Yamuna Expressway Industrial Development Authority Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Yamuna Expressway Industrial Development Authority - YEIDA Tender
Eprocure
Opening Date25 Oct 2021
Closing Date8 Nov 2021
Tender Amount₹ 1,92,75,254
Costs
EMD
₹ 3,86,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_YEIDA_635713_5Bid Award Id
ViewTender No
YEA/GM(PROJECT)/2021/527 DT-11/10/2021Tender Authority
Yamuna Expressway Industrial Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Trees (RSP)
(Upto 4 & upto 3 year slow & fast growing group)
(5688 Nos x 24 mth) = 136512 Nos
136512
-
28
... More
Trees (RSP)
(Upto 4 & upto 3 year slow & fast growing group)
(2005 Nos x 24 mth) = 48120 Nos
48120
-
28
... More
Complete maintenance of Trees in green belt (Out side garden features), jobs like making of basin at regular interval including watering, weeding, pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of Officer-in-charge.
-
-
-
... More
Trees (in green belt)
(Beyond 8 year slow & beyond 6 year fast growing group)
(2425 Nos x 24 mth) = 58200 Nos
58200
-
3.5
... More
Complete maintenance of Shrubs on Road side (RSP) (Out side garden features), jobs like making of basin at regular interval including watering, weeding, pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of Officer-in-charge. Complete maintenance in green belt (out side garden)
-
-
-
... More
Shrubs (on RSP)
(5688 + 2290 + 4967 + 10440) = 23385 Nos
(23385 Nos x 24 mth) = 561240 Nos
561240
-
7
... More
Providing and watering for irrigation water through water tanker of Horticulture features i.e. lawn, trees, shrubs, hedge/edge, ground cover etc. at the site of work. Water tanker having 5000 Ltr. capacity with one labour for watering including cost of water, filling of tanker, watering at site with all leads and lifts as per direction of Officer-in-charge.
-
-
-
... More
Trees (Beyond 8 year slow & beyond 6 year fast growing group)
(4069 Nos x 24 mth) = 97656 Nos
97656
-
3.9
... More
Trees (Upto 4 & upto 3 year slow & fast growing group)
(3831 Nos x 24 mth) = 91944 Nos
91944
-
7.8
... More
Trees (Upto 4 & upto 3 year slow & fast growing group)
(5688 Nos x 24 mth) = 136512 Nos
136512
-
7.8
... More
Trees (Upto 4 & upto 3 year slow & fast growing group)
(2005 Nos x 24 mth) = 48120 Nos
48120
-
7.8
... More
Providing and watering for irrigation water through boring and RH pipe in green belt of Horticulture features i.e. lawn, trees, shrubs, hedge/edge, ground cover etc. at the site of work, including supply of water and RH pipe for watering each plant and complete arrangement of watering with DG Set, boring pump and labour for watering at site with all leads and lifts as per direction of Officer-in-charge.
-
-
-
... More
Trees (in green belt)
(Beyond 8 year slow & beyond 6 year fast growing group)
(2425 Nos x 24 mth) = 58200 Nos
58200
-
3.5
... More
Providing and watering for irrigation water through water tanker of Horticulture features i.e. lawn, trees, shrubs, hedge/edge, ground cover etc. at the site of work. Water tanker having 5000 Ltr. capacity with one labour for watering including cost of water, filling of tanker, watering at site with all leads and lifts as per direction of Officer-in-charge.
-
-
-
... More
(Watering of above three years plants)
(21095 Nos x 24 mth) = 506280 Nos
506280
-
2.6
... More
Providing and watering for irrigation water through boring and RH pipe in green belt of Horticulture features i.e. lawn, trees, shrubs, hedge/edge, ground cover etc. at the site of work, including supply of water and RH pipe for watering each plant and complete arrangement of watering with DG Set, boring pump and labour for watering at site with all leads and lifts as per direction of Officer-in-charge.
-
-
-
... More
(Watering of one year to three years plants)
(2290 Nos x 24 mth) = 54960 Nos
54960
-
1.95
... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 Km. lead complete (Cattle manure measured in stacks will reduced by 8% for payment) (DSR-2018/2.25/P-85)
2386.42
-
230.45
... More
Supply of chlorpyriphos 20% E.C./Lindane 20% E.C. for anti termite treatment of plants @ 2ml./plant and in the interval 1 month up to one year i.e. 12 times in a year hence it comes 0.24ml/plant or 0.024 Ltr./plant (DSR-2018/Code No. - 7022/P-7)
1987.34
-
207
... More
Clearing grass and removal of the rubbish upto a distance of 50m outside the periphery of the area cleared. (Area should be clean each & every point of time) (DSR-2018/2.32/P-101)
-
-
-
... More
(33525.27 x 2 years) = 67050.54 Sqm
67050.54
-
5.5
... More
Clearing jungle including uprooting of weeds rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 mtr. outside the periphery of the area cleared. (Area should be clean each & every point of time) (DSR-2018/2.31/P-101)
-
-
-
... More
(47632.00 x 2 years) = 95264.00 Sqm
95264
-
10.8
... More
Add labour cess @ 1% on all above items
19084410.24
-
0.01
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements