Uttarakhand Agricultural Produce Marketing Board Tender
View complete overview of Uttarakhand UKAPMB Tender
Uttarakhand Agricultural Produce Marketing Board - UKAPMB Tender
Eprocure
Opening Date18 Dec 2019
Closing Date30 Dec 2019
Tender Amount₹ 41,25,335
Costs
EMD
₹ 84,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UAPMB_21704_1Bid Award Id
ViewTender No
eNivida/898/2019-20Tender Authority
Uttarakhand Agricultural Produce Marketing Board ViewPurchaser Address
-Website
http://https://www.ukapmb.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.10.6
22.5
-
2452.75
... More
Providing and fixing ball bearing for rolling shutters 10.7
6
-
401.68
... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and including water thinnable priming coat with cement primer 13.41.1
35.64
-
99.23
... More
Providing and fixing hard drawn steel wire fabric of size 75 x25 mm mesh or other suitable size wire mesh to be fixed & firmly anchored to the concrete surface by means of "L" shaped mild steel shear key welded with existing reinforcement including the cost of materials, labour, tool & plants as approved by engineer-in-charge. 26.40
35.64
-
637.09
... More
Painting Steel work with Deluxe Multi Surface Paint togive an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture 13.48.3
299.28
-
89.75
... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manualmeans over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil 2-6-1
71.93
-
133.38
... More
Cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate SOR No 1-4-1-8
21.05
-
4742.36
... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto Raft foundation 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) SOR No 1-5-1-2
11.44
-
6582.06
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights Foundations, footings, bases of columns, etc. for mass concrete 5.9.1
23.88
-
205.39
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) 1-5-2-2
3.97
-
7567.4
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Reinforcement for R.C.C. Work Using Mild Steel and Medium /Tensile Steel Bars 1-5-22-1
29.04
-
5856.27
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights Columns, Pillars, Piers, Abutments, Posts and Struts 5.9.6
82.8
-
495.45
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights Lintels, beams, plinth beams, girders, bressumers and cantilevers 5.9.5
90
-
363.13
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). 5.3
20.7
-
7826.86
... More
Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) SOR No 1-6-1-1
26.37
-
5263.55
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements