UP Jal Nigam Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

UP Jal Nigam - UPJN Tender

Works
Eprocure
Opening Date10 Jul 2020
Closing Date15 Jul 2020
Tender Amount₹ 71,84,805 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Power Cable for T.W.

80

-

270.75

... More
Provision of Stand by dozer.

1

-

23750

... More
Provision of Solar Pannel and LED Light on water works campus with all accessories and fitting.

1

-

28500

... More
O.H.T. Raelated works.

-

-

-

... More
Construction of Masonary type sluice Valve chamber as per departmental type design.

3

-

20520

... More
Supply and fixing of Water Level indicator including supply of all labour, material, T&P etc. complete in all respect.

1

-

33250

... More
Provision for repairing & Painting work of 350Kl. /15 m. O.H.T. includig including supply of all labour, material, T&P etc. complete in all respect.

1

-

166250

... More
Pump House related works.

-

-

-

... More
Scraping old white or colour washing including all labour T&P etc. required for proper completion of work in boundary wall.

110

-

21.69

... More
Providing plaster of Paris wall putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete.

110

-

177.43

... More
Finishing walls with oil based distemper paint of approved make and quality over one priming on new work with two coats to given an even shade including supply of all materials, labour T&P etc required for proper completion of work.

110

-

140.84

... More
Painting or Varnishing new iron work or new wood work in small/large areas with one coat priming and two coat of approved paint or Vamish inclduing supply of all materials, labour T&P etc. complete required for proper completion of the work

26

-

167.23

... More
Boundary & gate related works.

-

-

-

... More
Scraping old white or colour washing including all labour T&P etc. required for proper completion of work in boundary wall.

372.48

-

21.69

... More
Finishing wall with premium Apexpaint (two coat) with silicon additives of required shade (DSR 13.47.1) all time weather proof paint i.e. apex ultima or other similar approved make quality and of required shade over one priming coat on new work with two coats to give an even shade including cost of one priming coat preparation of surface & supply of all materials labour T &P etc required for proper completion of the work (Outer plaster/Pointing Area)

372.48

-

140.84

... More
Painting of iron gate with one coat priming and one coat of approved paint or varnish including supply of all materials, Labour and T & P etc required for proper completion of the work.

11.52

-

167.23

... More
Staff Quarter related works.

-

-

-

... More
Excavation in foundation in ordinary soil (loan, clay, and / or sand) including lift up to 1.5m and leap up to 50m refilling, watering, and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches,or into the plinth and disposal of surplus earth upto a distance of 50 m from the center of the foundation trenches.

28.55

-

158.91

... More
Concrete with 40 mm gauge brick ballast, local sand and cement in proportion of 1:6:12 in foundation including supply of all materials, labour, T&P etc required for proper completion of work.

7.51

-

4431.94

... More
First class brick work in 1:6 cement and local sand mortar in foundation and plinth including supply of all materials, labour T&P etc required for proper completion of work.

21.23

-

5581.46

... More
25 mm thick damp proof coarse with cement ,stone grit 12mm and approved coarse sand 1:1.5:3 with and including water-proofing materials asordered by the Engineer-incharge in the proportion as specified by the manufactures, also included bitume painting (85/50 or 85/25), supply of all materials, labour T&Pand tools and plants etc required for proper completion of the work and including proper curing and shuttering as necessary.

8.89

-

407.35

... More
Sand filling in the foundation including supply of labour ,material ,T&P etc .

16.5

-

1754.53

... More
Ist Class brick work in 1:4 cement and local sand mortar in superstructure including supply of all material, labour, T&P etc required for proper completion of the work. (Thickness of wall to one brick thick).

29.74

-

5739.64

... More
12 mm thick plaster with cement and sand mortar in proportion of 1:6 over brickwork ,minimum thickness not be less than 10mm ,including supply of all materials ,labour ,T&P etc for proper completion of work.

226.6

-

174.34

... More
20 mm thick cement plaster , in Dado or skirting with cement and coarse sand mortar 1:2 laid in panels and finished with 3mm floating coat of neat cement or 1:5 cement and marble dust , including supply of all materials ,labour ,T&P etc for proper completion of work.

6.4

-

558.95

... More
Same as item no 14 but in proportion 1:4 with cement and local sand mortar, over ceiling.

27.6

-

197.5

... More
R.C.C. work with Cement approved Coarse sand and 20 mm Gauge approved stone ballast in the proportion 1:1.5:3 in lintels of doors, windows & sunshade excluding reinforcement and its bending but including its fixing and binding the same 24 B WG wire in position with supply all materials labour T&P etc required for proper completion of work.

5.56

-

12798.27

... More
Mild steel or iron work in plain work such as RCC or RB work (when not included in overall rates ) brought to required shape as necessary ,including bending and supply of steel and wastage for completion of work

4.5

-

8892.3

... More
Supply and fixing of MS angle iron chaukhats of 40x40x6mm size including simoe moulding straight work as in chaukhats and also supply of all materials ,labour, T&P etc required for proper completion of work.

3.1

-

83.3

... More
Supply and fix hold fast in doors and windows chaukhats 25cmx50mmx6mm flat iron including their cutting ,moulding, welding to requirwed shape also including other materials such as nails and screws etc required in all aspect to complete the work.

60

-

62.7

... More
Mild steel grill in windows wrought to required form, including supply of labour, steel ,T&P etc for proper completion of work.

2.06

-

1672

... More
25 mm thick (1:2:4) plain cement concrete floor with cement course sand and 20 mm gauge stone ballast, laid in panels, finished with 3 mm floating coat of neat cement or cement and marble dust in ratio 1:5 as specified, and removing any overlapping or mortar at the joints of panels if any and giving them uniform finish, including supply of all materials, labour, T&P etc. required for proper completion of the work. including 75 mm thick base concrete consisting of cement, local sand and first class brick ballast 40 mm gauge in proportion of 1:4:8 including supply of all materials, labour T&P etc required for proper completion of work.

20.4

-

709.44

... More
Supply of door and windows shutters with grills and fixing cleats,stops,hinges,locks,bolts,handlers,springs & other fittings(excluding supply of fittings) as per specification and direction of E/I.

25

-

5159.46

... More
Supply and fixing of oxidized iron fittings of approved make for doors and windows.

1

-

8360

... More
Painting or Varnishing new iron work or new wood work in small/large areas with one coat priming and two coat of approved paint or Vamish inclduing supply of all materials, labour T&P etc. complete required for proper completion of the work

36.59

-

151.77

... More
White washing in three coat including supply of all materials, labour, T&P etc. complete required for proper completion of the work

252.87

-

18.19

... More
Providing plaster of Paris wall putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete.

252.87

-

156.14

... More
Finishing walls with oil based distemper paint of approved make and quality over one priming on new work with two coats to given an even shade including supply of all materials, labour T&P etc required for proper completion of work.

252.87

-

128.46

... More
Construction of Brick Floor laid dry and sand filling in joints including suplly of all materials ,labour ,T&P etc required for the proper completion of the work.

12.6

-

538.46

... More
Provide all material, labour, T&P etc. and construct 100 mm dia semi circular C.C. drain inclduing rendering the surface smooth with neat cement

19.5

-

1018.91

... More
Supply of all materials , labour,T&P etc and construct inspection chamber as per type design and drwaing.

1

-

8360

... More
Supplying, carting, laying, jointing, fixing and testing of (1/2 -1 inch) CPVC Screwed pipe with specials and fittings inclduing cutting holes in masonry and making good the walls, fixing clamps wherever necessary etc. complete including cost of white lead, hemps, oil, etc. complete.

30

-

250.8

... More
Supply of all material ,labour,T&P etc fixing of water tap required for proper completion of the work.

3

-

444.61

... More
Supply of all material ,labour,T&P etc fixing of float valve required for proper completion of the work.

1

-

444.61

... More
Supply and fixing of 110mm dia PVC pipe from U trap to septic tank including supply of all special materials required for proper completion of the work.

10

-

167.2

... More
Supply and fixing of RCC Jali of size 20cmx20cm.

4

-

418

... More
Provision for internal electrification including supply of all materials, labour, T&P etc. complete.

1

-

20900

... More
Supply and fix 110mm dia PVC down Pipe with rose heads ,bends, gratings with necessary MS clamps 25mmx 3mm fixed with walls including supply of 150mm long ,6mm dia nails including supply of all materials ,labour etc for proper completion of work.

5

-

167.2

... More
Construction of septic tank and soak pit including supply of materials labour etc complete.

1

-

83600

... More
Supply and fix of position 500 litre capacity PVC (Sintex or other approved make ) storage tank.

1

-

4180

... More
Supply and fix indian type latrine seat with U-Trap including supply of all materials, labour, T&P etc. required for proper completion of the work.

1

-

1672

... More
Distributiuon System & appurtenant works.

-

-

-

... More
Supply of following materials including at F.O.R. destination inclusive of all taxes & duties, third party inspection charges, transit insurance, freight, loding, unloding and stacking etc complete.

-

-

-

... More
ISI Marked HDPE Pipes 6Kgf/sqcm conforming to IS-4984/1995 or its latest amendments.

-

-

-

3200

-

76

250

-

104.5

200

-

147.25

... More
ISI marked C.I.D.F. sluice valve, class "1" conforming to IS-780/1969 or its latest amendments. 50mm

2

-

3206.25

... More
ISI marked C.I.D.F. scour(sluice) valve, class "1" conforming to IS-780/1969 or its latest amendments. 65 mm

1

-

3206.25

... More
I.S.I. Mark HDPE Specials.

1

-

7469.48

... More
Excavation for pipe line in ordinary soil (loam, clay, sand) and soil mixed with kankar, shingle, moorum etc. requiring the use of special T&P such as pick-axes, sabblas with lift up to 1.5m and lead up to 50m and including filling back, watering and ramming of excavated earth into the trenches and disposal of surplus earth within 50 metres.

2255.3

-

231.53

... More
Cartage of following pipes and special from local store to site of work , lowering them into the trenches and laying true to alignment and gradient, jounting of pipes, cutting of pipes for making the required length including testing of pipe HDPE PE-100 6 kg/cm2 . - 63mm dia

3200

-

20.48

... More
75mm dia

250

-

27.78

... More
90mm dia

200

-

34.3

... More
Cartage of following valves from local store to site of work , fixing in position in the pipe line and jointing including the cost of all jointing materials, testing etc. for proper completion of the work .C.I.P/E, D/F sluice valves - 50mm

2

-

438.16

... More
C.I.D.F. scour(sluice) valves 65mm

1

-

438.16

... More
Supply all materials, labour, T&P etc. and construct the surcafe chambers as per type design For sluice valves

2

-

3325

... More
For scour valves

1

-

20520

... More
Dismantling and re-instatement of following type of surfaces including sorting out and sytacking off serviceable material and disposal of unserviceable material up to a distance of 50 m. B.O.E. Road

729.3

-

389.5

... More
Painted Road

15

-

1508.12

... More
C.C. Road

132.6

-

1492.74

... More
Provision for crossings of nalas & Culverts including shifiting of telephone cable etc. complete. Small crossings up to 3.00 m

1

-

9880

... More
Provision of House Connection including all labour & material, T&P etc. complete. As per departmental type design.

1233

-

3325



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.