If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender
Eprocure
Opening Date6 Dec 2019
Closing Date17 Jul 2019
Tender AmountRefer Documents This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 35,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UPTCL_410818_1Bid Award Id
ViewTender No
SHORT TERM E-TENDER NO. ETC-II/L/85/2019-20Tender Authority
Uttar Pradesh Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://upenergy.in/upptcl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Setting of Stub including all foundation work but excluding the cost of concreting and excavation for 132 KV DC tower – C+5
2
-
-
... More
Setting of Stub including all foundation work but excluding the cost of concreting and excavation for 132 KV DC tower – C+15
2
-
-
... More
Cost of concreting for all types of 132 KV tower foundation including cost of cement, dewatering, shorting and shuttering forming curing but with 1:2:4 mixed concrete.
200
-
-
... More
Erection of super structure of C-type tower and their extension wherever required including all work above ground level excluding hoisting of insulator, hardware & accessories but including fitting of danger, number, phase plate, bird guard fixing & punching of bolts.
43
-
-
... More
Tack welding of all bolts upto the heigt of one section of the tower or 05 M from ground level whichever is higher with three tack & application of zinc rich aluminium paint on the affected surface.
3000
-
-
... More
Laying, Stringing, Tensioning, Clamping, Jointing etc. of ACSR panther conductor including hoisting of insulator, fitting of all necessary hardware and accessories i.e. fitting Armour rods, vibration samper etc. of all three phase of Tower
2
-
-
... More
Charges of installation of OPGW along with hardware & Accessories
-
-
-
... More
Stringing of OPGW by shifting from store to line site and from section tower to section tower, laying, stringing. Tensioning, clamping of OPGW with tower using associated fittings, vibration dampers etc. between section tower (01 job for each section).
3
-
-
... More
Splicing, termination & connection of OPGW in joint boxes at both ends as per existing scheme including installation of 01 No. Joint boxes (as necessary) to be provided by the Department.
4
-
-
... More
Grounding work including earthwork etc for pipe type grounting including cost of coke & salt.
4
-
-
... More
Installation of steel reinforcement bars in RCC foundation including cost of steel, cutting, bending, placing, binding etc.
0.75
-
-
... More
Jumpering work of both ends.
12
-
-
... More
Safe loading, carriage and unloading of tower part from 132 KV S/S Sonik store to site (App. Distance 20 Km)
1
-
-
... More
Destringing of Existing conductor & OPGW after opening/cutting of all associated accessories and hardware material between Loc. No. 115 to 118.
1
-
-
... More
Dismantling of tower between Loc. No. 115 to 118 of Existing old tower through opening/cutting of nuts and bolts and existing earthing strip.
4
-
-
... More
Loading - Unloading and Transportation of all above dismantled material from working site to UPPTCL store Sonik & proper stacking at designated place.