Military Engineer Services Tender

View complete overview of Uttarakhand MES Tender

Military Engineer Services - MES Tender

Works
Energy, Oil and Gas
Solar Installation and Products
Electrical and Electronics
Eprocure
Opening Date5 Oct 2024
Closing Date16 Nov 2024
Tender Amount₹ 44,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(l) Cost of pump (tullu pump) electrically operated with 0.50 HP single phase AC supply motor and having head not less than 20 mtr , necessary cable required for connection in PVC conduit heavy duty from existing nearest point to the motor starter and starter to motor, GI pipe 15 mm bore (medium duty ) and PVC flexible bralded pipe with set including all accessories from the existing service tank installed at the roof top of the building for cleaning of system. (m) Any kind of damage to the existing roof of any type during installation of Solar power system shall be redone /made good as per existing . Cost of the same shall be included in the unit rate quoted. Nothing extra shall be admissible on this account (n) Bi-directional net energy meter showing power generated by the solar power system and total power used by the user deemed to be included in the rate quoted. NOTE:-Design of solar plant shall be got vetted from any MNRE approved organisation/ IIT/NIT/Govt Research Institute before execution.Authorized testing laboratories /centre:PV modules must qualify (enclose test reports/certificate from IEC/NABL accredited laboratory) as per relevant IEC standard.

-

-

-

... More
Qualification certificate from IEC/NABL accredited laboratory as per relevant standard for any of the higher wattage regular module should be accompanied with the STC report/certificate. For details of Test Labs refer Ministry of New And Renewable Energy website. The report submitted should not be older than 5 years. Minimum technical requirements/standards for SPV system to be deployed as per Ministry of New and Renewable Energy are mandatorily to be complied with in the design including following. For other details website /publications of MNRE may be referred. (a) Each PV modules must use a RF identification tag (RFID), which must contain the following information (i) Name of the manufacturer of PV module (ii)Name of manufacturer of solar cells (iii) Month & year of manufacturer with country of origin (iv) I-V curve for the module (v)Peak wattage, Im,Vm and FF for the module (vi) Unique serial No and Model No of the module (vii)Date & year of obtaining IEC PV module qualification certificate (viii) Peak power rating of the modules should not be less than 545 Watt mono perc half cut cell type. RFID shall be mandatorily place inside the module laminate.

-

-

-

... More
(ix) PV modules must qualify as per relevant IEC standard. Additionally the performance of PV modules at STC conditions must be tested and approved by one of the IEC/NABL accredited testing laboratories incl solar energy centre.For details of test labs refer MNRE website. SPV modules should be essentially indigenously manufactured(manufactured in India).The make of SPV shall be any from the latest updated list of ALMM circulated by MNRE subject to fulfilment of all technical specification as brought out in tender documents. (x) The BOS (Balance of System) items/components of the SPV plants deployed under this project must confirm to latest edition of IEC or equivalent BIS standards/MNRE specification. The test certificates/ reports for the BOS items/components can be from any of the NABL/IEC accredited testing laboratories or MNRE approved test centres. (xi) All materials used shall have a proven history of reliability and stable operation in external application. It shall perform satisfactorily in relative humidity upto 85%+5% with temperatures between -40°C to +85°C and shall withstand gust upto 150 Km/Hr on the surface of the panel. (xii)The bidder shall carefully design & accommodate requisite numbers of the modules in the available area (refer topographical survey) to achieve the rated power in his bid.

-

-

-

... More
(xiii) Shadow analysis report of the site has to be submitted along with topographical survey . The same shall be incorporated in design of solar plant in PV syst (xiv) After completion the contractor must engage a third party MNRE approved consultant for final testing and third party inspection of executed work. The consultant shall certify that the work has been executed in accordance with vetted and approved design. The contractor shall propose a panel of three consultants for this purpose. The final decision on the consultant to be engaged shall be taken by accepting officer. All cost and charges for engagement of consultant shall be borne by the contractor. (b) The department reserves the right of making independent inquiry with MNRE,SECI & NISE as regard appraisal of the proposed make and in case of any adverse observation/ reservation on the proposed make from any one , that make shall not be allowed. (c ) All the defects needs to be addressed within 48 hours of registering the defects during defect liability period. (d) PV modules shall have product warranty of 10 years after completion of work.The contractor must submit 10 years warranty for PV modules from OEM .Contractor shall furnish approved security i.e. FDR from approved bank for an amount equal to 2.5 percent of work done for the period of 10 years

-

-

-

... More
M&L for earthing complete with galvanised steel, earth plate electrode 600x600mm x 6mm thick burried directly in ground verticaly (earth pit not less than 2.25 mtrs below ground level ) with top edge of the plate not less than 1.5 mtrs below normal ground level connected to galvanised strip 32x6mm as earth lead by means of bolts, nuts, check nuts and washers of galvanised iron/steel all as shown in electrical plate No 3 on page 497 of MES schedule 2009 part - I connected to main switch board/main DBs/earthing test point including all necessary excavation and earth work in hard/dense soil common salt and charcoal dust mixed and packed 150mm thick all round the GI earth plate, watering pipe 20mm dia GI medium grade. GI sheet 0.63 mm thick funnel, wire gauge, 50mm thick RCC cover in PCC 1:2:4 type B1 duly reinforced with MS round bars 6mm dia @ 150c/c both ways and pit/chamber in PCC 1:3:6 type C1 with suitable lifting handle to cover, GI protection pipe 15mm dia light grade up to 7.5mtr from electrode GI pipe to be fixed with complete all as specified and directed. Note :- (i) Earth lead beyond 7.5 mtr from electrode to earth terminal point/main switch & GI pipe light grade 15mm dia for protection against mechanical damage to lead shall be measured separately. (ii) On testing after completion if desired earth resistance is not obtained, the earthing will be redone at no extra cost.

2

-

-

... More
Supply and fixing CO2 fire Extinguisher 4.50 Kg capacity complete in all respect IS : 15683 marked complete all as specified and directed.

4

-

-

... More
Supply and fixing GI strip of size 32 X 6 mm thick earth continuity down conductor complete with all fitting complete all as specified and directed.

85

-

-

... More
Material and labour for fabrication of monkey Caging bar by MS angle iron of suitable size for protection of panels complete all as specified and directed by Engr in charge.

8.5

-

-

... More
Material and Labour for Expanded metal, cut to length,bent to shape required and tying with and including annealed mild steel wire not less than 0.9mm dia or fixing with galvanised steel staples supplied and fixed complete to wood or steel members (N exc 4 kg)

1050

-

-

... More
Supply and lay cable XLPE insulated screened PVC bedded, galavanized steel strip of wire armoured ,electric power cable 1100 V with standard aluminium conductor of size 70 Sqmm 3.5 core including cable glands and lugs complete all as specified and directed .

85

-

-

... More
Excavation in trenches n.exc 1.5m wide and n.exc 1.5m depth for foundation, etc or for shafts, wells, cesspits, manholes, pier holes, etc.exc 10Sqm mtrs on plan and n.exc 1.5m in depth and gettinng out (Hard/Dense soil)

5.4

-

-

... More
Returning and filling in including spreading, levelling watering and well ramming in layers not exc 25cm of soil as specified.

3.12

-

-

... More
Removing excavated material not exceeding 50 Mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point all as directed.

2.28

-

-

... More
Supply and lay burnt bricks sub class ‘B’ old size laid dry in trenches across the cable protection all as specified and as directed

150

-

-

... More
Supply and & filling sand cushioing for cable protection in trenchh, 8cm below the cable and 15cm above the cable including levelling and gently punning to the full width of the cable trench all as specified and directed by Engineer-in-Charge

1.6

-

-

... More
Supply and lay Pipes galvanized, light grade”,of size 50 mm dia including fittings complete for cable protection.

25

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.