Indian Oil Corporation Limited Tender
View complete overview of Uttarakhand IOCL Tender
Indian Oil Corporation Limited - IOCL Tender
Electrical Cables And Wires
Electrical and Electronics
Eprocure
Opening Date29 Apr 2022
Closing Date27 May 2022
Tender Amount₹ 31,51,886
Costs
EMD
₹ 39,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_NRPNP_150550_2Bid Award Id
ViewTender No
PNP22005Tender Authority
Indian Oil Corporation Limited ViewPurchaser Address
-Website
http://https://www.iocl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Special_Instructions_to_the_Bidders_20220221v1a.pdf
BOQ Items
... More
Conducting Mututal Interference Survey among the new and existing pipelines / facilities(foreign) by taking PSP survey of all the pipelines as per approved procedure to determine level of interference at different places along the pipeline and at point of crossing in common ROW including identifying points and providing the data/ record in graphical form and carrying out all necessary work for mitigating the interference observed among the pipelines , including retesting the same to ensure efficacy of the remedial measures undertaken.The contractor shall submit a full final report with detailed PSP readings at all TLPs along with graphs in six sets.The item should be complete in all respect including survey, work for mitigating the interference and post mitigating survey as per specifications/directions of site engineer / Engineer-in-Charge.
110
-
8467.93
... More
Carrying out bell examination by manually making bell holes by excavation around the pipe and exposing bottom pipe, Inspection of coating visually and through holiday detector, patch repair of coating and backfilling as per direction of EIC.
11
-
19554.79
... More
Grp B KRNPL Najibabad UP
-
-
-
... More
Conducting Close Interval ON/OFF Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Site Engineer / Engineer-in-Charge.
23
-
4451.27
... More
Conducting Direct Current Voltage Gradient Survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects as per directions of Site Engineer / Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contractor, who will arrange to repair the defects.
23
-
5175.36
... More
Conducting Mututal Interference Survey among the new and existing pipelines / facilities(foreign) by taking PSP survey of all the pipelines as per approved procedure to determine level of interference at different places along the pipeline and at point of crossing in common ROW including identifying points and providing the data/ record in graphical form and carrying out all necessary work for mitigating the interference observed among the pipelines , including retesting the same to ensure efficacy of the remedial measures undertaken.The contractor shall submit a full final report with detailed PSP readings at all TLPs along with graphs in six sets.The item should be complete in all respect including survey, work for mitigating the interference and post mitigating survey as per specifications/directions of site engineer / Engineer-in-Charge.
23
-
8467.93
... More
Carrying out bell examination by manually making bell holes by excavation around the pipe and exposing bottom pipe, Inspection of coating visually and through holiday detector, patch repair of coating and backfilling as per direction of EIC.
2
-
19554.79
... More
Grp B KRNPL Ambala HRY
-
-
-
... More
Conducting Close Interval ON/OFF Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Site Engineer / Engineer-in-Charge.
35
-
4451.27
... More
Conducting Direct Current Voltage Gradient Survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects as per directions of Site Engineer / Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contractor, who will arrange to repair the defects.
35
-
5175.36
... More
Conducting Mututal Interference Survey among the new and existing pipelines / facilities(foreign) by taking PSP survey of all the pipelines as per approved procedure to determine level of interference at different places along the pipeline and at point of crossing in common ROW including identifying points and providing the data/ record in graphical form and carrying out all necessary work for mitigating the interference observed among the pipelines , including retesting the same to ensure efficacy of the remedial measures undertaken.The contractor shall submit a full final report with detailed PSP readings at all TLPs along with graphs in six sets.The item should be complete in all respect including survey, work for mitigating the interference and post mitigating survey as per specifications/directions of site engineer / Engineer-in-Charge.
35
-
8467.93
... More
Carrying out bell examination by manually making bell holes by excavation around the pipe and exposing bottom pipe, Inspection of coating visually and through holiday detector, patch repair of coating and backfilling as per direction of EIC.
3
-
19554.79
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements