UP Jal Nigam Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
UP Jal Nigam - UPJN Tender
Eprocure
Opening Date30 Jul 2020
Closing Date13 Aug 2020
Tender Amount₹ 60,50,325
Costs
EMD
₹ 61,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Retrofitting Bhorra Makboolpur Water Supply Scheme
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UPJNM_496658_1Bid Award Id
ViewTender No
974/M-21/MakboolpurTender Authority
UP Jal Nigam ViewPurchaser Address
-Website
http://http://jn.upsdc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismentalling of following type road sufaces and stacking of useful material including disposal of unserviceable material up to a distance of 50 m supply of all materials, labour, T&P etc complete.
-
-
-
... More
BITUMINOUS ROAD
115.5
-
165.13
... More
C C ROAD
180
-
316.6
... More
B.O.E. ROAD
1811.7
-
89.52
... More
CC PAVMENT ROAD
92.4
-
165.13
... More
Reinstatement of following type road sufaces and stacking of useful material including disposal of unserviceable material up to a distance of 50 m supply of all materials, labour, T&P etc complete.
-
-
-
... More
BITUMINOUS ROAD
115.5
-
1480.93
... More
C C ROAD
180
-
1547.61
... More
B.O.E. ROAD (60% OLD AND 40% NEW)
1811.7
-
301.93
... More
CC PAVMENT ROAD (60% OLD AND 40% NEW)
92.4
-
677.52
... More
Making leckage in existing pipe line for 63mm dia to 250 mm dia PVC/HDPE/AC/DI pipe including excavation desmenling and reinstatement of all type road with supply of all labour T&P Etc.
10.23
-
3838
... More
Repairs of Building Work.
-
-
-
... More
12 mm thick plaster in 1:6 with cement and course sand mortar over brick work minimum thickness not to be less than 10mm including supply of all materials labour and T&P for proper complition of work.
290
-
178.16
... More
Repairs of electric fittings and wiring
2
-
6500
... More
Supply all material/labour painting on new surfaces acrylic smooth exterior paint of required shade finishing till satisfaction of Engineer in Charge.
290
-
275.17
... More
Supply all material/labour painting on old surfaces acrylic smooth exterior paint of required shade finishing till satisfaction of Engineer in Charge.
400
-
145.77
... More
2.5 cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand 2cm (1") graded approved stone laid in panels finished with 3mm(1/8") floating coat of neat cement or cement and marble dust ratio of 5.1 as specified over and including 7.5 cm thick base concrete consisting of cement fine sand of 1.25 fineness modulus and brick ballast 4cm(11/2") gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joint of the panels if any and giving them a uniform finish including supply etc. required for proper completion of the work.
50
-
622.74
... More
Repairing of 25mm thick 1:2:4 Plain cement concrete floor 3mm floating coat of neat cement marble dust in ratio 1:5 as specified over and removing any overlapping or mortar at the joints of panels if any and giving them uniform finish including supply of all materials labour and T&P etc required for proper completion of the work.
2
-
276.2
... More
Painting or warnishing on old iron work after removing of old paint one priming coat and two coat of approved paint.
15
-
146.31
... More
2.5 cm thick 1:2:4 plain cement concrete floor in appron, with cement approved coarse sand 2cm (1") graded approved stone laid in panels finished with 3mm(1/8") floating coat of neat cement or cement and marble dust ratio of 5.1 as specified over and including 7.5 cm thick base concrete consisting of cement fine sand of 1.25 fineness modulus and brick ballast 4cm(11/2") gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joint of the panels if any and giving them a uniform finish including supply etc. required for proper completion of the work.
75
-
622.74
... More
Repair of steps, Ramp of PH , cleaning of water works including cutting of grass smal plants disposal of debries including supply of all material labour T&P etc.
2
-
10000
... More
Repair of BOE Approch Road with old and new bricks.
60
-
301.93
... More
Repair of Bypass chamber
2
-
5000
... More
Construction of drain for outlet of surplus water from bypass chamber as per type design.
20
-
1512.41
... More
OHT REPAIR
-
-
-
... More
Repair of lantern at top dome of OHT
2
-
600
... More
Providing and applying integral crystalline slurry of hydrophlic in nature for water proofing treatrment to the RCC structures like retaing wall of bthe basement, water tanks, Roof slabs podimus reservoires sepage and water treatment plant tunnels/ subway and bridgdeck etc prpared by mixing in the ratio of 5:10 ( 5 parts integral crystalline slurry : 2 part water) for verticle surface and 3:1 ( 3 parts integral crystalline slurry : 1 part water) for horizontal surface and applying the same from internal side with the help of synthetic fiber brush. The material shall meet the requirments as specified in ACI -212-3R-2010 ie by reducing permebility of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 Bar Hydrostatic pressure on intarnal side. The crystalline slurry shall be capaeble of self healing of cracks upto a width of 0.50 mm . The work shall be carried out all complete as per satis faction and direction of the Engineer - incharge. The product performence shall carry gauruntee for 10 yrs against any leakage
-
-
-
... More
Verticle Surface Two coat @ 0.70 Kg / Sqm
96.32
-
547.36
... More
Horzontal Surface Two coat @ 1.10 Kg / Sqm
145.63
-
464.35
... More
Repair of Railing of stair case and balconey using new and old GI Pipe 15 mm dia Class B including supply of all material labour T&P for proper completion of work.
2
-
25000
... More
Repair / Construction of RCC as exsisting shape and size and type Balusters of railing
20
-
345
... More
Repair of Door at stair case of OHT
2
-
2500
... More
2.5 cm thick 1:2:4 plain cement concrete floor in appron, with cement approved coarse sand 2cm (1") graded approved stone laid in panels finished with 3mm(1/8") floating coat of neat cement or cement and marble dust ratio of 5.1 as specified over and including 7.5 cm thick base concrete consisting of cement fine sand of 1.25 fineness modulus and brick ballast 4cm(11/2") gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joint of the panels if any and giving them a uniform finish including supply etc. required for proper completion of the work
145
-
622.74
... More
construction of masonary Sluice Valve Chamber
2
-
23987.5
... More
Supply and fixing of sluice value
2
-
19000
... More
Replacement of water leval indicator
2
-
9000
... More
Replace ment Lightning conductor and making earthing as per latest IS code
1
-
20000
... More
Aboriculture
2
-
16000
... More
Painting of all concrete surface in two coat premium acrylic smooth exterior paint with silicon addtive with one coat of exterior primer over smooth base of cement based wall putty and steel pipe works with three coats of approved cement paint and anticorrosive paints
2
-
75000
... More
Providing scaffolding for all requred purpose for repair works inside waterworks including supply of all material labour T&p for proper complition of work.
2
-
20000
... More
Making ferrule connection in All type of road including all required excavation, desmentling reinstatatement of all type roads roads, supply of ISI marked all material ( Ferrule Brass, Brass Bib Cock, Shaddle Clamp, bends HDPE and GI Pipes) etc all complete for proper completion of work.
576
-
3591.41
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements