPE, UPTO X52, BARE

10

12573

125736.8

... More
Supply and Delivery of 10.75" OD x 0.438" WT, API5L PIPE, UPTO X52, BARE

10

7382

73829.8

... More
Supply and delivery of BALL VALVE API6D,HOV,F/F, A/G, TRU,BOL,FIR,2,600 for use in process piping at respective stations as per Stat ion wise Break up of material supply and as per technical specifications

1

37326

37326.48

... More
Taking out damaged insulation Taking out old worn out damaged insulation materials of any thickness including wool, mattress, pre-fo rmed sections or any other insulating materials including cladding of aluminium or GI sheet from any height and location etc. comple te and transporting and stacking the serviceable materials to owner's storage point and damaged materials within 2.00 km lead inside Refinery .The job also includes cleaning the site, transporting the materials to directed place at any height, complete with all la bour and materials etc. as per specification and direction of Engineer-In-Charge but excluding the cost of scaffolding. (Payment sha ll be made on the previously finished surface area).

150

32

4948.5

... More
Taking out damaged cladding: Taking out old worn out damaged cladding of any thickness (plain or corrugated; GI or Aluminium sheet) from any height and location and transporting and stacking the serviceable materials to owner's storage point and damaged material s to the directed place within refinery premises within 2.00 km lead. The job also includes cleaning the site, transporting the mate rials to directe place, complete with all labor and materials etc.as per direction of Engineer-in-Charge but excluding the cost of s caffolding. (Payment shall be made on the previously finished surface area).

150

16

2475

... More
New or old cladding over insulation: "Fixing cladding with new/ old aluminium/ GI sheets, plain or corrugated. The job includes cutt ing, bending and grooving to proper shape and size, providing minimum 50mm overlaps on both longitudinal and circumferential joints including end terminating securing the overlaps alternately by POP rivets and self-tapping screws at every 150mm c/c, and securing additionally with metalic bands at a maximum spacing of 300mm c/c at any height and location with all labour, materials etc. com plete as per direction of Engineer-in-Charge but excluding the cost of scaffolding. (Payment of above shall be made on the area of t he finished surface). Note: 1. Screw, required for metal jacket securement shall be SS /Cadmium plated steel self tapping , type A N o.8 Dia*12mm long to BS 4176 complete with Neoprene washers under the head. Rivets required for metal jacket securement shall be the expanding aluminium ""POP"" blind eye type/SS, 9.5mm long* 5mm dia. 2. For additional securement of cladding, Band, SS 12mm (Min.) wide *24SWG thick is to be used for pipings and Band, SS 20mm wide *24SWG thick is to be used for equpiments. 3.For ensuring perfe ct water proofing, all the cladding joints shall be sealed with approved elastomeric metal sealant. 4. For insulations with vapour b arrier, cladding shall not be applied until the vapour barrier has completely dried and solvents have dissipated. Self tapping scr ews/ rivets shall not be used to secure aluminium cladding as they may puncture the vapour barrier."

-

-

-

... More
Sheets issued by the owner free of cost: New / old aluminium / GI plain / corrugated sheets issue by the owner free of cost

150

125

18877.5

... More
Al sheet - Plain - 22 G sheet by contractor Aluminium sheet - Plain - 22 SWG as per ASTM B209 Alloy 3003 H16 or IS-737 Designation 3 1000, Condition H3 - to be arranged by contractor

150

688

103242

... More
Providing and fixing LRB mattresses Providing and fixing single/ multiple layer of machine stitched LRB mineral wool mattresses con forming to IS:8183/ASTM C 592, Class-II, faced on one side with 20mm galvanised 22 SWG wire mesh, suitable for temperature up to 550 Deg C, in required thickness over the pipings and technological equipments like columns, vessels, ducts, horton spheres, storage tanks etc., including cleaning of the surface with wire brush, fixing the insulation mattresses in position and securing the same p roperly etc. all complete with tools, tackles, materials such as lacing, binding, stitching wire, labour etc. complete in accordance with the specifications laid down in the contract, latest IS standards and as per the directions of Engineer-in-Charge; but excludi ng the cost of scaffolding. "Note: 1. Contractor has to make his own arrangement for procurement and storage of all the materials an d has to produce manufacturer's test certificate in support of characteristics of insulation materials i.e. 'K' value, density etc. 2. The joints of fibrous insulation material shall be tightly butted and laced together with 1mm dia galvanised lacing wire. 3. In sulation thickness more than 75mm shall be in multi layers. 4. Each layer of the piping insulation shall be secured firmly in place with atleast 3 loops of 24SWG thick x 12mm wide SS bands, one loop to be placed not more than 75mm from each end and atleast one lo op shall be equally spaced betweeen two end loops. 5. Shells of equipments shall be secured by 24SWG thick x 20mm wide SS bands at e very 225mm c/c 6.The item includes disposal of the debris to the directed place within 2km lead as per the direction of Engineer-in- Charge. "

-

-

-

... More
LRB mattress 100 kg/cum - 50mm: LRB mattress of density 100 kg/cum - 50mm Thick

150

358

53734.5

... More
Process Tube, Material: Stainless Steel, Manufacturing process: Seamless, Mat Specification:ASTM A269, Grade: TP316, end Finish: Pla in End, 1/2 IN OD, 0.065 IN Thickness, 3000 MM Length.

6

327

1963.8

... More
Fitting, Bushing, 25.4 MM X 12.7 MM NPT(F), Material: Carbon Steel, Manufacturing Process: Forged, Material Specification: A105, End Finish: Threaded, conform to ANSI 16.11 

5

100

504.75

... More
Excess Flow Valve Nominal Working Pressure: 6000psi/421 Kg/Sqcm, End Connection: 1/2" NPTM for 1/2" OD SS tube, MATERIAL SS 316

5

1812

9064.95

... More
Male Connector, 12.7 MM MNPTX 12.7 MM OD Tube, Material: SS316, 211 kg/sqcm (3000 psi) complete with ferrules & nuts as per ANSI B.2 .1.

5

163

816.35

... More
Female Connector, 12.7 MM FNPT X 12.7 MM OD Tube, 211 kg/sqcm (3000 lbs) complete with ferrules and nut as per ANSI B.2.1, Material : SS316

5

185

928.55

... More
Union Tee, 3X12.7 MM OD Tube, 211 kg/sqcm (3000 lbs) as per ANSI 16.11, Material : SS316.

