Military Engineer Services Tender
View complete overview of Uttarakhand MES Tender
Military Engineer Services - MES Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date14 Oct 2024
Closing Date9 Nov 2024
Tender Amount₹ 13,00,000
Costs
EMD
₹ 26,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Comprehensive Maint Of External Water Supply System Including
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_679350_1Bid Award Id
ViewTender No
8826/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Removing excavated materials/ soils, not exceeding 50mtrs and depositing where directed at a level not exceeding 1.50mtrs, complete all as specified and directed.
17
-
-
Taking up or down from existing locations, old/unserviceable galvanised steel tubing of 80mm bore pipe, and connections, any type, including jointing materials and cleaning for re-fixing or removal to store, complete all as specified and as directed.
48
-
-
Taking up or down from existing locations, old/unserviceable galvanised steel tubing of 50mm bore pipe, and connections, any type, including jointing materials and cleaning for re-fixing or removal to store, complete all as specified and as directed.
126
-
-
Taking up or down from existing locations, old/unserviceable galvanised steel tubing of 40mm bore pipe, and connections, any type, including jointing materials and cleaning for re-fixing or removal to store, complete all as specified and as directed.
138
-
-
Taking up or down from existing locations, old/unserviceable galvanised steel tubing of 25mm bore pipe, and connections, any type, including jointing materials and cleaning for re-fixing or removal to store, complete all as specified and as directed.
120
-
-
Taking up or down from existing locations, old/unserviceable galvanised steel tubing of 20mm bore pipe, and connections, any type, including jointing materials and cleaning for re-fixing or removal to store, complete all as specified and as directed.
126
-
-
Taking up or down from existing locations, old/unserviceable galvanised steel tubing of 15mm bore pipe, and connections, any type, including jointing materials and cleaning for re-fixing or removal to store, complete all as specified and as directed.
96
-
-
Tubes, 'medium grade' galvanised, 80mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
42
-
-
Tubes, 'medium grade' galvanised, 50mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
78
-
-
Tubes, 'medium grade' galvanised, 40mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
84
-
-
Tubes, 'medium grade' galvanised, 25mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
78
-
-
Tubes, 'medium grade' galvanised, 20mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
72
-
-
Tubes, 'medium grade' galvanised, 15mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
48
-
-
Tubes, 'medium grade' galvanised, 50mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, fixing on walls or on any open surfaces with mild steel flat iron clamps, screws, complete all as specified and as directed.
30
-
-
Tubes, 'medium grade' galvanised, 40mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, fixing on walls or on any open surfaces with mild steel flat iron clamps, screws, complete all as specified and as directed.
36
-
-
Tubes, 'medium grade' galvanised, 25mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, fixing on walls or on any open surfaces with mild steel flat iron clamps, screws, complete all as specified and as directed.
30
-
-
Tubes, 'medium grade' galvanised, 20mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, fixing on walls or on any open surfaces with mild steel flat iron clamps, screws, complete all as specified and as directed.
36
-
-
Tubes, 'medium grade' galvanised, 15mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, fixing on walls or on any open surfaces with mild steel flat iron clamps, screws, complete all as specified and as directed.
30
-
-
Tubes, 'any grade' galvanised, 80mm bore, ISI marked including all new fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
Note: Old serviceable tube/ pipe shall be used as retrieved from dismantling under serial item No- 1.04 here-in-above.
6
-
-
Tubes, 'any grade' galvanised, 50mm bore, ISI marked including all new fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
Note: Old serviceable tube/ pipe shall be used as retrieved from dismantling under serial item No- 1.05 here-in-above.
18
-
-
Tubes, 'any grade' galvanised, 40mm bore, ISI marked including all new fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
Note: Old serviceable tube/ pipe shall be used as retrieved from dismantling under serial item No- 1.06 here-in-above.
18
-
-
Tubes, 'any grade' galvanised, 25mm bore, ISI marked including all new fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
Note: Old serviceable tube/ pipe shall be used as retrieved from dismantling under serial item No- 1.07 here-in-above.
12
-
-
Tubes, 'any grade' galvanised, 20mm bore, ISI marked including all new fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
Note: Old serviceable tube/ pipe shall be used as retrieved from dismantling under serial item No- 1.08 here-in-above.
18
-
-
Tubes, 'any grade' galvanised, 15mm bore, ISI marked including all new fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches or under floors, complete all as specified and as directed.
Note: Old serviceable tube/ pipe shall be used as retrieved from dismantling under serial item No- 1.09 here-in-above.
18
-
-
Replacement old un-serviceable gate valve with new gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed for 15mm bore pipe line, complete all as specified and as directed.
20
-
-
Replacement old un-serviceable gate valve with new gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed for 20mm bore pipe line, complete all as specified and as directed.
20
-
-
Replacement old un-serviceable gate valve with new gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed for 25mm bore pipe line, complete all as specified and as directed.
15
-
-
Replacement old un-serviceable gate valve with new gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed for 40mm bore pipe line, complete all as specified and as directed.
8
-
-
Replacement old un-serviceable gate valve with new gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed for 50mm bore pipe line, complete all as specified and as directed.
5
-
-
Replacement old un-serviceable gate valve with new gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed for 80mm bore pipe line, complete all as specified and as directed.
2
-
-
Repairing of leakage of water supply line by replacing old defective union with new galvanised iron union of 80mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
5
-
-
Repairing of leakage of water supply line by replacing old defective union with new galvanised iron union of 50mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective union with new galvanised iron union of 40mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
12
-
-
Repairing of leakage of water supply line by replacing old defective union with new galvanised iron union of 25mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
15
-
-
Repairing of leakage of water supply line by replacing old defective union with new galvanised iron union of 20mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
15
-
-
Repairing of leakage of water supply line by replacing old defective union with new galvanised iron union of 15mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
15
-
-
Repairing of leakage of water supply line by replacing old defective nipple with new galvanised iron nipple of 80mm bore pipe, 100mm long, made with medium grade pipe, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
4
-
-
Repairing of leakage of water supply line by replacing old defective nipple with new galvanised iron nipple of 50mm bore pipe, 100mm long, made with medium grade pipe, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
5
-
-
Repairing of leakage of water supply line by replacing old defective nipple with new galvanised iron nipple of 40mm bore pipe, 100mm long, made with medium grade pipe, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective nipple with new galvanised iron nipple of 25mm bore pipe, 100mm long, made with medium grade pipe, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective nipple with new galvanised iron nipple of 20mm bore pipe, 100mm long, made with medium grade pipe, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective nipple with new galvanised iron nipple of 15mm bore pipe, 100mm long, made with medium grade pipe, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective socket with new galvanised iron socket of 80mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
5
-
-
Repairing of leakage of water supply line by replacing old defective socket with new galvanised iron socket of 50mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
5
-
-
Repairing of leakage of water supply line by replacing old defective socket with new galvanised iron socket of 40mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective socket with new galvanised iron socket of 25mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
20
-
-
Repairing of leakage of water supply line by replacing old defective socket with new galvanised iron socket of 20mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
20
-
-
Repairing of leakage of water supply line by replacing old defective socket with new galvanised iron socket of 15mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
20
-
-
Repairing of leakage of water supply line by replacing old defective elbow with new galvanised iron elbow of 15mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
20
-
-
Repairing of leakage of water supply line by replacing old defective elbow with new galvanised iron elbow of 20mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
20
-
-
Repairing of leakage of water supply line by replacing old defective elbow with new galvanised iron elbow of 25mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
12
-
-
Repairing of leakage of water supply line by replacing old defective elbow with new galvanised iron elbow of 40mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
12
-
-
Repairing of leakage of water supply line by replacing old defective elbow with new galvanised iron elbow of 50mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective elbow with new galvanised iron elbow of 80m bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
4
-
-
Repairing of leakage of water supply line by replacing old defective tee with new galvanised iron tee (all side equal) of 15mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective tee with new galvanised iron tee (all side equal) of 20mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective tee with new galvanised iron tee (all side equal) of 25mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective tee with new galvanised iron tee (all side equal) of 40mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective tee with new galvanised iron tee (all side equal) of 50mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
5
-
-
Repairing of leakage of water supply line by replacing old defective reducer socket with new galvanised iron reducer socket, size 20mm/15mm, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective reducer socket with new galvanised iron reducer socket, size 25mm/15mm, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective reducer socket with newgalvanised iron reducer socket, size 40mm/15mm, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
12
-
-
Repairing of leakage of water supply line by replacing old defective reducer socket with new galvanised iron reducer socket, size 50mm/15mm, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective reducer socket with new galvanised iron reducer socket, size 25mm/20mm, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
12
-
-
Repairing of leakage of water supply line by replacing old defective reducer socket with new galvanised iron reducer socket, size 40mm/20mm, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective reducer socket with new galvanised iron reducer socket, size 50mm/20mm, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
12
-
-
Repairing of leakage of water supply line by replacing old defective reducer socket with new galvanised iron reducer socket, size 40mm/25mm, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
10
-
-
Repairing of leakage of water supply line by replacing old defective reducer socket with new galvanised iron reducer socket, size 50mm/25mm, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
8
-
-
Replacement of old damaged plug with new mild steel plug, suitable for 15mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
8
-
-
Replacement of old damaged plug with new mild steel plug, suitable for 20mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
8
-
-
Replacement of old damaged plug with new mild steel plug, suitable for 25mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
8
-
-
Replacement of old damaged plug with new mild steel plug, suitable for 40mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
5
-
-
Replacement of old damaged plug with new mild steel plug, suitable for 50mm bore pipe, ISI marked, by cutting, threading the joint at site including taking out existing water supply line by excavation, returning filling and necessary earth work as required at site, complete all as specified and as directed.
5
-
-
Attending complaints for repairing of broken pipes/ leakages, line bursting or cracks in water lines mains of any size including sunday and all holidays, by removal of pipe pieces of varying lengths through gas/ manual cutting and providing new pipe length of existing specifications short/ piece/ nipple as required at site, making leak proof by filling water leaking proof materials, complete all as specified and as directed.
10
-
-
Ball valves high pressure of PTMT with epoxy coated Aluminium rod and high-density plastic ball screwed for iron pipe and fixed for 25mm bore pipe, fixing in repairs, complete all as specified and as directed.
15
-
-
Ball valves high pressure of PTMT with epoxy coated Aluminium rod and high-density plastic ball screwed for iron pipe and fixed for 20mm bore pipe, fixing in repairs, complete all as specified and as directed.
20
-
-
Ball valves high pressure of PTMT with epoxy coated Aluminium rod and high-density plastic ball screwed for iron pipe and fixed for 15mm bore pipe, fixing in repairs, complete all as specified and as directed.
10
-
-
Replacement of dosing system for disinfectant of water with new dosing system, power-free automatic erosion feed enabled water sanitizer/ conditioning treatment station with proportional dosing arrangement consisting of following: 1. Receptacle with following attachments: (a) Water Inlet Regulator (b) Overflow Vent (c) Water Outlet Regulator with non-return valve (for standalone gravity flow) (d) Water Outlet Regulator (for offline automated gravity flow) (e) Drain valve (f) Fluid Level controller (g) Sludge Level Guage (h) Station Base Assembly with Station Base Buffer (j) Station Hood Assembly with multi-cavity arrangement (11) (k) Station Holding Assembly (l) Material of construction: Non-metallic thermoplastic (m) Maximum Temperature: 45°C (n) Capacity: 100 litres (o) Shape: Cylindrical 2. Custom cover with following attachments: (a) Refill Cavity Lids (11) (b) In-built Level Switch & Processor (c) ½ inch Processor Outlet & Processor Inlet connections (d) Flexible Connecting Duct (e) Material of construction: Non-metallic (f) Maximum Temperature: 45°C (g) Shape: Circular (h) Cavity Lids storage bin
1
-
-
Construction of valve pit of size 1200x1200x1200mm (internal dimensions) in repairs, with 100mm thick plain cement concrete 1:3:6 type C-1 (using 20mm graded crushed stone aggregates) in bedding, precast cement concrete block walling using 1:3:6, type C-1 (using 20mm graded crushed stone aggregates), 200mm thick in cement mortar 1:4, rendering in 15mm thick cement mortar 1:4 on internal and external exposed surfaces including white washing with two coats of lime wash, along with 40x40x6mm mild steel angle iron frame welded with 3.0mm thick mild steel cover with locking arrangement, mild steel hinges, handles and suitable locking arrangements, fastening arrangements, nuts, bolts and washers, and including painting with two coats of black colour synthetic enamel paint to mild steel surfaces of angle iron framed work and mild steel sheet, complete all as specified and as directed.
2
-
-
Description all as serial ietm No- 1.81 here-in-before but for valve pit of size 900x900x900mm (internal dimensions).
3
-
-
Description all as serial ietm No- 1.81 here-in-before but for valve pit of size 600x600x600mm (internal dimensions).
3
-
-
Description all as serial ietm No- 1.81 here-in-before but for valve pit of size 450x450x450mm (internal dimensions).
4
-
-
Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water and rendering 15mm thick on fair faces of on brick work or concrete surfaces, in cement mortar 1:4, rendering is to be finished even and smooth (without using extra cement), complete all as specified and as directed.
95
-
-
Preparation of new plastered or unplastered surfaces of walls and applying three coats of white washing, complete all as specified and as directed.
95
-
-
Cleaning away/ cutting of all grass vegetation, saplings, shrubs, brushwood, undergrowth, roots, and trees not exceeding 30cm girth (measured one metre above ground level) around the overhead water tanks, underground/ semi-underground sumps, water supply mains, pump houses and removing rubbish outside the periphery of cantonmant area, complete all as specified and as directed.
