Summary
Replacement/repair Of Damaged Transformers And Electricity Lines
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UPCL9_40273_1Bid Award Id
ViewTender No
78/2021-22/EDD(A)Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 25 KVA New
1
-
3900
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 16 KVA New
3
-
3900
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 65 Km Small materials
14.04
-
450
Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 23 (bottomPortion hot Dip)
2
-
750
Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 21 (bottomPortion hot Dip)
3
-
750
Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 10 (bottomPortion hot Dip)
20
-
650
Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km 11/0.4 KV 25 KVA New (Upto 1 to 3 Km)
1
-
4300
Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km 11/0.4 KV 16 KVA New (upto 1 to 3 Km)
3
-
3200
Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km Small materials (upto 1 to 3 Km)
14.04
-
650
Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor Single Pole SP 10
19
-
900
Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor Single Pole SP 21
6
-
1000
Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor Single Pole SP 23
2
-
1000
Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor Double Pole Sp 23
4
-
1800
Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor 11 KV ACSR weasel
1.95
-
3800
Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor LT 3 PH 4 wire Weasel / AB cable
0.78
-
3200
Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor LT 1 PH 2 Wire Weasel / AB Cable
4.27
-
1500
Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor 11/0.4 KV 25 KVA New
1
-
1800
Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor 11/0.4 KV 16 KVA New
3
-
1500
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 23 pole
9.18
-
250
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 pole
6.12
-
250
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 10 pole
28.08
-
250
Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr
6.48
-
250
Erection of Double Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23.
5
-
1500
Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23.
2
-
600
Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21
8
-
550
Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-10
39
-
550
Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 23/21 Pole
3.82
-
4800
Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc.
59
-
564
Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 10 Pole
7.02
-
4800
Fixing, tightening and nozzaling of stay with pole as per RESPO
15
-
500
Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3 CuM
1.62
-
4800
Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete
100
-
20
Looping Chooping and cutting of tree which fallen on line
5
-
1100
Laying, Resagging & Restringing of L11 KV Line with Weasel conductor complete including fixing of all accessories including binding and jumperingas per RESPO (1 Ph or 3 Ph)
1.95
-
15500
Laying, Resagging & Restringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing LT 3 PH 4 wire Weasel / AB cable
0.78
-
15500
Laying, Resagging & Restringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing LT 1 PH 2 Wire Weasel / AB Cable
4.27
-
7700
Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 11/0.4 KV 25 KVA New
1
-
2000
Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 11/0.4 KV 16 KVA New
3
-
1600
Head load cartage of following materials from pit site to Dump store ava. Lead distance 3 Km 11/0.4 KV 25 KVA New (Upto 1 to 3 Km)
1
-
4300
Head load cartage of following materials from pit site to Dump store ava. Lead distance 3 Km 11/0.4 KV 16 KVA New (upto 1 to 3 Km)
3
-
3200
Head load cartage of following materials from pit site to Dump store ava. Lead distance 3 KmSmall Material (upto 1 to 3 Km)
0.49
-
650
Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 25 KVA New
1
-
3900
Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 16 KVA New
3
-
3900
Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 65 Km Small materials
0.49
-
450