5

398

1994.1

... More
Tube End Cap ( Sq Head), 12.7 MM OD Tube, 211 kg/sqcm (3000 lbs) as per ANSI B 16.11, Material : SS316.

5

99

497.45

... More
2 Way Valve Manifold 2 x 12.7 MM FNPT, Material : SS316 with blanking plug for each port.

5

1318

6592.35

... More
Hex Nipple, 12.7 MM MNPT X 12.7 MM MNPT X 80 MM Long, Material : SS316

5

81

405

... More
PLUG (SQ. Head) 12.7 MM (½”) NPTM, 211 Kg/Cm2 (3000 PSI) as per ANSI B 16.11, Material-SS 316

5

63

318.75

... More
NEEDLE VALVE 12.7 MM (½" FNPT) X 12.7 MM (½" FNPT), MATERIAL-SS316

5

741

3708.5

... More
90 Deg ELBOW 12.7 MM (½”) FNPT X 12.7 MM (½”) FNPT, 211 KG/CM2 (3000 PSI) as per ANSI B 16.11. MATERIAL - SS 316

5

429

2148.95

... More
"Supply of full nitrogen cylinders at PHBMPL Haldia station premises including loading, unloading, transportation of cylinders as pe r requirement and as directed by the Engineer-in-Charge: a) Cylinder Purity level: 99.98% b) Cylinder capacity: 7 cum of N2 gas at 27 deg C. c) Cylinder to be mobilized at site within 4-5 hours of intimation (intimation to be given during normal office working hours). d) Mobilization of full cylinders and demobilization of empty cylinders is under the scope of contractor. e) Cylinder can be summoned in varying quantity as per IOCL requirement within the contract period. f) Rate shall remain firm for the entire duration of contract. "

30

3142

94264.8

... More
"Supply of Mono Ethylene Glycol (MEG) at ERPL Haldia: a) Supply of Mono Ethylene Glycol at ERPL Haldia as and when required and instructed by EIC/ Site Engineer. b) The material shall be delivered within 01 week after intimation by EIC/ Site Engineer. c) In case of third party purchase of material, prior approval should be taken by EIC/ Site Engineer before ordering the material. P arty shall supply the product from latest manufactured lot. Also the vendor shall submit the data sheet and manufacturer’s certifica te for shelf life."

300

187

56127

... More
Supply of Demineralized (DM) Water

300

62

18720

... More
Supply of ANTI CORROSIVE SPRAY,WD-40 (Material code: 6492751004)

48

201

9654.72

... More
WATER WORKS CLEANER (Material code: 6499921024)

12

1436

17243.4

... More
COTTON WASTE,YARN, 25 KGS (Material code: 9380580604) Note: EA means KG

250

41

10455

... More
COLOUR COTTON WASTE (Material code: 9380581454) Note: EA means KG

1200

55

66000

... More
"Calibration of Thermal Relief valves of different sizes and rating: 1. Closing of upstream and downstream valves (as applicable) of TRV, removal of TRV from the pressure piping and providing blind alo ng with gasket (already installed) in the piping on both upstream & downstream sides. 2. Dismantling all the parts of Thermal relief valve completely. 3. Cleaning all its critical parts by diesel, carrying out any lapping, machining of seat or any other part if required. Applying gr ease over metallic part wherever required. 4. Providing new gasket/O-ring if found damaged. 5. Assembly of TRV. 6. Pressure setting of the TRV at the desired pressure by loading in the test bench and calibration. 7. Removing blind from the station piping (from where the said TRV was removed) and fitment of the calibrated TRV. 8. Painting (synthetic enamel) of the TRV and providing metal tag with cable tie mentioning TRV tag no., serial no., calibration dat e, due date of calibration, pressure set point. 9. Putting back TRV back to operation by opening upstream and downstream valves. 10. Certification of TRV from PESO approved agency . 11. Submission of Calibration reports alonwith necessary documents from PESO approved agency Location of maintenance, testing and calibration: Within ERPL Haldia Premises"

220

1782

392099.4

... More
"Testing,Calibration and certification of Pressure Safety Valves of different size and rating 1.Dismantling all the parts of PSV completely. 2.Cleaning all its critical parts by diesel, carrying out any lapping, machining of seat or any other part if required. Applying gre ase over metallic part wherever required. 3.Providing new gasket/O-ring if found damaged 4.Location of maintenance, testing and calibration: Within ERPL Haldia Premises. 5.Painting (synthetic enamel) of the PSV and providing metal tag with cable tie mentioning PSV tag no., serial no., calibration date , due date of calibration, pressure set point. 6.Certification from PESO approved agency 7. Submission of Calibration reports alonwith necessary documents from PESO approved agency Location of maintenance, testing and calibration: Within ERPL Haldia Premises"

20

1517

30350.4

... More
Mech. Maint. ARC- PSHPL Haldia

-

-

-

... More
"DISMANTLING OF CARBON STEEL/ALLOY STEEL PIPING BY HOT WORK (INSULATED / UNINSULATED): Dismantling and removal of above ground, overhead or under ground (upto height depth of 5m) redundant/ insulated/ uninsulated pipin g of carbon steel / alloy steel by gas cutting or by grinding from various locations such as pipe racks, columns, pump house, heater s, heat exchangers etc. including removal of insulation material, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregating for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbo lting, gas cutting, cold cutting etc.; transporting and stacking the salvageable useful materials to workshop / instrument workshop/ store or as per the direction of the Engineer-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location withi n PSHPL-ERPL Haldia premises and completing the job as per the instructions of Engineer-in-Charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and l abour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and de-blinding, area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paid under separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately."

-

-

-

... More
25 mm NB

20

39

797.4

... More
50 mm NB

10

75

756.7

... More
100 mm NB

10

143

1433.6

... More
150 mm NB

5

235

1177.85

... More
200 mm NB

5

306

1533.35

... More
250 mm NB

5

417

2089.05

... More
300 mm NB

5

495

2478.1

... More
350 mm NB

5

544

2720.65

... More
400 mm NB

2

621

1243.72

... More
450 mm NB

2

699

1399.2

... More
600 mm NB

2

932

1865.58

... More
750 mm NB

2

1400

2800.2

... More
"COLD CUTTING OF CARBON / ALLOY STEEL PIPE LINES (INSULATED / UNINSULATED): Cold cutting and removal of above ground or overhead/ underground in tranches/ insulated/ uninsulated pipelines of carbon steel/ all oy steel from various location such as pipe racks, columns, pump house, heaters, heat exchangers etc. including removal of insulatio n materials, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down / lifting the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregati ng for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc. trans porting and stacking the salvageable useful materials to workshop / instrument workshop/ store or as per the direction of the Engine er-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location within PSHPL-ERPL Haldia premises all complete as per the instructions of Engineer-in-Charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, Machineries, all consumables and l abour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and deblinding, area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paid under separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately."

