Howrah Improvement Trust Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Howrah Improvement Trust - HIT Tender

Works
Eprocure
Opening Date30 Apr 2018
Closing Date7 May 2018
Tender Amount₹ 77,21,164 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour for taking out old soling edging including removing debris. Single flat soling.

1200

-

991

... More
Labour for laying singal brick flat soiling including ramming and dressing bed to proper level and filling joints with powdered earth .

720

-

41

... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.

480

-

374

... More
Ordinary cement concrete(mix1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any as per relevent IS code. Pakur varity. a) In Ground floor

202

-

6707.48

... More
Brickwork with 1st. class bricks in cement mortar (4:1). (i) In foundation and plinth.

90

-

5970

... More
Plaster (to wall, floor, ceiling, etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary. (Excluding cost of chipping over concrete surface.) (A) With 1:4 cement mortar -15 mm thick . (a) In Ground Floor

500

-

171

... More
Neat cement punning about 1.5mm thick in wall, dado, window sills, floor, drain etc.

500

-

38

... More
Ordinary cement concrete(mix1:2:4) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any as per relevent IS code. Pakur varity. a) In Ground floor

30

-

5965.46

... More
Providing construction joint at concrete road with 12mm. Thick Thermokal Board in position including cutting to requsite size and shape all complete as per direction of Engineer-in-charge.

50

-

114.83

... More
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. 125 mm diameter

5600

-

145

... More
Coal tarring on wooden surfaces including cost of materials. Single coat.

2200

-

22

... More
Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 125 mm diameter

3250

-

92

... More
Darma Mat works placed, fitted and fixed withframe work or behind pilling works and tied with 22 SWG,GI wire as per direction including cost, carriage and supplying all materials to site complete. Double darma

160

-

185.6

... More
Supplying empty Cement bags in good condition.

3748

-

330

... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.

3750

-

350

... More
Labour for fitting and fixing 10 cm to 13 cm diameter Eucalyptus-ballah as ties and runners including necessary nails, bolts and nuts.

280

-

20.6

... More
Removal of surplus spoils/rubbish from work site, loading, unloading and carriage with truck to Municipal dumping yards

35

-

168

... More
125mm. Thick brick work with 1st. Class bricks in cement morter 1:4.In gr. Floor.

154

-

772



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.