Uttar Pradesh State Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh State Industrial Development Authority - UPSIDA Tender

Works
Civil Works Roads
Eprocure
Opening Date4 Mar 2021
Closing Date18 Mar 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Consolidation of 45-63 mm gauge hard stone ballast for 10cm (loose) thick inter coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.

641.63

-

-

... More
Consolidation of 22.4-53 mm gauge hard stone ballast for 10cm (loose) thick top coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.

699.31

-

-

... More
Water allowance to be allowed between 15 November to 31st May required for proper completion of the work as per direction of Engineer-in-Charge.

1340.94

-

-

... More
Providing and laying factory made chamfered edge cement concrete paver blocks (80mm thick M-40 grade) in footpath, park & lawns driveway or light & traffic parking etc. of required strength thickness and size/shape, made by table vibratory method using PU mould, laid in required color and pattern over 50mm thick compacted bad of coarse sand, compacting and prober embedding/ laying of interlocking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size & pattern, finishing & sweeping extra sand, all complete as per manufacture specifications & direction of Engineer-in-Charge.

7615.8

-

-

... More
Cement concrete with 4cm. gauge stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, T & P etc. required for proper completion of the work.

197.6

-

-

... More
Cement concrete with 2cm. gauge stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, T & P etc. required for proper completion of the work.

107.92

-

-

... More
Renewing parties 1.5metere wide including dressing, surface filling upto 8cm (3") depth and making namunas, at every 15 metre apart on either side of the road true to parti template with side slopes of 1:2 etc. trenches for taking the earth to be so dug that they from a continuous side drain at boundary.

2718

-

-

... More
Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5meter and lead upto 30m. including filling, watering and ramming of excavated earth into the trenches or into the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches.

935.9

-

-

... More
Same as above item but for 1 extra lead & lift.

6.32

-

-

... More
RCC in 1:1.5:3 in foundation including all material, labour, T & P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

239.3

-

-

... More
M.S. (tor Steel or plain) in Plain work such as R.C.C. work including beding for proper shape including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

283.15

-

-

... More
M-150 Brick work in 1:3 one cement : 3 cement and coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

34

-

-

... More
4cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand & 2cm approved stone grit including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

10

-

-

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of fine sand of 1.25 fineness modulus including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

8.36

-

-

... More
Flush pointing with cement mortar consisting of 1 part cement and 2 part of fine sand of 1.25 fineness modulus including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

16

-

-

... More
Finishing wall with water proof cement paint of approved make on new work with three coats to give an even shade including supply of all materials, labour, and T&P etc. required for proper completion of the work.

8.36

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.