Note: Cost of all required tools and plants shall be deemed included in the quoted rates.
18000
-
-
Preparation of old/ decorated plastered or unplastered surfaces of walls by removing existing treatment and applying two coats of white washing, complete all as specified and as directed.
100
-
-
Preparation of old painted steel surfaces of corrugated steel roofing or any mild steel surfaces, over 10cm width or girth including and applying one coat of synthetic enamel paint, complete all as specified and as directed.
50
-
-
Plain cement concrete M-7.50(1:4:8), type D-2 (using 40mm graded crushed stone aggregate), as mass concrete in foundation, complete all as specified and as directed.
2
-
-
Plain cement concrete M-15(1:2:4), type B-1, (using 20mm graded crushed stone aggregate), nominal mix, as in cills, steps; plinth courses, string courses, lacing courses, copings, kneelers, apex stones, bed plates, including necessary form work, complete all as specified and as directed
2
-
-
Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water and rendering 15mm thick on stone masonry surfaces or surface other than fair face of brick-work or on one side of lathing in cemen mortar 1:4, rendering is to be finished even and smooth (without using extra cement), complete all as specified and as directed.
2
-
-
Mild steel, plain, black sheet 3.0mm thick, in steel gates and similar work, cut to size, fixing with mild steel angle iron frame of 50x50x6mm, fixing in repairs with mild steel hinges to the outer frame of old sluice vale pit/ filtration tank holes along with suitable locking arrangement, mild steel flat iron handles of 25x6mm in each gate, and including all necessary cutting, drilling and welding with two coats of synthetic enamel paint over one coat of red oxide primer, complete al as directed and as specified.
Note: Colour/ tint of paint shell be decide by GE.
15
-
-
Galvanised iron flange of not less that 10mm wall thickness, suitable to existing water supply lines of 80mm bore pipe, fixing in repairs with spot welding or nut, bolt, washers, complete al as directed and as specified.
6
-
-
Cleaning internal surfaces of underground/ semi underground water storage tank, capacity 10,000 Litres, scraping with mild steel wire brush and removing all the silt, dirt algae etc from the wall and floor, washing the cleaned surface with bleaching powder solution thoroughly and internal surfaces shall be flushed with solution of fresh water and 2% potassium paramagnet before applying two coat of lime wash on internal surface, marking the labels with black synthetic enamel paint and writing the particulars such as capacity of tank, date/ due date of tank cleaning in existing letter sizes, on table size not less than 60cmx40cm, painted with black and white synthetic enamel paint on external surface, also applying two coats of cement paint on external surfaces of water storage tank, complete all as specified and directed by Engineer-In-Charge.
6
-
-
Descriptions all as per serial item No- 1.95 here-in-before, but for underground/ semi-underground water storage tank of 25000 Liters capacity.
2
-
-
Descriptions all as per serial item No- 1.95 here-in-before, but for underground/ semi-underground water storage tank of 50000 Liters capacity.
3
-
-
Replacement of old unserviceable filter media in the filter bed from gravity water filtration plant, capacity 10000 litres with new filter media in layered, duly cleaned, washed with 5% concentrated solution of sodium hydro-oxide (NaOH) including cleaning the tank by metallic wire brush and removing all silt, dirt and algae from the surfaces and including 80mm bore, medium grade, 6.0mtrs long strainer pipe with drop hole and connecting accessories for supply of water into the chamber. The size and quantity of filter media as following:
(a) Filter gravels (pebbles): 0.70 Cum
(b) Filter gravels (pebbles), size 3/4 to 4.15 inches: 0.45 Cum
(c) Filter gravels (pebbles), size 1/2 to 3/4 inches: 0.15 Cum
(d) Filter gravels (pebbles), size 1/4 to 3/8 inches: 0.15 Cum
(e) Filter gravels (pebbles), size 1/8 to 1/4 inches: 0.25 Cum
(f) Fine sand (Anthracite): 2.50 Cum
Note: Cost of transportation and replacement of filter media shall be deemed included in the quoted rates.
1
-
-
Chlorine tablets contained in plastic cylindrical sealed disposable sanitizer refill for disinfection of drinking water with arrangement for controlled release of disinfectant in water, suitable for operation through recommended dosing system and conforming to following.
(i) Replacement indication: visual and weight variation
(ii) Water contact orifice design: Sealed when dry, exposed upon immersion
(iii) Operation type: Non contact, non inhalatory
(iv) Cylinder dia: 2.5 inches ± 0.5 inches
(v) Cylinder height: Minimum 10.0 inches ± 0.5 inches.
2
-
-
Amount of Schedule of credit of for Rs 44773.00 shall be deducted from quoted amount.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements