Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Uttarakhand PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date15 Jun 2019
Closing Date16 Jul 2019
Tender Amount₹ 89,19,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For Retaining wall / Breast wall

136

-

-

... More
Random Rubble stone masonary laid in 1:5 :- Random Rubble stone masonry for structures laid in 1:5 cement & sand mortar by locally available approved stone and sand from approved quarry including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for cross drainage structures, retaining walls, breast walls & other similar structures etc. as directed by Engineer-in-charge.

-

-

-

... More
For Retaining wall / Breast wall /Toe wall

140

-

-

... More
Providing & laying filter media as Hand packed stone filling in the back of retaining wall, abutments, wingwalls etc. by locally available approved stone including of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-charge.

-

-

-

... More
For Retaining wall

78

-

-

... More
Providing and fixing of C.C edge stones 12cm *12cm*60cm size precast in M15 cement concrete with 4 nos. 8 mm dia HYSD vertical bars and 3 nos 6mm dia MS bar stirrups as per approved drawing including two coat white washing on valley side of formation as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.

430

-

-

... More
Construction of parapet as per standard drawing including supply of all material, labour T&P etc. complete as per direction of engineer in charge

-

-

-

... More
Providing concrete for plain/reinforced concrete M10 in open foundations Nominal mix 1:3.6 complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

84.66

-

-

... More
Random Rubble stone masonary laid in 1:5:- Random Rubble stone masonry for structures laid in 1:5 cement & sand mortar by locally available approved stone and sand from approved quarry including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for cross drainage structures, retaining walls, breast walls & other similar structures etc. as directed by Engineer-in-charge.

181.13

-

-

... More
Providing concrete for plain concrete in substructure complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 20 (Nominal mix 1:2:4 )

7.88

-

-

... More
Plastering with cement mortar (1:4), 15 mm thick on stone work in substructure as per technical specification Clauses 613.4 & 1204.

1029

-

-

... More
White washing of parapet walls of CD work and tree truncks :-White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915

1344

-

-

... More
Excavation for Structures :- Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MORD specification.

-

-

-

... More
For KC drain .

55.65

-

-

... More
Random Rubble stone masonary laid in 1:5:- Random Rubble stone masonry for structures laid in 1:5 cement & sand mortar by locally available approved stone and sand from approved quarry including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for cross drainage structures, retaining walls, breast walls & other similar structures etc. as directed by Engineer-in-charge.

-

-

-

... More
For KC drain .

10.5

-

-

... More
Plastering with cement mortar (1:4), 15mm thick on stone masonry in substructure.

-

-

-

... More
For KC drain .

134.4

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 1000 mm dia

-

-

-

... More
For Hume pipe culvert

15

-

-

... More
Excavation for Structures :- Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MORD specification.

-

-

-

... More
For Hume pipe culvert

180.68

-

-

... More
Providing concrete for plain/reinforced concrete M10 in open foundations Nominal mix 1:3.6 complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

-

-

-

... More
For Hume pipe culvert

4.4

-

-

... More
Random Rubble stone masonary laid in 1:5:- Random Rubble stone masonry for structures laid in 1:5 cement & sand mortar by locally available approved stone and sand from approved quarry including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for cross drainage structures, retaining walls, breast walls & other similar structures etc. as directed by Engineer-in-charge.

-

-

-

... More
For Hume pipe culvert

50.52

-

-

... More
Random Rubble stone masonry for structures laid dry by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-charge.

-

-

-

... More
For Hume pipe culvert

22.16

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material

-

-

-

... More
For Hume pipe culvert

63.4

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

11.26

-

-

... More
Construction of embankment with material obtained from roadway cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (For making super elevation and patri filling)

2179

-

-

... More
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications)

441

-

-

... More
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method :- Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.Using naturally occuring gravel

744

-

-

... More
WBM Grading 2 :- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the equired density Grading 2 as per Technical Specification Clause 405. By Mechanical Means

406

-

-

... More
WBM Grading 3 :- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means

406

-

-

... More
Prime Coat (Low Porosity) Providing and applying primer coat with bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

5408

-

-

... More
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503

5408

-

-

... More
Providing laying and rolling of cold mixed open-graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade Catonic Bitumen Emulsion (Tailor made binder) to required line, grade and levelto serve as wearing cousre on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type B as per MORD Specification clause 506.2 (Emulsion used for cold mix shall be supplied from authorized supplier of IPR's owner i.e CRRI, New Delhi)

5408

-

-

... More
Providing and laying seal coat by Bituminous Emulsion (Tailor made binder) as binder for sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using Type B as per Technical Specification Clause 508 (Emulsion used for cold mix shall be supplied from authorized supplier of IPR's owner i.e. CRRI, New Delhi)

5408

-

-

... More
Providing fixing of Title Information/ Citizen Information Board and Maintenance Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and written as per the MoRD specification and direction given by Engineer in charge. Clause 1701 and Annexure 1700.1

3

-

-

... More
Semi Reflective Traffic Signs Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.21 600 mm equilateral triangle

7

-

-

... More
Seeding and Mulching :-Detail of Providing and Fixing Empty Maxphalt Drum For Bio Engineering

65

-

-

... More
Seeding and Mulching :- Preparation of seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer, multching material, applying bituminous emulsion at the rate of 0.23 l per sqm and laying and fixing jute netting, including watering for 3 months all as per Clause 310.

275

-

-

... More
Construction of inauguration pillar with fixing of inauguration stone including supply of al material, labour, T&P etc. for proper completion of work or as directed by engineer-in-charge.

1

-

-

... More
Construction of reference pillars with RR 1:6 stone masonary and Plastered with 1:4 Mortar, (totally under ground) of length 200mm, width 200mm and height 300mm) as per Fig. 1600.1 (b) and Technical Specification Clause 1602.1 of MORD specifications.

7

-

-

... More
Maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907

1750

-

-

... More
MAINTENANCE ACTIVITIES

-

-

-

... More
Emergency Maintenance Major Slip Clearance in all Type of Soil ,rock and boulders including cost of all material , machine,T&p etc required for proper compeletion of work as per mord specification of work 1611

-

-

-

... More
Ist year

105

-

-

... More
IInd year

94.5

-

-

... More
III rd year

85.05

-

-

... More
IV th year

76.55

-

-

... More
V th year

68.9

-

-

... More
Deploying Hydraulic excavator of 0.90cum bucket for clearence of Major slip in all type of soil rock and boulders including its operator ,pol, and all other charges required for proper compeletion of work

-

-

-

... More
Ist year

3.5

-

-

... More
IInd year

3.15

-

-

... More
III rd year

2.84

-

-

... More
IV th year

2.55

-

-

... More
V th year

2.3

-

-

... More
Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and techniacal specification 1301

-

-

-

... More
Ist year

3.5

-

-

... More
IInd year

3.15

-

-

... More
III rd year

2.84

-

-

... More
IV th year

2.55

-

-

... More
V th year

2.3

-

-

... More
Coolie Walling including supply of all material, labour, T&P,royalty etc. required for proper completion of the work,as directed by Engineer-in-charge and as per PWD specifications 8.90 (For opening communication only)

-

-

-

... More
Ist year

5.25

-

-

... More
IInd year

4.73

-

-

... More
III rd year

4.25

-

-

... More
IV th year

3.83

-

-

... More
V th year

3.44

-

-

... More
Routine Maintenance Under PBMC:- Maintenance under PBMC for 1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907. 3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 . 4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. 7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912. 8} Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year). 9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.

-

-

-

... More
Ist Year

1.75

-

-

... More
IInd year

1.75

-

-

... More
IIIrd Year

1.75

-

-

... More
IVth Year

1.75

-

-

... More
V th year

1.75

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.