Uttar Pradesh Small Industries Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Small Industries Corporation Limited Tender
Eprocure
Opening Date20 Feb 2019
Closing Date26 Feb 2019
Tender Amount₹ 1,40,75,600
Costs
EMD
₹ 1,40,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tender for Mini I.e. Usaini Firozabad Me Interlocking Sadak
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_MSME_315155_1Bid Award Id
ViewTender No
EE1/UPSIC/IE/06Tender Authority
Uttar Pradesh Small Industries Corporation Limited ViewPurchaser Address
-Website
http://http://www.upmsme.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing stone agreegate specific sizes 22.4-53 mm gauge
375.15
1023184
2727.4
Collection of 2.36 mm Dust stone screening material for binding of 45-90,45-63& 22.4-53 mm including cost of material,cortage upto site loading,stacking & complete all rates.
270.11
699557
2589.9
Consolation of above 45-90 mm gauge stone ballast 12 cm loose stone ballast including opening out staks spreading on the road making medhi to retain water and consolidation by road roller and also sprinking of water and binding with screening material including all labour T & P etc complete work.(with roller charges )
450.18
126050
280
Consolation of above 45-63 mm gauge stone ballast 12 cm loose stone ballast including opening out staks spreading on the road making medhi to retain water and consolidation by road roller and also sprinking of water and binding with screening material including all labour T & P etc complete work.(with roller charges )
375.15
105042
280
Consolation of above 22.4-53 mm gauge stone ballast 12 cm loose stone ballast including opening out staks spreading on the road making medhi to retain water and consolidation by road roller and also sprinking of water and binding with screening material including all labour T & P etc complete work.(with roller charges )
375.15
105042
280
Water allowance for above consolidation of 45-90,45-63& 22.4-53 mm
600.24
15006
25
P/Laying of 80mm thick Rubber moulded ZIG-ZAG mechanically compressed interlocking cement concrete pavers block manufactured by high pressure & controlled vibration machine having plan dimension 200X(160+120mm) with minimum 5 mm thick topping of O.P. cement mixed with 25% marble powder. The compressive strength of concrete paver block shall not be less than 30MPa & 4.5 kg/no. including cost of all material, labour T&P etc. required for proper comletion of work as directed by EIC.
6767.1
5724966
846
Drain
-
-
-
Excavation in foundation in ordinary soil including lift up to 1.5mt. and lead up to 30mt. & including filling,watering & ramming of excaveted earth in to the trenches……….complete item.
952.71
128615
135
Concrete with 4cm. Gauge stone ballast , coarse sand and cement in proportion of 10:5:1 in foundation & under floors , including supply of all matrials , labour , T & P. etc required for proper completion of work.
179.78
692153
3850
M-150 Class Brick Work in 1:6cement and coarse sand in foundation and plinth including supply of all matrials , labour ,T &P etc required for proper completion of work.
517.09
2275196
4400
15 mm. thick plaster in 1:3 cement & c-sand ………complete item.
1374.1
240467
175
P.C.C. with c20 mm stone grit in 1:2:4 cement, c-sand & 20mm gauge stone grit …..complete item.
27.32
166378
6090
40 mm. Thick c.c. flooring in 1:2:4 cement, c-sand & 20mm gauge stone grit …..complete item.
608.25
212887
350
Culvert
-
-
-
Excavation in foundation in ordinary soil including lift up to 1.5mt. and lead up to 30mt. & including filling,watering & ramming of excaveted earth in to the trenches……….complete item.
38.81
5239
135
Concrete with 4cm. Gauge stone ballast , fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation & under floors , including supply of all matrials , labour , T & P. etc required for proper completion of work.
5.18
21186
4090
M-150 Class Brick Work in 1:4 cement and coarse sand in foundation and plinth including supply of all matrials , labour ,T &P etc required for proper completion of work.
20.42
90460
4430
15 mm. thick plaster in 1:3 cement & c-sand ………complete item.
47.7
8347
175
R.C.C. in Slab in 1:1.5:3 ratio
15.53
127346
8200
Mild steel in R.C.C.
2439.91
153714
63
40 mm Thick C.C. flooring in 1:2:4 cement, c-sand & 20mm gauge stone grit …..complete item.
20.25
7087
350
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements