Uttarakhand Jal Sansthan Tender

View complete overview of Uttarakhand UJS Tender

Uttarakhand Jal Sansthan - UJS Tender

Works
Eprocure
Opening Date6 May 2024
Closing DateCancelled
Tender Amount₹ 48,84,682 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1 :1.5:3 (1 cement: 1.5 coarse sand(zone-111) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).

7.4

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-5000 or more.

470.28

-

-

... More
Strengthening structural elements with Glass fiber Reinforced polymer wrapping system comprise of uni-directional glass fiber, Grinding/ molding concrete substrate, cleaning it with wire brush removing oil, laitance if present, rounding sharp edges to min 25 mm radius etc. complete. Profiling: Applying compatible primer on prepared substrate, Filling the holes and uneven surface with thixotropic putty etc. Complete sheet (900 GSM) and compatible saturate, by wet layup system including,

35.18

-

-

... More
Strengthening structural elements with Carbon fiber Reinforced polymer wrapping system comprise of uni-directional glass fiber, Cementitiois grouting, Grinding/ molding concrete substrate, cleaning it with wire brush removing oil, laitance if present, rounding sharp edges to min 25 mm radius etc. complete. Profiling: Applying compatible primer on prepared substrate, Filling the holes and uneven surface with thixotropic putty etc. Complete sheet (230 GSM) and compatible saturate, by wet layup system including,

531.56

-

-

... More
Providing, mixing and applying polymer modified cement mortar (immediately after the application of the cement based polymer modified bonding slurry coats as per specifications) in layers 6 to 10 mm thick inducing troweling with wooden tools etc. complete as per specifications and directions of Engineer-in-Charge. For payment purpose, pre-measurement of thickness shall be done just after the surface preparation is complete including all materials, labour, tools, and plants as approved by Engineer-in-charge etc. complete. With cement sand mortar 1:3 (1 cement : 3 graded coarse sand) with tape Crete of approved brand only, 12% by weight of cement (75mm size cube crushing strength at the end of 28 days to be not less than 30 N/mm2 Upto 25mm thickness.

566.74

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1900

-

-

... More
Providing and fixing bolts including nuts and washers complete.

60

-

-

... More
Scaffolding work for external wrapping, plastering and panting work used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other manmade structures.

369

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.