Uttar Pradesh State Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh State Industrial Development Authority - UPSIDA Tender

Works
Eprocure
Opening Date2 Nov 2021
Closing Date11 Nov 2021
Tender Amount₹ 1,92,57,520 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Consolidation of 45-63mm guage stone ballast in 10 cm. (loose) thick levelling coat including opening out stacks, sorting ballast in to different size, spreading ballast making medhies to retain water also including hire & fuel charges of road roller, labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T&P with maintenance of barriers etc., required for proper completion of the work as per direction of Engineer incharge. water for consolidation to be arranged by the contractor himself at his own cost.

428.81

-

-

... More
Consolidation of 22.4-53mm guage stone ballast in 10 cm. (loose) thick top coat including opening out stacks, sorting ballast in to different size, spreading ballast making medhies to retain water also including hire & fuel charges of road roller, labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T&P with maintenance of barriers etc., required for proper completion of the work as per direction of Engineer incharge. water for consolidation to be arranged by the contractor himself at his own cost.

241.94

-

-

... More
Water allowance for consolidation of stone ballast to be allowed on item No.4 & 5 between 15th Nov to 31st May

670.75

-

-

... More
Bitumin Painting over W.B.M. surface (Ist Coat Painting) including supply of 13.2mm guage stone grit and bitumin (VG-10) including cost of stone grit and bitumin including maintenance of road side patries & watering them during operation for proper completion of work as directed by the Engineer in charge & also including road roller charges and its fuel, the wages of fireman and T&P etc required for proper completion of the work as per direction of Engineer in charge, including cost of tack coat (Bitumen shall be used @ 0.60kg/sqm)

2419.44

-

-

... More
Providing and laying of 40mm thick semi-dense buituminous carpet (SDBC) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bitumen ( VG-40) binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired density/ compaction as per MoRTH specification clause No. 508 complete in all respects including cost of tack coat (Bitumen shall be used @ 0.20kg/sqm)

18898.56

-

-

... More
Brick edging on both sides of the road with Ist class bricks 8cm wide & 12cm deep laid with mud mortar including labour, & supply of bricks finished to required level & in proper alignment & also including dressing & ramming the excavated earth as directed by Engineer in charge including supply of all material labour & T&P etc required for proper completion of the work.

770.1

-

-

... More
Earth work in filling in patries with carted earth, filling to be done in 20cm thick layers including ramming dressing the surface to required level and slope for proper completion of the workand as per direction of engineer in charge the earth is to be arranged by the contractor including cartage of earth 3km. from site including supply of all materials labour & T&P etc.required for proper completion of the work.

6760.25

-

-

... More
Providing and laying of 2.5mm thick road marking strips (retroreflective) of specified shade/colour using hot thermoplastic material by fully/semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shose heater driven by experienced operator on road surface including cost of material labour T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc, complete as per direction of Engineer-in-charge and accordance with applicable specifications.

1005.21

-

-

... More
Excavation in foundation in ordinary soil lift upto 1.50m & lead upto 30m including filling watering, ramming of excavated earth into the trenches or into the space between the building & sides of foundation trenches and removal and disposal of surplus earth as directed by the Engineer-in-Charge within the distance of 30m.

217.07

-

-

... More
Scraping of old damaged plaster & racking out joints of brick work in cement mortar to depth of 1cm deep including disposal of refuse as directed by Engineer in charge required for proper completion of the work.

1611.28

-

-

... More
Cement concrete 10:5:1 with 40mm gauge stone ballast, coarse sand and cement in foundation and under floor including supply of all materials, labour & T&P etc. required for proper completion of the work.

25.06

-

-

... More
M-150 class brick work in 1:6 cement & coarse sand mortar in foundation & plinth including supply of all materials, labour & T & P etc. required for proper completion of the work.

216.6

-

-

... More
P/L DPC 40mm thick in 1:1.5:3 with cement concrete consisting of one part of cement 1.5 part of coarse sand & three part of approved 10mm grade stone grit and including water proofing material as directed by the Engineer-in-charge in the proportion as specified by the manufacturer including supply of all materials, labour & T&P etc. required for proper completion of the work.

124.74

-

-

... More
M-150 class brick work in 1:4 cement & coarse sand mortar in super structure including supply of all materials, labour & T & P etc. required for proper completion of the work.

197.98

-

-

... More
Cement cocrete in 1:1.5:3 with cement, coarse sand and 20mm gauge stone grit including supply of all labour, T&P materials etc. required for proper completion of the work.

22.04

-

-

... More
12mm thick plaster in 1:4 cement and course sand mortar in plinth & super structure including supply of all materials, labour & T & P etc. required for proper completion of the work.

5217.31

-

-

... More
Finishing walls with two coats of water proof cement paint of approved make& quality over exposed bick work including supply of all materials, labour T & P etc. required for proper completion of the work.

5217.31

-

-

... More
Struck pointing with the cement mortar consisting of one part of cement and two part of coarse sand on brick work including racking the brick work including racking the joints washing and cleaning and supply of all materials,labour T&P etc. required for proper compltion of the work.

112

-

-

... More
Flush pointing with the cement mortar consisting of one part of cement and two part of coarse sand on brick work including racking the brick work including racking the joints washing and cleaning and supply of all materials,labour T&P etc. required for proper compltion of the work.

121.6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.