-

-

-

... More
25 mm NB

10

74

741

... More
50 mm NB

5

172

864.15

... More
100 mm NB

5

344

1720.35

... More
150 mm NB

5

565

2826.8

... More
200 mm NB

5

694

3472.15

... More
250 mm NB

2

865

1730.84

... More
300 mm NB

2

1026

2053.18

... More
350 mm NB

2

1127

2254.12

... More
400 mm NB

2

1288

2576.14

... More
450 mm NB

2

1449

2898.14

... More
600 mm NB

2

1932

3864.2

... More
750 mm NB

2

2559

5119.46

... More
"CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E- 6013/ER70S-2) - UNITS Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, O-let, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics u pto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scop e also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labou r etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushin g wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricatio n as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.25 mm NB, Schedule upto 4 0 (TIG)"

25

86

2171.75

... More
"CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E- 6013/ER70S-2) - UNITS Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, O-let, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics u pto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scop e also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labou r etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushin g wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricatio n as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.25 mm NB, Schedule above 40 but upto 80 (TIG)"

20

128

2564.4

... More
"CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E- 6013/ER70S-2) - UNITS Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, O-let, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics u pto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scop e also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labou r etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushin g wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricatio n as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.50 mm NB, Schedule upto 4 0"

10

193

1930

... More
"CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E- 6013/ER70S-2) - UNITS Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, O-let, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics u pto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scop e also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labou r etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushin g wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricatio n as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.50 mm NB, Schedule more t han 40 but upto 80"

10

259

2593.4

... More
"CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E- 6013/ER70S-2) - UNITS Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, O-let, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics u pto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scop e also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labou r etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushin g wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricatio n as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.100 mm NB, Schedule upto 40"

5

491

2456.7

... More
"CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E- 6013/ER70S-2) - UNITS Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, O-let, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics u pto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scop e also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labou r etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushin g wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricatio n as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.100 mm NB, Schedule more than 40 but upto 80"

5

547

2739.6

... More
"CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E- 6013/ER70S-2) - UNITS Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, O-let, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics u pto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scop e also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labou r etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushin g wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabricatio n as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.350 mm NB, Schedule more than 20 but upto 40"

5

1902

9514.35

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.25 mm NB, Schedule upto 4 0 (TIG)"

25

123

3087.25

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.25 mm NB, Schedule above 40 but upto 80 (TIG)"

25

159

3986.75

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.40 mm NB, Schedule upto 4 0 (TIG)"

20

230

4608.4

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.40 mm NB, Schedule above 40 but upto 80 (TIG)"

20

242

4842.4

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.50 mm NB, Schedule upto 4 0"

10

240

2400.4

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.50 mm NB, Schedule more t han 40 but upto 80"

10

252

2522.3

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.80 mm NB, Schedule upto 4 0"

5

371

1858.4

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.100 mm NB, Schedule upto 40"

5

477

2389.4

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.100 mm NB, Schedule more than 40 but upto 80 "

2

533

1066.56

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.350 mm NB, Schedule upto 20"

2

1565

3130.72

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.350 mm NB, Schedule above 20 but upto 40"

2

1813

3627.54

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.400 mm NB, Schedule upto 20"

2

1788

3577.96

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.400 mm NB, Schedule above 20 but upto 40 "

2

2072

4145.76

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.450 mm NB, Schedule upto 20"

2

2012

4025.2

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.450 mm NB, Schedule above 20 but upto 40"

2

2331

4663.98

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.600 mm NB, Schedule upto 20"

2

2683

5366.94

... More
"CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018/ER70S-2) - UNITS: Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, strainers, orifice a ssemblies (including tapping upto first block valve), spray nozzles; tapping for instrument connections like pressure gauges, thermo wells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instru ments, elbows, tees, flanges, reducers, Olet, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics up to 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.750 mm NB, Schedule upto 20"

2

3555

7110.34

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.25 mm NB, Schedule upto 40 (TIG)"

10

296

2963.8

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.25 mm NB, Schedule above 4 0 but upto 80 (TIG)"

10

382

3827.3

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.40 mm NB, Schedule upto 40 (TIG)"

10

553

5530.1

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.40 mm NB, Schedule above 4 0 but upto 80 (TIG)"

10

581

5811

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.50 mm NB, Schedule upto 40 "

10

576

5761

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.50 mm NB, Schedule more th an 40 but upto 80"

10

605

6053.6

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.80 mm NB, Schedule upto 40 "

5

892

4460.2

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.100 mm NB, Schedule upto 4 0"

5

1146

5734.5

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.100 mm NB, Schedule more t han 40 but upto 80 "

5

1279

6399.3

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.350 mm NB, Schedule upto 2 0"

2

3756

7513.72

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.350 mm NB, Schedule above 20 but upto 40"

2

4353

8706.08

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.400 mm NB, Schedule upto 2 0"

2

4293

8587.1

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.400 mm NB, Schedule above 20 but upto 40 "

2

4974

9949.8

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.450 mm NB, Schedule upto 2 0"

2

4830

9660.5

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.450 mm NB, Schedule above 20 but upto 40"

2

5596

11193.54

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.600 mm NB, Schedule upto 2 0"

2

6440

12880.66

... More
"CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7010 / E-7018 / ER70S-2): Transportation of all piping items from owner's storage points to work site and / or prefabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sati sfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all con sumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completio n of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 3. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rat es to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 4. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.750 mm NB, Schedule upto 2 0"

2

8532

17064.84

... More
"SALVAGING OF CARBON STEEL PIPING: Cutting, Grinding, Bevelling and Welding of pipe ends upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches as per instruction of the Engineer-in-charge complete with supply of tools, tackles consumables labours and contractor's supervision. Note: ID = Inch-dia"

2

389

779.96

... More
"STAINLESS STEEL PIPING (GR. SS 300) Transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation of smal l bore isometric upto 0.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sa tisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, fl ushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabri cation as directed by the Engineer-in-Charge. Piping up to 40mm NB shall be fully TIG welded."

