Uttar Pradesh Power Transmission Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Eprocure
Opening Date15 Feb 2020
Closing Date22 Feb 2020
Tender Amount₹ 4,20,58,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Prequalifying requirement and Technical conditions etc. proof of Deposit EMD and Tender Fee through RTGS and NEFT.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(a) 1 - Supply of Galv. towrs parts for 400 KV extension & stub setting template as per drawing & BOM The material includes High Tensile

113.932

-

-

... More
2- Supply of Galv. towrs parts for 400 KV extension & stub setting template as per drawing & BOM The material includes Mild steel

70.404

-

-

... More
(b) Hot dip galvanized, Hexagon Round hexazone head transmission towers, bolts, nuts & washers for above structure as per BOM.

9.7

-

-

... More
(c) Hot dip galvanized, Anti Theft Bolts & nuts for above structure as per BOM.

0.56

-

-

... More
(d) Fabrication, Galvanizeing and Supply of 400 K.V. DC Tower Templet (C+0- 01 No.)

1.925

-

-

... More
(e) Fabrication, Galvanizeing and Supply of 400 K.V. DC Tower Templet (DD+9- 01 No.)

2.391

-

-

... More
2. TOWER ACCESSORIES

-

-

-

... More
(a) Number Plate

4

-

-

... More
(b) Danger Plate

4

-

-

... More
(c) Phase plate set

8

-

-

... More
(d) Pipe type earthing material for towers

8

-

-

... More
(e) 160 KN Polymer insulators for Tension Tower

200

-

-

... More
(f) 120 KN Polymer insulators

8

-

-

... More
3. HARDWARE SUITABLE FOR ACSR MOOSE

-

-

-

... More
(a) Quadreple Tension fitting Suitable for 400 KV Quad Mosse

60

-

-

... More
(b) Pilot Suspension fitting single I

10

-

-

... More
(C) Quadreple special damper

200

-

-

... More
(d) Rigid Spacer for jumper

150

-

-

... More
(e) Mid span conmpression joints

15

-

-

... More
(f) Repir sleeve

12

-

-

... More
4. EARTING ACCESSORIES SUITABLE FOR 7/3.67 SWG EARTHWARE

-

-

-

... More
(a) Tension clamp

15

-

-

... More
(b) Vibration damper

45

-

-

... More
(c) Mid span conmpression joints

10

-

-

... More
(d) Flexible copper bond

18

-

-

... More
Work ( New Tower)

-

-

-

... More
1. Cost of Excavation of 400 KV Tower foundation pits including all earth work, back filling, watering and leveling

-

-

-

... More
(a) Normal soil

1800

-

-

... More
(b) Hard rock

200

-

-

... More
2. Setting of stubs including all foundation work but excluding cost of concreting and Excavation ( Rate per location) for 400 KV D/C towers.

4

-

-

... More
3. Cost of concreing for all types of 400 KV D/C tower FS foundation including cost of cement, coarse, sand, stoe grid, dewatering, shoring and shuttering, forming, curing but excluding const of reinforcement bars.

650

-

-

... More
4. Erection of Superstructure of 400 KV D/C tower and their extensions including all works above ground level and fitting of denger, number & phase plate etc but excluding hoisting of insulators, hardware & accessories.

184.336

-

-

... More
5. Tack welding of all uts and bolts upto the height of one section of tower of 5mtrs from the ground level whichever is higher with three tacks at 10mm/12 mm electrode and application of zink rich paint on the affected surface including cost of all material.

8000

-

-

... More
6. Laying, Stringing, tensioning, clamping, jointing & jumpering etc of ACSR Quad Moose Conductor including hoisting of insulators, fitting of all necessary hardware and accessories.

5

-

-

... More
7. Round the Clock Watch & Ward of the Line / Line Materials during ConstructionWork to avoid Theft of Tower & Gantry Structures, Conductors, Earth Wire, Disc Insulators / Polymer Insulator Strings, Line Hardware Fittings, Tower Accessories etc.(1 Job per Day)

15

-

-

... More
8. Stringing of 01 Nos earthwire 7/09 SWG including fitting of all necessary hardware & accessories i.e. fitting, vibration damper etc including all labour and T&P.

10

-

-

... More
9. Safe Loading, Carriage from 220 KV S/S Banda, Line material & Conductor to work side if required.

1

-

-

... More
10. Earthing of tower including the cost of coke & salt but excluding the cost of earthing material.

8

-

-

... More
11. Installation of Steel Reinforcement bars in R.C.C. foundation including cost of cutting,welding, binding and placing them in foundation pits.

76

-

-

... More
12. De-stringing of Quad ACSR Moose conductor including insulator hardware fittings conductor accessories such as clamp, tension clamp, suspension clamp, vibration dampers, armour rod etc, including rerolling of conductor in drum including cost of all labour and T&P length about approx 03 Km.

4

-

-

... More
13. De-stringing of earthwire 7/9 SWG including insulator hardware fittings conductor accessories such as clamp, tension clamp, suspension clamp, vibration dampers, armour rod etc, including rerolling of conductor in drum including cost of all labour and T&P length about approx 03 Km.

4

-

-

... More
14. Dismantling of old towers and proper stacking at site for shifting the material from site to UPPTCL store including labour and T&P.

78

-

-

... More
15. Transportation of dismantalled tower material, conductor & accessories from site to UPPTCL store and new conductor & earthwire from UPPTCL store to site along with loading & unloading. (distance approx 40 KM)

100

-

-

... More
Rates qouted by the bidders shall be without taxes. Taxes applicable if any to paid extra

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.