Uttarakhand Agricultural Produce Marketing Board Tender
View complete overview of Uttarakhand UKAPMB Tender
Uttarakhand Agricultural Produce Marketing Board - UKAPMB Tender
Eprocure
Opening Date25 Dec 2021
Closing Date3 Jan 2022
Tender Amount₹ 68,94,000
Costs
EMD
₹ 1,38,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UAPMB_40896_1Bid Award Id
ViewTender No
e-nivida -626/2021Tender Authority
Uttarakhand Agricultural Produce Marketing Board ViewPurchaser Address
-Website
http://https://www.ukapmb.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). 5.3
39.57
-
10251.99
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) 5.2.2
39.99
-
9771.3
... More
Centring and shuttering including strutting,ropping etc. andremoval of form for for foundations, footings, bases of columns, etc. for mass concrete. 40037 1-5-9-1 page 15
103.68
-
299.09
... More
Centring and shuttering including strutting,ropping etc. andremoval of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers 40041 1-5-9-5 paage 15
113.05
-
579.65
... More
Centring and shuttering including strutting,ropping etc. andremoval of form for Columns, Pillars, Piers, Abutments, Posts and Struts. 1-5-9-6
695.52
-
770.39
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) 6.1.2
260.89
-
6465.32
... More
Brick work with F.P.S. bricks of class designation 75 insuperstructure above plinthlevel upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement: 6 coarse sand) 40110 1-6-4-2 page 22
137.75
-
7969.97
... More
Reinforcement for R.C.C. work including straightening, cutting,bending, placingin position and binding all complete. UsingThermo-Mechanically Treated bars of grade Fe-500D or more 1-5-22-6
106.74
-
8767.5
... More
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) 13.1.2
775.2
-
266.96
... More
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement: 6 fine sand) 13.2.2
775.2
-
307.49
... More
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) 13.44.1
1550.4
-
95.81
... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In mud mortar 15.7.1
5.38
-
528.15
... More
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): From brick work in cement mortar 15.8.3
1001.05
-
5.12
... More
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed ape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately) 16.53
295
-
305.34
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 10.2
723.6
-
106.84