-

-

-

... More
15 mm NB, Schedule upto 40 (TIG)

20

95

1911.8

... More
15 mm NB, Schedule more than 40 but upto 80 (TIG)

20

152

3053.4

... More
15 mm NB, Schedule above 80 but upto 120 (TIG)

20

152

3053.4

... More
20 mm NB, Schedule upto 40 (TIG)

20

119

2389.4

... More
20 mm NB, Schedule more than 40 but upto 80 (TIG)

20

190

3816.2

... More
20 mm NB, Schedule above 80 but upto 120 (TIG)

20

227

4540.8

... More
25 mm NB, Schedule upto 40 (TIG)

20

238

4779.2

... More
25 mm NB, Schedule more than 40 but upto 80 (TIG)

20

238

4779.2

... More
25 mm NB, Schedule more than 80 but upto 160 (TIG)

20

300

6000.4

... More
"STAINLESS STEEL PIPING (GR. SS 300) JOINTS Transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabri cation; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edg es of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; anchoring wherever required, connecting with equipment, nozzles, steam traps, straine rs, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections lik e pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation of smal l bore isometric upto 0.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire sa tisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, fl ushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabri cation as directed by the Engineer-in-Charge. Piping up to 40mm NB shall be fully TIG welded."

-

-

-

... More
15 mm NB, Schedule upto 40 (TIG)

10

229

2294.2

... More
15 mm NB, Schedule more than 40 but upto 80 (TIG)

10

366

3664.2

... More
15 mm NB, Schedule above 80 but upto 120 (TIG

10

366

3664.2

... More
20 mm NB, Schedule upto 40 (TIG)

10

286

2867.3

... More
20 mm NB, Schedule more than 40 but upto 80 (TIG)

10

457

4579.4

... More
20 mm NB, Schedule above 80 but upto 120 (TIG

10

544

5448.9

... More
25 mm NB, Schedule upto 40 (TIG)

10

573

5734.9

... More
25 mm NB, Schedule more than 40 but upto 80 (TIG)

10

573

5734.9

... More
25 mm NB, Schedule more than 80 but upto 160 (TIG)

10

720

7200.6

... More
"FABRICATION OF STRAINER The job includes fabrication of strainer by cutting,bending,forming of strainer frame and fixing of SS wire mesh by tying,stitching and welding etc.and grinding/smoothening the same,complete in all respect as per specification, drawing and instruction of Engineer-in-Charge."

-

-

-

... More
Dia - 450 mm

2

1932

3864.2

... More
Dia - 750 mm

2

3412

6825.94

... More
"HYDROTESING OF PIPING WORKS Hydrostatic testing of pipelines at the specified pressure including blinding/de blinding, fabrication and fixing of testing connections, pressure gauge installation. Hose pipe connection and making all other arrangements as required and dewatering, flushing and boxing up after fixing proper gaskets with supply of all labour, tools and tackles, instruments and instruction of the Engineer-in-Charge. The job has to be carried out at all elevations. In case of Hydrotest Failure, Re-testing shall be carried out at no extra cost. "

-

-

-

... More
450 mm

25

413

10344

... More
"FAB/ERECT PPL SUPPORTS/ PLATFORMS ETC. FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DAVITS / STAIR CASE ETC. The job includes getting the materials issued, transportation to work site and handling at site, fabrication at the required size an d shape using steel pipes, MS structural / plates etc. by cutting, bevelling and welding including fixing of MS gratings / chequered plates on platform at all elevation by welding, bolting or otherwise to existing members or equipment. This also includes fabricati on and fixing of pipe clamps, non-standard bolts etc. inclusive of labour, consumables, heavy equipment, tools and tackles and mater ials required for U-clamps, J-bolts etc. and complete in all respect as per drawings, specifications and instructions of the Enginee r-in-Charge. (Excluding cost of structural steel)."

-

-

-

... More
"FABRICATION AND ERECTION OF PIPE SUPPORT / DAVITS/ VALVE SUPPORT/ BASE FRAME OF PROCESS AND AUXILIARY EQUIPMENT SUPPORT ETC. The job includes getting the materials issued, transportation to work site and handling at site, fabrication at the required size an d shape using steel pipes, MS structural / plates etc. by cutting, bevelling and welding including fixing of materials at all elevat ion by welding, bolting or otherwise to existing pipes, devit, members or equipment. This also includes fabrication and fixing of pi pe clamps, required fasteners etc. inclusive of labour, consumables, heavy equipment, tools and tackles and materials required for U -clamps, J-bolts etc. and complete in all respect as per drawings, specifications and instructions of the Engineer-in-Charge. (Exclu ding cost of structural steel)."

12

30418

365019.36

... More
DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / DAVITS/ VALVE SUPPORT, BASE FRAME OF PROCESS AND AUXILIARY EQUIPMENT ETC.

-

-

-

... More
"Removal of existing pipe supports / davits / valve support/ base frame for process and auxiliary equipments etc. along with adjacen t fittings / members by cutting / debolting or by any other means without damaging the remaining unit and lowering down to the groun d, retrieving of all the usable materials and transportation to the storage point as directed by the Engineer-in-Charge and complete in all respect with all labour, tools, tackles, heavy equipment, consumables and supervision etc. as per the direction of the Engin eer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately."

2

13014

26028.18

... More
"DYE PENETRATION TEST FOR PIPING WORKS: Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc. along with all equipment’ s, labour, for carrying out the work as per specification and direction of engineer -in-charge at all elevations. Test has to be car ried out in all metallurgy the test has to carry out on all schedules of pipes."

-

-

-

... More
"For pipes (per inch dia) Note: ID = Inch-dia"

200

55

11070

... More
" For Vessels / Tanks (Per Inch)/other surfaces Per Inch length Note: "" = Per Inch"

50

17

874.5

... More
"RADIOGRAPHY OF PIPING WORKS: Performance of radiographic inspection on all type and sizing of piping/ pipe fittings in position at all heights inclusive of provi ding sources, film, chemicals, and all necessary equipment, consumables etc. complete in all respect as per specification and instru ction of the Engineer-in-Charge."

-

-

-

... More
"For pipes (per inch dia) Note: ID = Inch-dia"

100

329

32968

... More
"For Vessels / Tanks (Per Inch)/other surfaces Per Inch length Note: "" = Per Inch"

25

95

2390.75

... More
"FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING UPTO 300# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating upto 300#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets from the sheet includi ng tools and tackles, consumables, supervision etc. and as per direction of the Engineer-in-Charge."

-

-

-

10

48

480.2

25

96

2401.25

25

153

3841.75

... More
100 mm

25

192

4802.25

... More
150 mm

10

288

2881.4

... More
300 mm

10

576

5762.8

... More
350 mm

10

672

6723.2

... More
400 mm

10

768

7683.7

... More
450 mm

10

864

8644.2

... More
600 mm

6

1152

6915.3

... More
750 mm

5

1440

7203.45

... More
"FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING MORE THAN 300# AND UPTO 600# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating more than 300# and upto 600#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets fro m the sheet, cleaning of fasteners and fange faces including tools and tackles, consumables, supervision etc. and as per direction o f the Engineer-in-Charge."

-

-

-

... More
300 mm

10

720

7203.5

... More
350 mm

20

840

16808

... More
400 mm

5

960

4802.3

... More
450 mm

5

1080

5402.6

... More
600 mm

5

1440

7203.45

... More
750 mm

5

1800

9004.3

... More
"FABRICATION OF PLATE FLANGES Fabrication of plate flanges for the given plate and shifting of material for store to work place and fabricating as per drawing and instruction of Engineer-in-Charge."

-

-

-

... More
Upto size Dia 50 mm

5

58

292.6

... More
Above Dia 50 mm and up to Dia 100 mm

2

117

234.08

... More
Above Dia 100 mm and up to Dia 200 mm

2

253

507.04

... More
Above Dia 200 mm and up to Dia 300 mm

2

380

760.56

... More
Above Dia 300 mm and up to Dia 400 mm

2

507

1014.08

... More
Above Dia 400 mm and up to Dia 500 mm

2

1116

2233.4

... More
Above Dia 500 mm and up to Dia 600 mm

2

1340

2680.08

... More
"SUPPORT PAD WELDING OF PIPES The job involves transportation of all items including all types of structures, pipes etc. from owner's storage point to work site a nd / or prefabrication yard and welding including cutting / grinding / edge preparing and required testing to prove soundness of wel ding with supply of all consumables, manpower, tools as per technical specification and direction and satisfaction of the Engineer-i n-Charge."

-

-

-

... More
For Pipe Dia up to 25mm

2

259

519.04

... More
For pipe Dia 40 mm

2

273

547.46

... More
For pipe Dia 50 mm

2

285

570.36

... More
For pipe Dia 80 mm

2

312

624.92

... More
For pipe Dia 100 mm

2

336

673.4

... More
For pipe Dia 150 mm

2

388

776.42

... More
For pipe Dia 300 mm

2

536

1073.3

... More
For pipe Dia 350 mm

5

566

2834.45

... More
For pipe Dia 400 mm

5

615

3076.75

... More
For pipe Dia 450 mm

4

663

2655.28

... More
"INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES/ RADIATOR ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, engine radiator, gaskets, nut bolts etc. ei ther from owner's storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepe rs, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ r ing properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing s trips, complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles , hydra/crane, lifting belt, sling, D-schakle etc. consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable."

-

-

-

... More
For Valves (other than RTJ e.g. MOV/HOV/NRV)

8000

30

244240

... More
REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES /RADIATOR ETC.

-

-

-

... More
Dismantling and removal of all types of flanged including RTJ valves, level troll, fire hydrant, monitor, engine radiator by debolti ng/ cold/ hot cutting of fasteners wherever required from pipelines at ground level i.e. up to a height of 5 meters on sleepers, pip e racks etc. or up to 5 meters depth in trenches including removal of gaskets, nut bolts etc. and transportation either to owner's s torage point / workshop and / or scrapyard including loosening of studs, disconnecting earthing protection all complete as per direc tion of the Engineer-in-Charge including all labour, tools, tackles, hydra/crane, lifting belt, sling, D-schakle etc. consumables an d supervision etc.

8000

22

183200

... More
"IN-SITU FLANGE MACHINING OF FLANGES (ALL TYPES): Charges to carry out in situ machining of Gasket Face Flanges (all types of flanges) of Pipe/ Pipe Fittings/ Manhole/ Vessel Manhole / or any other Equivalent Equipment with skilled manpower & suitable equipment/ machinery. Job includes supplying of all types of to ols and tackles, jigs and fixtures, lifting arrangements, electrodes, welding equipment, PMI machine, machineries, all consumables, labour etc. and supervision to complete the work in all respects as per drawings and direction of the Engineer-in-Charge, including area preparation, taking clearance for hot jobs, area cleaning after completion of work, flushing wherever required. The scope inclu des all necessary jobs (including weld buid up) required to restore the flange face finish as per ASME B16.5/ B16.47 as per drawing specifications. The machined surface flatness and/ AARH, as applicable, is to be maintained as per prevailing codes and standards. Contractor to identify the flange metallurgy for electrode selection required for weld build up. Contractor has to execute weld buil d up jobs under the inspection of executing Department of PSHPL-ERPL Haldia. After completion of work, the flange has to pass throug h pressure testing. Unit of measurement ""inch-dia"" denotes inch-dia of the circular / oval flanges. In case of oval flanges, the measurement highest f lange dia of a particular flange will be considered. Note: • Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be pa id separately."

-

-

-

... More
"IN-SITU FLANGE MACHINING OF FLANGES Note: ID = Inch-dia"

24

1163

27919.2

... More
MOBILISATION AND DEMOBILIZATION CHARGES

1

18548

18548.07

... More
"WELDING OF CS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding o f CS plates including cutting / bending/ grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools & tackles, supervision as per technical specifications, drawings and complete the job in all re spect as per direction of the Engineer-in-Charge."

-

-

-

... More
Upto 3mm thick

2

1365

2731.86

... More
Above 3 mm & upto 5 mm thick

2

1854

3709.58

... More
Above 5 MM & upto 6 mm thick

2

2414

4828.68

... More
Above 6 mm & upto 7 mm thick

5

2785

13929.75

... More
Above 7 mm & upto 9 mm thick

5

3078

15393.35

... More
Above 9 mm & upto 11 mm thick

2

3484

6968.82

... More
"CS / AS PLATE CUTTING Transportation of material from owner's storage point to work site, cutting of CS / AS plate by Gas/ grinding or any other means and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, cons umables and supervision etc."

-

-

-

... More
Upto 3mm thick

2

50

100.06

... More
Above 3 & upto 5mm thick

2

58

116.74

... More
Above 5 & upto 6mm thick

2

63

127.36

... More
Above 6 & upto 8mm thick

10

70

700.5

... More
Above 8 & upto 10mm thick

10

77

778.3

... More
Above 10 & upto 12mm thick

2

93

186.8

... More
"COLD CUTTING OF BOLTS Cutting of bolts in position with hacksaw by cold cutting because of seized condition of bolts and nuts that can not be opened by or dinary means, as per instructions of the Engineer-in-Charge. Supply of consumables, labour, tools and tackles, equipment, supervisio n, area cleaning etc. will be in contractor's scope."

-

-

-

... More
Cold Cutting of Bolts per Inch Dia

200

88

17652

... More
"BUFFING OF WELD JOINTS: Job involves buffing and cleaning of total weld area of the vessel /column etc. using power brush. The job has to be completed in al l respect to the entire satisfaction of the Engineer-in-Charge including all labour, tools, tackles, consumables and supervision etc . (each length of buffing will be up to width of 150 mm)."

250

48

12237.5

... More
"STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE): The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the area s specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding ma terial including supply of all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-Char ge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective r ates against mentioned height slabs."

-

-

-

... More
Up to 6m height

266

101

27030.92

... More
Above 6m up to 10m height

144

145

20904.48

... More
Above 10m up to 20m height

360

203

73162.8

... More
Above 20m up to 30m height

144

338

48775.68

... More
"Supply and Erection of Structural Steel: Supplying at site, steel structural items such as steel plates, bars, MS gratings, chequered plates, angles, beams channels, commerc ial quality heavy pipes, C.I. Rollers, bolts & nuts, washers, grouting bolts, padding plates etc., fabrication and erection of saddl e supports and other type of supports for pipes manifolds and valves, fabrication and erection of platforms walkways, stairways etc. , sand blast/ power brush cleaning, priming and painting the finished structures including supply of all other inputs such as labour , materials, consumable etc. necessary to perform and complete the work in all respect, in accordance with drawings, specifications and instructions of the Site Engineer / EIC."

3

125372

376118.37

... More
Fasteners for Flanges 42" x 150# (1.0" Dia. X 8" Length)

5

1080

5401.3

... More
Fasteners for Flanges 36" x 150# (1.5" Dia. X 11.75" Length)

5

925

4628.9

... More
Fasteners for Flanges 30" x 150# (1.25" Dia. X 10.00" Length)

5

771

3856.55

... More
Fasteners for Flanges 28" x 150# (1.25" Dia. X 9.75" Length)

5

719

3599.05

... More
Fasteners for Flanges 24" x 150# (1.125" Dia. X 7.75" Length)

5

382

1914.85

... More
Fasteners for Flanges 20" x 150# (1.125" Dia. X 7.00" Length)

5

327

1635.95

... More
Fasteners for Flanges 18" x 150# (1.125" Dia. X 6.50" Length)

5

251

1255.1

... More
Fasteners for Flanges 16"" x 150# (1.000" Dia. X 6.00" Length)

5

229

1147.8

... More
Fasteners for Flanges 14" x 150# (1.000" Dia. X 6.00" Length)

5

268

1340.9

... More
Fasteners for Flanges 12" x 150# (0.875" Dia. X 5.50" Length)

10

160

1609.1

... More
Fasteners for Flanges 10" x 150# (0.875" Dia. X 5.25" Length)

10

146

1469.6

... More
Fasteners for Flanges 8" x 150# (0.750" Dia. X 4.75" Length)

10

115

1158.5

... More
Fasteners for Flanges 6" x 150# (0.750" Dia. X 4.50" Length)

20

92

1845

... More
Fasteners for Flanges 4" x 150# (0.625" Dia. X 4.00" Length)

20

69

1394.4

... More
Fasteners for Flanges 3" x 150# (0.625" Dia. X 4.00" Length)

20

57

1158.4

... More
Fasteners for Flanges 2" x 150# (0.625" Dia. X 3.75" Length)

20

61

1222.8

... More
Fasteners for Flanges 1 1/2" x 150# (0.500" Dia. X 3.25" Length)

20

69

1394.4

... More
Fasteners for Flanges 1" x 150# (0.500" Dia. X 3.00" Length)

20

47

944

... More
Fasteners for Flanges 24" x 600# (1.875" Dia. X 14.25" Length)

5

1350

6752.95

... More
Fasteners for Flanges 20" x 600# (1.625" Dia. X 12.50" Length)

5

1116

5583.65

... More
Fasteners for Flanges 18" x 600# (1.605" Dia. X 14.75" Length ) - extended stud length for flanges with spectacle blind

5

1131

5658.75

... More
Fasteners for Flanges 18" x 600# (1.605" Dia. X 12.00" Length)

5

971

4859.55

... More
Fasteners for Flanges 16" x 600# (1.500" Dia. X 13.75" Length) - extended stud length for flanges with spectacle blind

5

734

3674.15

... More
Fasteners for Flanges 16" x 600# (1.500" Dia. X 11.00" Length)

5

593

2966.15

... More
Fasteners for Flanges 12" x 600# (1.25" Dia. X 12" Length) - extended stud length for flanges with spectacle blind

5

680

3400.6

... More
Fasteners for Flanges 12" x 600# (1.25" Dia. X 9.75" Length)

5

562

2810.6

... More
"Fasteners for Flanges 10"" x 600# (1.25"" Dia. X 11.5"" Length ) - extended stud length for flanges with spectacle blind"

5

844

4221.25

... More
Fasteners for Flanges 10" x 600# (1.250" Dia. X 9.50" Length)

5

647

3239.7

... More
Fasteners for Flanges 8" x 600# (1.125" Dia. X 10" Length) - extended stud length for flanges with spectacle blind

5

490

2451.2

... More
Fasteners for Flanges 8" x 600# (1.125" Dia. X 8.25" Length)

5

387

1936.3

... More
"Fasteners for Flanges 6"" x 600# (1.0"" Dia. X 9.0"" Length) - extended stud length for flanges with spectacle blind"

5

298

1491.1

... More
Fasteners for Flanges 6" x 600# (1.000" Dia. X 7.50" Length)

5

255

1276.55

... More
Fasteners for Flanges 4" x 600# ( 0.875" Dia. X 7.75" Length) - extended stud length for flanges with spectacle blind

5

311

1555.45

... More
Fasteners for Flanges 4" x 600# (0.875" Dia. X 6.50" Length)

5

264

1324.85

... More
Fasteners for Flanges 3" x 600# ( 0.75" Dia. X 6.75" Length ) - extended stud length for flanges with spectacle blind

5

143

718.7

... More
Fasteners for Flanges 3" x 600# (0.750" Dia. X 5.50" Length)

5

125

627.55

... More
Fasteners for Flanges 2" x 600# (0.625" Dia. X 5.75" Length) - extended stud length for flanges with spectacle blind

5

125

627.55

... More
Fasteners for Flanges 2" x 600# (0.625" Dia. X 4.75" Length)

5

105

525.6

... More
Fasteners for Flanges 1" x 600# (0.625" Dia. X 5.0" Length ) - extended stud length for flanges with spectacle blind

5

111

557.8

... More
Fasteners for Flanges 1" x 600# (0.625" Dia. X 4.00" Length)

5

81

407.6

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 18" SWMG ANSI 150#

6

750

4505.52

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 16" SWMG ANSI 150#

2

708

1416.02

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 12" SWMG ANSI 150#

6

541

3250.44

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 10" SWMG ANSI 150#

6

428

2568.12

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 8" SWMG ANSI 150#

12

351

4222.32

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 4" SWMG ANSI 150#

2

201

403.34

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3" SWMG ANSI 150#

2

163

326.1

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 2" SWMG ANSI 150#

2

106

212.4

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1 1/2" SWMG ANSI 150#

12

85

1029.84

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1" SWMG ANSI 150#

12

65

785.16

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3/4" SWMG ANSI 150#

24

85

2057.04

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 30" SWMG ANSI 600#

6

3064

18389.16

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 24" SWMG ANSI 600#

6

2165

12995.34

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 18" SWMG ANSI 600#

6

1266

7601.52

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 16" SWMG ANSI 600#

2

1131

2263.5

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 14" SWMG ANSI 600#

12

1132

13587.48

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 12" SWMG ANSI 600#

4

1132

4531.28

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 6" SWMG ANSI 600#

12

647

7775.28

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 4" SWMG ANSI 600#

6

432

2593.86

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3" SWMG ANSI 600#

6

325

1950.24

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 2" SWMG ANSI 600#

12

216

2600.28

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1" SWMG ANSI 600#

6

115

695.1

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 3/4"" SWMG ANSI 600#

12

90

1087.68

... More
Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: 1/2"" SWMG ANSI 600#

12

65

785.16

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4", WNRF FLANGE, ANSI - 150# (B 16.5)

2

1126

2252.78

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3", WNRF FLANGE, ANSI - 150# (B 16.5)

2

767

1534.02

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", WNRF FLANGE, ANSI - 150# (B 16.5)

2

532

1064.16

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 11/2", WNRF FLANGE, ANSI - 150# (B 16.5)

4

424

1699.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", WNRF FLANGE, ANSI - 150# (B 16.5)

2

313

626.48

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3/4", WNRF FLANGE, ANSI - 150# (B 16.5)

4

263

1055.56

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1/2", WNRF FLANGE, ANSI - 150# (B 16.5)

4

209

836.72

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", WNRF FLANGE, ANSI - 600# (B 16.5)

4

863

3454.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", WNRF FLANGE, ANSI - 600# (B 16.5)

2

667

1334.5

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3/4", WNRF FLANGE, ANSI - 600# (B 16.5)

4

576

2304.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1/2", WNRF FLANGE, ANSI - 600# (B 16.5)

6

384

2304.24

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 18", BLRF FLANGE, ANSI - 600# (B 16.5)

1

66693

66693.13

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 14", BLRF FLANGE, ANSI - 600# (B 16.5)

1

29443

29443.88

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", BLRF FLANGE, ANSI - 600# (B 16.5)

1

709

709.09

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", BLRF FLANGE, ANSI - 600# (B 16.5)

1

308

308.95

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 16", BLRF FLANGE, ANSI - 150# (B 16.5)

1

12091

12091.01

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 12", BLRF FLANGE, ANSI - 150# (B 16.5)

2

7122

14244.02

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 10", BLRF FLANGE, ANSI - 150# (B 16.5)

2

4046

8092.84

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 8", BLRF FLANGE, ANSI - 150# (B 16.5)

2

3131

6262.72

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4", BLRF FLANGE, ANSI - 150# (B 16.5)

2

1088

2177.68

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3", BLRF FLANGE, ANSI - 150# (B 16.5)

2

715

1431.04

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2", BLRF FLANGE, ANSI - 150# (B 16.5)

2

396

793.82

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1 1/2", BLRF FLANGE, ANSI - 150# (B 16.5)

2

305

610.38

... More
Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1", BLRF FLANGE, ANSI - 150# (B 16.5)

2

213

426.94

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 4.500" ODx 0.237" WT (Sch.STD) ASTM A 106 Gr B bare Pipe

12

3135

37627.92

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 3.500" ODx 0.216" WT (Sch.STD) ASTM A 106 Gr B

12

2222

26672.88

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 2.375" ODx 0.218" WT (Sch.XS) ASTM A 106 Gr B bare pipe

12

1522

18266.76

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document. 1.315" ODx 0.179"WT (Sch.XS) ASTM A 106 Gr B Bare pipe

12

691

8303.04

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" 600# Equal Tee

2

1527

3055.2

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 600# Equal Tee

4

798

3192.48

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 600# Equal Tee

2

425

851.76

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 600# Equal Tee

2

401

802.42

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" 150# Equal Tee

2

964

1928.8

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 150# Equal Tee

2

579

1158.56

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 150# Equal Tee

2

333

667.24

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 150# Equal Tee

2

257

514.92

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" ANSI 600# 90 deg LR Bends

2

2092

4185.88

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 600# 90 deg LR Bends

4

1453

5814.32

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 600# 90 deg LR Bends

4

555

2222.72

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 600# 90 deg LR Bends

50

337

16895.5

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 4" ANSI 150# 90 deg LR Bends

2

949

1898.76

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 3" ANSI 150# 90 deg LR Bends

2

505

1010.52

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 2" ANSI 150# 90 deg LR Bends

2

203

407.64

... More
Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 1" ANSI 150# 90 deg LR Bends

50

104

5202.5

... More
Supply and Delivery of 18" OD x 0.438" WT, API5L PIPE, UPTO X52, BARE

10

12573

125736.8

... More
Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document: 1" X 1500# W/W or F/F, A/G, HOV, API 602 GATE VALVE

2

16164

32328.52

... More
Corrosion Coupon: Supply of TOR Fitting Complete With Plug & Cap and Full bore Threaded Ball Valve: TOR fitting complete with Caps, Plugs, O-Rings, Nipple & 2" 600# full bore threaded ball valve.

