Garhwal Mandal Vikas Nigam Limited Tender

View complete overview of Uttarakhand GMVNL Tender

Garhwal Mandal Vikas Nigam Limited - GMVNL Tender

Works
Eprocure
Opening Date18 Aug 2021
Closing Date6 Sep 2021
Tender Amount₹ 25,23,000 
Notes
Download

Costs

Summary

Construction Of Shahid Jeet Bahadur Memorial Gate

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).

49.74

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.

68.95

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete

54.42

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts

219.11

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers

75.93

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform

24

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) cum

23.53

-

-

... More
Extra for plastering done on moulding, cornices or architraves including neat finish to line and level: In two coats

113.52

-

-

... More
18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge.

287.61

-

-

... More
Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm

425.13

-

-

... More
P/F of moulding with cement mortar as per detail drawing and design and as per direction of E/I

113.52

-

-

... More
Provision of lettering work with Alex Sheet complete in all respect.

21.6

-

-

... More
Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) : Screened through sieve of I.S. designation 20 mm

20

-

-

... More
Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately).

20

-

-

... More
Providing and Displaying Bismarckia Palm 115 to 180 cm ht., well developed 12 and above good color fresh and healthy leaves in 40 cm Cement Pot as per direction of the officer-in-charge.

4

-

-

... More
Providing and stacking of Alpinia Variegated (three in one) having ht. 30 cm and above, with fresh and healthy variegated foliage in 25 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge.

12

-

-

... More
Providing and stacking of Duranta Golden, having ht.15 to 20 cm bushty shape with fresh and healthy leaves in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge.

4000

-

-

... More
Providing and stacking of Ficus benjamina (green) of height 150-165 cm., bushy with healthy branches and lush green foliage in big size HDPE bags as per direction of the officer-in-charge.

4

-

-

... More
Providing and stacking of Fishtail palm of ht. 150-180 cm bottom girth 15- 20 cm well developed in big poly bags of size 25 cm as per direction of the officer-in-charge.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.