Uttar Pradesh Cooperative Processing And Cold Storages Federation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Cooperative Processing And Cold Storages Federation Limited - PACSFED Tender
Eprocure
Opening Date24 Jul 2018
Closing Date30 Jul 2018
Tender Amount₹ 13,26,000
Costs
EMD
₹ 67,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_PACSF_232583_2Bid Award Id
ViewTender No
74/pacs/shravasti/2018-19 Dated 23-07-2018Tender Authority
Uttar Pradesh Cooperative Processing And Cold Storages Federation Limited ViewPurchaser Address
-Website
http://http://www.pacsfedmscs.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead upto 50 mt.and lift upto 1.5 m excluding cost of sand
13.55
8109
598.5
... More
Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded brick aggregate 20 mm nominal size) and curing complete, including cost of form-work, in foundation and floors.
22.94
81723
3562.5
... More
Providing and injecting chemical emulsion for pre-constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction surrounding of pipe sand conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313 (Part-II-1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or chordance will be used.The rate of application of chemical emulsion shall be as follows :
148.77
17852
120
... More
R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement :1.5 coarse sand : 3 aggregates) , in raft foundation and footings excluding supply of reinforcement and its bending the same with 24 WG binding wire and necessary centring and shuttering etc and also including supply of all materials labour and tools and plants etc. required for proper completion of the works.
0.71
5716
8052
... More
Same as above item 8.0 but for Plinth Beam
2.82
22706
8052
... More
R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement :1.5 coarse sand : 3 aggregates) , in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 WG binding wire and necessary centring and shuttering etc and also including supply of all materials labour and tools and plants etc. required for proper completion of the works.
0.92
7407
8052
... More
As in item 8.0 above but in lighter Beams having spans upto above six meter
3.7
29792
8052
... More
As in item 8.0 above but in SLAB
19.05
168935
8868
... More
R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement :1. coarse sand : 2 aggregates) , columns excluding supply of rienforcement and its bending the same with 24 WG binding wire and necessary centring and shuttering etc and also including supply of all materials labour and tools and plants etc. required for proper completion of the works.
0.17
1368
8052
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in an over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level.
30.37
167915
5529
... More
First Class brick work in 1:6 cement and coarse sand of mortar in foudation and plinth including and plinth including supply of all materials ,labour and T&P etc. required for proper complete of the work.
25.36
98041
3866
... More
Same as in item no. 15 above but in super-structure including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall one brick thick. 1:6 1 cement and 6 coarse sand mortar
28.99
125091
4315
... More
Same as in item no. 15 but in 1:4 cement and coarse sand mortar in super structure for wall thickness 4.5" thick .
47.97
18420
384
... More
External Plastering 12 mm thick plaster with cement mortar in proportion of 1:6cement & coarse sand of along for external walls
190.29
22073
116
... More
Internal Plastering 12mm thick plaster with cement mortar in proportion of 1:4 cement & coarse sand of along for internal walls
76.76
8904
116
... More
2.5 cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand 2cm graded approved stone laid in panels finished with 3 mm in 5:1 as specifiled over & including 8cm thick base concrete conisting of cement local sand and brick ballast 4cm gauge in the proportion of 1:4:8 and removing any over lapping mortar at the joints of panels if any and giving them a uniform finish including supply of all materials labour and T&P etc. required for proper completion of the work.
47.97
11512
240
... More
Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados,over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including
pointing in white cement mixed with pigment of matching shade complete.
21.71
14198
654
... More
Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS:
15622 (thickness to be specified by the manufacturer), of approved make,
in all colours, shades except burgundy, bottle green, black of any size as
approved by Engineer-in-Charge, in skirting, risers of steps and dados,
over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and
jointing with grey cement slurry @ 3.3kg per sqm, including pointing
in white cement mixed with pigment of matching shade complete.
41.79
29545
707
... More
Mild steel or iron work of small sizes and sections such as holding down bolts, hold fast tierods,gratings etc. ( when not included in an over all rates) wrought to required from including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding and making holes as required completion of work.
46.8
2667
57
... More
Mild steel or iron work of heavy sizes and sections such as grill in door ventilator including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding and making holes as required completion of work.
374.22
21330
57
... More
Providing and fixing Z-section steel window of approved size by welding etc.including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding and making holes as required completion of work.
118.8
6771
57
... More
Providing and fixing of IRON DOOR CHAUKHATS (35*35*5) approved size by welding etc.including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding and making holes as required completion of work.
80.47
4586
57
... More
Supply and fixing of flush doors commercial quality conforming to I.S. 2202 Part I (1483) including fixing of wooden cleats and stoppers and including ixing and adjustment of hinges, bolts,locks, handle, springs and other fittings but excluding their supply and including painting with two coats of Black Japan paint on all iron fitting if necessary. Fitting with necessary screws to be supplied departmentally.
12.08
16308
1350
... More
Fixing of Door, windows/ventilators chaukhats in position.
22
1320
60
... More
Providing & fixing glass panes with putty and glazing clips in steel doors,
windows, clerestory windows, all complete with :
24.63
13792
560
... More
Supply and fixing door and window S.S.fitting of approved make/quality (SQM)
6.83
648
95
... More
WINDOW CHAUKHAT
212.24
15918
75
... More
Finishing walls with Acrylic smmoth exterior paint of required shade : New work (Two or more coats applied @ 1.67 ltr/10 sqm) over
and including priming coat of exterior primer applied @ 2.20kg/
10 sqm
190.29
13891
73
... More
Providing & applying Birla putty of Av. 1. mm thickness over plastered surface to prepare the surface even & smooth complete
402.53
32202
80
... More
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by
water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured."
148.77
55788
375
... More
Supply and fixing of 110(OD) dia PVC ISI marked phenolex or other approved quality complete with rose bend ms clamps 25mmx3.0mm of approved design fixed in wall and including repair of plaster points if damage during fixing of pipe etc complete
35
8295
237
... More
Cost of W/S and Sanitation ( Internal & External )
1
124477
124477
... More
Cost of Internal Electrification
1
94604
94604
... More
Cost of Fire Fighting System
1
53188
53188