1

22163

22163.1

... More
Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document: 1" x 800# W/W or F/F, A/G, HOV, API 602 GATE VALVE

6

8620

51723.9

... More
Supply and delivery of BS 5351/ISO 17292 Ball valve for use in process piping at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document. 1" x 800# Ball valve HOV W/ W or F/F BS 5351

1

13643

13643.28

... More
Supply and delivery of BALL VALVE API6D HOV F/F or W/W A/G TRU BL F SF 2 150 for use in process piping at respective stations as per Station wise Break up of material supply and as per technical specifications

1

24809

24809.58

... More
Supply and delivery of BALL VALVE API6D,HOV,F/F, A/G, TRU,BOL,FIR,2,600 for use in process piping at respective stations as per Stat ion wise Break up of material supply and as per technical specifications

1

37326

37326.48

... More
Process Tube, Material: Stainless Steel, Manufacturing process: Seamless, Mat Specification:ASTM A269, Grade: TP316, end Finish: Pla in End, 1/2 IN OD, 0.065 IN Thickness, 3000 MM Length.

6

327

1963.8

... More
Fitting, Bushing, 25.4 MM X 12.7 MM NPT(F), Material: Carbon Steel, Manufacturing Process: Forged, Material Specification: A105, End Finish: Threaded, conform to ANSI 16.11 

5

100

504.75

... More
Excess Flow Valve Nominal Working Pressure: 6000psi/421 Kg/Sqcm, End Connection: 1/2" NPTM for 1/2" OD SS tube, MATERIAL SS 316

5

1812

9064.95

... More
Male Connector, 12.7 MM MNPTX 12.7 MM OD Tube, Material: SS316, 211 kg/sqcm (3000 psi) complete with ferrules & nuts as per ANSI B.2 .1.

5

163

816.35

... More
Female Connector, 12.7 MM FNPT X 12.7 MM OD Tube, 211 kg/sqcm (3000 lbs) complete with ferrules and nut as per ANSI B.2.1, Material : SS316

5

185

928.55

... More
Union Tee, 3X12.7 MM OD Tube, 211 kg/sqcm (3000 lbs) as per ANSI 16.11, Material : SS316.

5

398

1994.1

... More
Tube End Cap ( Sq Head), 12.7 MM OD Tube, 211 kg/sqcm (3000 lbs) as per ANSI B 16.11, Material : SS316.

5

99

497.45

... More
2 Way Valve Manifold 2 x 12.7 MM FNPT, Material : SS316 with blanking plug for each port.

5

1318

6592.35

... More
Hex Nipple, 12.7 MM MNPT X 12.7 MM MNPT X 80 MM Long, Material : SS316

5

81

405

... More
PLUG (SQ. Head) 12.7 MM (½”) NPTM, 211 Kg/Cm2 (3000 PSI) as per ANSI B 16.11, Material-SS 316

5

63

318.75

... More
NEEDLE VALVE 12.7 MM (½" FNPT) X 12.7 MM (½" FNPT), MATERIAL-SS316

5

741

3708.5

... More
90 Deg ELBOW 12.7 MM (½”) FNPT X 12.7 MM (½”) FNPT, 211 KG/CM2 (3000 PSI) as per ANSI B 16.11. MATERIAL - SS 316

5

429

2148.95

... More
Supply of ANTI CORROSIVE SPRAY,WD-40 (Material code: 6492751004)

48

201

9654.72

... More
WATER WORKS CLEANER 5205 of STANVAC make (6499921024)

12

1436

17243.4

... More
COTTON WASTE,YARN, 25 KGS (Material code: 9380580604) Note: EA means KG

250

41

10455

... More
COLOUR COTTON WASTE (Material code: 9380581454) Note: EA means KG

1200

55

66000

... More
"Calibration of Thermal Relief valves of different sizes and rating: 1. Closing of upstream and downstream valves (as applicable) of TRV, removal of TRV from the pressure piping and providing blind alo ng with gasket (already installed) in the piping on both upstream & downstream sides. 2. Dismantling all the parts of Thermal relief valve completely. 3. Cleaning all its critical parts by diesel, carrying out any lapping, machining of seat or any other part if required. Applying gr ease over metallic part wherever required. 4. Providing new gasket/O-ring if found damaged. 5. Assembly of TRV. 6. Pressure setting of the TRV at the desired pressure by loading in the test bench and calibration. 7. Removing blind from the station piping (from where the said TRV was removed) and fitment of the calibrated TRV. 8. Painting (synthetic enamel) of the TRV and providing metal tag with cable tie mentioning TRV tag no., serial no., calibration dat e, due date of calibration, pressure set point. 9. Putting back TRV back to operation by opening upstream and downstream valves. 10. Certification of TRV from PESO approved agency . 11. Submission of Calibration reports alonwith necessary documents from PESO approved agency Location of maintenance, testing and calibration: Within ERPL Haldia Premises"

90

1782

160404.3

... More
"Testing,Calibration and certification of Pressure Safety Valves of different size and rating 1.Dismantling all the parts of PSV completely. 2.Cleaning all its critical parts by diesel, carrying out any lapping, machining of seat or any other part if required. Applying gre ase over metallic part wherever required. 3.Providing new gasket/O-ring if found damaged 4.Location of maintenance, testing and calibration: Within ERPL Haldia Premises. 5.Painting (synthetic enamel) of the PSV and providing metal tag with cable tie mentioning PSV tag no., serial no., calibration date , due date of calibration, pressure set point. 6.Certification from PESO approved agency 7. Submission of Calibration reports alonwith necessary documents from PESO approved agency Location of maintenance, testing and calibration: Within ERPL Haldia Premises"

8

1517

12140.16

... More
"Testing,Calibration and certification of Surge Relief Valves 1.Dismantling all the parts of SRV completely. 2.Cleaning all its critical parts by diesel, carrying out any lapping, machining of seat or any other part if required. Applying gre ase over metallic part wherever required. 3.Providing new gasket/O-ring if found damaged 4.Location of maintenance, testing and calibration: Within ERPL Haldia Premises. 5.Painting (synthetic enamel) of the SRV and providing metal tag with cable tie mentioning SRV tag no., serial no., calibration date , due date of calibration, pressure set point. 6.Certification from PESO approved agency 7. Submission of Calibration reports alonwith necessary documents from PESO approved agency Location of maintenance, testing and calibration: Within ERPL Haldia Premises"

2

4082

8165.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.