Yamuna Expressway Industrial Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Yamuna Expressway Industrial Development Authority - YEIDA Tender

Works
Eprocure
Opening Date25 Oct 2021
Closing Date8 Nov 2021
Tender Amount₹ 1,92,75,254 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Trees (RSP) (Upto 4 & upto 3 year slow & fast growing group) (5688 Nos x 24 mth) = 136512 Nos

136512

-

28

... More
Trees (RSP) (Upto 4 & upto 3 year slow & fast growing group) (2005 Nos x 24 mth) = 48120 Nos

48120

-

28

... More
Complete maintenance of Trees in green belt (Out side garden features), jobs like making of basin at regular interval including watering, weeding, pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of Officer-in-charge.

-

-

-

... More
Trees (in green belt) (Beyond 8 year slow & beyond 6 year fast growing group) (2425 Nos x 24 mth) = 58200 Nos

58200

-

3.5

... More
Complete maintenance of Shrubs on Road side (RSP) (Out side garden features), jobs like making of basin at regular interval including watering, weeding, pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of Officer-in-charge. Complete maintenance in green belt (out side garden)

-

-

-

... More
Shrubs (on RSP) (5688 + 2290 + 4967 + 10440) = 23385 Nos (23385 Nos x 24 mth) = 561240 Nos

561240

-

7

... More
Providing and watering for irrigation water through water tanker of Horticulture features i.e. lawn, trees, shrubs, hedge/edge, ground cover etc. at the site of work. Water tanker having 5000 Ltr. capacity with one labour for watering including cost of water, filling of tanker, watering at site with all leads and lifts as per direction of Officer-in-charge.

-

-

-

... More
Trees (Beyond 8 year slow & beyond 6 year fast growing group) (4069 Nos x 24 mth) = 97656 Nos

97656

-

3.9

... More
Trees (Upto 4 & upto 3 year slow & fast growing group) (3831 Nos x 24 mth) = 91944 Nos

91944

-

7.8

... More
Trees (Upto 4 & upto 3 year slow & fast growing group) (5688 Nos x 24 mth) = 136512 Nos

136512

-

7.8

... More
Trees (Upto 4 & upto 3 year slow & fast growing group) (2005 Nos x 24 mth) = 48120 Nos

48120

-

7.8

... More
Providing and watering for irrigation water through boring and RH pipe in green belt of Horticulture features i.e. lawn, trees, shrubs, hedge/edge, ground cover etc. at the site of work, including supply of water and RH pipe for watering each plant and complete arrangement of watering with DG Set, boring pump and labour for watering at site with all leads and lifts as per direction of Officer-in-charge.

-

-

-

... More
Trees (in green belt) (Beyond 8 year slow & beyond 6 year fast growing group) (2425 Nos x 24 mth) = 58200 Nos

58200

-

3.5

... More
Providing and watering for irrigation water through water tanker of Horticulture features i.e. lawn, trees, shrubs, hedge/edge, ground cover etc. at the site of work. Water tanker having 5000 Ltr. capacity with one labour for watering including cost of water, filling of tanker, watering at site with all leads and lifts as per direction of Officer-in-charge.

-

-

-

... More
(Watering of above three years plants) (21095 Nos x 24 mth) = 506280 Nos

506280

-

2.6

... More
Providing and watering for irrigation water through boring and RH pipe in green belt of Horticulture features i.e. lawn, trees, shrubs, hedge/edge, ground cover etc. at the site of work, including supply of water and RH pipe for watering each plant and complete arrangement of watering with DG Set, boring pump and labour for watering at site with all leads and lifts as per direction of Officer-in-charge.

-

-

-

... More
(Watering of one year to three years plants) (2290 Nos x 24 mth) = 54960 Nos

54960

-

1.95

... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 Km. lead complete (Cattle manure measured in stacks will reduced by 8% for payment) (DSR-2018/2.25/P-85)

2386.42

-

230.45

... More
Supply of chlorpyriphos 20% E.C./Lindane 20% E.C. for anti termite treatment of plants @ 2ml./plant and in the interval 1 month up to one year i.e. 12 times in a year hence it comes 0.24ml/plant or 0.024 Ltr./plant (DSR-2018/Code No. - 7022/P-7)

1987.34

-

207

... More
Clearing grass and removal of the rubbish upto a distance of 50m outside the periphery of the area cleared. (Area should be clean each & every point of time) (DSR-2018/2.32/P-101)

-

-

-

... More
(33525.27 x 2 years) = 67050.54 Sqm

67050.54

-

5.5

... More
Clearing jungle including uprooting of weeds rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 mtr. outside the periphery of the area cleared. (Area should be clean each & every point of time) (DSR-2018/2.31/P-101)

-

-

-

... More
(47632.00 x 2 years) = 95264.00 Sqm

95264

-

10.8

... More
Add labour cess @ 1% on all above items

19084410.24

-

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.