Uttar Pradesh Cooperative Sugar Factories Federation Limited Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Uttar Pradesh Cooperative Sugar Factories Federation Limited Tender

Works
Eprocure
Opening Date25 Jan 2024
Closing Date9 Feb 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick work in M-150 bricks Cement and coarse and mortor in 1:3 in foundation including cost of all material all labour T and P etc. Required for proper completion of work.

15

4921

73815

... More
Same as Item No. 1.03 but brick work in super structure 9".

35

5591

195692

... More
12 mm thick Cement Plaster Over Brick work in 1:3 Cement and coarse sand mortor including cost of all material all labour T and P etc. Required for proper completion of work.

213

215

45795

... More
RCC in M-150 1:2:4 cement, approved coarse sand 10-20 grit in slabs and walls etc, including cost of all material all labours T and Petc. Required for proper completion of work

12.5

8340

104250

... More
Mild Steel/Tor Steel work in reinforced. ( Labour Rate Only)

6

1200

7200

... More
Supply and filling of Media, Gravel, course sand including cost of all materials labour T and P etc. Required for proper completion of work.

25

3200

80000

... More
Supply and fixing Pvc pipe in pit including cost of all material labour T and P etc. Required for proper completion of work.

18

500

9000

... More
Supply and fixing of CI man hole cover 900M dia. Including Providing P Gravel fine medium in required grading and size as Per E/I.

3

565

1695

... More
Clearence of site.

3

5000

15000

... More
Drilling Bore and hols 300 mm dia for casing / Stainer by Suitable Mathod Prescribed Is 2800 Part-One Including Collection of Samples from different stratat/borelog sumating stratat Chart. Including higer charge, Equipment tools, In Plant Mechanic, Required for Job As Per direction of EI Up to a gepth of 90 M.

160

450

72000

... More
Supply and Assembling, Lowering and fixing in vertical position in Borewell up Palasticised PVC Heavy Wall Casting Pipe required Daya Confriming to is 12818 Including higer and labour Charge fittings Acessaries, etc. all Complete for all Depth. As Per Direction Of EI. (150 MM Dia)

155

594

92070

... More
Same as Item No. 1.13 But stainer pipe.

155

642

99510

... More
Development of well by OP Unit in Accordance with is 1189, Is 2800 Part-one measuring yield of well though Vnotch with sand Content. Beyond Permissble limit with required up unit Complete work As Per direction E/I.

60

500

30000

... More
Providing and fixing MS Cap. 150 mm

5

182

910

... More
Providing and fixing MS Clamp. 150 mm

5

1205

6025

... More
Providing and fixing MS Plug. 150 mm

5

243

1215

... More
Carriage of Material, Machinary At site of work Vice- Versa.

1

20000

20000

... More
Making arrangement of water for drilling Bore.

3

5000

15000

... More
Supply and filling of Brick bates including cost of all material all labours T and P etc. Required for proper completion of work.

8.9

1000

8900



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.