Military Engineer Services Tender

View complete overview of Uttarakhand MES Tender

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date26 Oct 2024
Closing Date18 Nov 2024
Tender Amount₹ 20,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Comprehensive maintenance including renewal/replacement of defective parts of electrically operated 1x1Feright Elevator = 01 Feright Elevator (OTIS Make) each of 2000 Kgs capacity with selective controls catering for four floors including ground floor, installed at MMG Building Tehnical 'A' Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under Ser item 10 to 37 belowshall to be deemed included in quoted rates complete, all as specified and directed. Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks. (ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender. (iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge.

11

-

-

... More
Comprehensive maintenance including renewal/replacement of defective parts of electrically operated 1xFeright Elevator = 01 Feright Elevator (OTIS Make) each of 2000 Kgs capacity with selective controls catering for three floors including ground floor, installed at Photonic Building in Tehnical 'A' Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed. Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks. (ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender. (iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge.

11

-

-

... More
Comprehensive maintenance including renewal/replacement of defective parts of electrically operated1x1Feright Elevator = 01 Feright Elevator (OTIS Make) each of 2000 Kgs capacity with selective controls catering for two floors including ground floor, installed at Optics Building Technical 'B' area at IRDE Dehradun complete all as specified and directed, including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed. Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks. (ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender. (iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge.

11

-

-

... More
Comprehensive maintenance including renewal/replacement of defective parts of electrically operated1x1=1lifts with manufacturing year 2018, (Make- TKE) of 13 passengers capacity with selective controls catering for six floors including ground floor, installed at EOL Building Technical area 'B' at IRDE Dehradun complete all as specified and directed, including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed. Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks. (ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender. (iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge.

11

-

-

... More
Comprehensive maintenance including renewal/replacement of defective parts of electrically operated1x1= 01 lifts with Manufacturing year 2002 (ECE Make) each of 08 passengers capacity with selective controls catering for six floors including ground floor, installed at E-5 Bilding Residential Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed.

11

-

-

... More
Comprehensive maintenance including renewal/replacement of defective parts of electrically operated 1x3=3lifts with manufacturing year 2002,(ECE make) each of 13 passengers capacity with selective controls catering for six floors including ground floor, installed at D-2,D-3 & C-15 Residential area at IRDE Dehradun complete all as specified and directed,including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed.

11

-

-

... More
Supply only Power Contactor 10 to 25 Amps rating (make- LT/ TC/Schneider) suitable for lift complete all as specified and directed.

4

-

-

... More
Supply only relay cards suitable for (OTIS make) lift complete all as specified and directed

4

-

-

... More
Supply only in replacement of full length Infra Red Door sensor (make - TVS/Max) complete all as specified and directed

2

-

-

... More
Supply only main controller card for OTIS make lift complete all as specified and directed

2

-

-

... More
Supply only SMPS power supply (make- Delta/MAX) for OTIS make lift complete all as specified and directed

3

-

-

... More
Supply only floor indicator 7 segment 12/24 Volt DC (make- MAX or equivalent) for OTIS make lift complete all as specified and directed

4

-

-

... More
Supply only limit switch (make- TVS/MAX ) for OTIS make lift complete all as specified and directed

8

-

-

... More
Supply only Reed switch (make- TVS/MAX ) for OTIS make lift complete all as specified and directed

4

-

-

... More
Supply only stop switch (make- TVS/MAX ) for OTIS make lift complete all as specified and directed

5

-

-

... More
Supply only Emergency alarm for OTISmake lift complete all as specified and directed

4

-

-

... More
Supply only travelling cable12 core (0.50 sqmm) for OTIS make lift complete all as specified and directed

50

-

-

... More
Supply only main rope(13mm) make Usha martin for OTIS make lift complete all as specified and directed

50

-

-

... More
Supply only door drive (make- Yaskawa/Fuji) for OTIS make lift complete all as specified and directed

2

-

-

... More
Supply & fixing of electronic drive in elevator control panel (Main VVVF drive) relevant for 15 HP electric motor complete with key board built in or detachable for proper control & command inputs and proper analysis of errors & trouble shooting by an engineer for proper functioning of OTIS/Kone /Thaison/ECE/Jhonson Make lift complete all as sprcified and directed.

3

-

-

... More
Supply only ARD with battery suitable for OTIS/Kone /Thaison/ECE/Jhonson lift complete all as specified and directed.

4

-

-

... More
Supply only ARD instruction plate assembly with nut bolt and hardware complete all as specified and directed.

4

-

-

... More
Supply only door shoe suitable for OTIS make lift complete all as specified and directed

4

-

-

... More
Supply only door safety lock for OTIS make lift complete all as specified and directed

4

-

-

... More
Supply only thimble for OTIS/ECE/KONE/Thaison make lift complete all as specified and directed

4

-

-

... More
Supply only landing operating panel (LOP) for OTIS make lift complete all as specified and directed

2

-

-

... More
Supply only car operating panel (COP) for OTIS make lift complete all as specified and directed

3

-

-

... More
Supply only serial card for OTIS make lift complete all as specified and directed

2

-

-

... More
Supply only door lock roller for OTIS make lift complete all as specified and directed

4

-

-

... More
Supply only Lift fan suitable for OTIS make lift complete all as specified and directed

3

-

-

... More
Supply only Alaram suitable for OTIS make lift complete all as specified and directed

4

-

-

... More
Supply only battery 7.5 AH suitable for OTIS make lift complete all as specified and directed

5

-

-

... More
Supply only break linner suitable for OTIS make lift complete all as specified and directed

2

-

-

... More
Supply only door lock suiable for OTIS make lift complete all as specified and directed

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.