Rajya Krishi Utpadan Mandi Parishad Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Eprocure
Opening Date15 Feb 2019
Closing Date27 Feb 2019
Tender Amount₹ 23,60,000
Costs
EMD
₹ 2,40,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_RKUMP_309555_1Bid Award Id
ViewTender No
02/506/2019Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
M-150 Brick work in one cement and 4 Coarse sand of 1.25 FM mortar in foundation and plinth including supply of all materials labour, tools & plants etc. required for proper completion of the work. (S.I. No. 305)
65
-
4650
... More
2.50 C.M thick Damp proof course with cement and approved, coarse sand 1:2 with and including water proofing as ordered, by E/I in the proportio as spefied by the manufacturer including supply of all material labour and T&P etc. required for proper completion of the work and including proper curing & shutterings as necessary. (S.I. No. 574)
41
-
206.4
... More
M-150 Brick work in 1:4 one Cement and six coarse for supper structure for one brick thick wall. including supply of all material labour and T&P etc. required for proper completion of the work (S.I. No. 305 + 309+ 310)
24
-
5080
... More
Same as above item no 5 above but Brick work in 1:3 and coasre sand mortar for half brick thick wall in super structure. including supply of all material labour and T&P etc. required for proper completion of the work (S.I. No. 307 + 309+ 310a)
27
-
5780
... More
Earth work in filling ordinary soil 5.00 KM from site. (AOR as per sanctioned estimate of 1000 MT Godown Robertsganj.)
60
-
225.4
... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:2:4 in lighter beam having excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 285)
4.6
-
7100
... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:2:4 in slab excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 284)
15
-
6800
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend hooks, and authorized overlapping shall be measured and including cost of binding wire. (S.i. No 504)
28.73
-
5200
... More
M.S. Or iron work in M.S grill and stair case railling including supply of all labour & material etc. required for complition of the work S.No 502 (A)
2
-
6600
... More
Screeding over leaky roofs with bitumen paint at 1.7 kg per sqmetere including sweepin, cleaning the roof with brushes heating of the paint upto the required temperature, pouring it on the surface, spreding of necessary quantity of approved coarse sand at 1 cft per 100 sft and including supply of all materials, labour tools & plants etc required for proper completion of the work SI No. 543 (VNS Schedule)
90
-
95
... More
100mm thick (av) mud phaska of demped brick earth on roofs laid to slope consolidated and plaster with 25mm thick mud mortar mixed with bhusa at 35kg per cum of earth and gobri looping with mix 1:1 (1 clay and cow dungs) and covered with cement mortar 1:3 cement and fine sand finished neat SI No. 549 (VNS Schedule)
90
-
410
... More
12 M.M thick cement plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1 cm including supply of all material labour and T&P etc. required for proper completion of the work. (S.I. No. 584)
680
-
125
... More
Add for extra labour to all item of plaster over rough face of one thick wall S.I. No. 596.
117
-
14
... More
Providing & laying vitrifed floor tiles kajaria KERRO Brand on equivalent brand of super quality in defferent size (thickness specified by manufacturer) with water absorption less than 0.80% and confirring to IS 15622 of approved make in all colours and shade laid on 20mm thick cement mortar 1:4 (1 cement,4 C/sand) including grouting the joints with white cement and matching pigments etc complete. (Size of tiles 600x600mm) (SI No. 19 CPWD 11:41:1) Page 35
70
-
1140
... More
Supply and Fixing of 6 mm. thick china white Glazed tiles in flooring or in skirting or dado laid 1:3 cement and c/sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materilas, labour T&P etc complete.S.I. No. 628.
202
-
1060
... More
Land secping complete in all respect as per directed by the E/I
102
-
350
... More
4cm thick plain cement concrete floor with 1:2:4 cement approved coarsand & stone grit laid in panels finished with 3 mm floating coat of neat cement and marble dust in ratio 5:1 as specified including supply of all material labour T&P required for proper complition of the work (without base concrete) S.I. No. 605
27
-
300
... More
4.0 cm thick first class Brick Balast under iterlocking tiles (analyces rate).
2.4
-
1642
... More
Supply of 80 mm thick precast cement concrete and fly ash I-shape" interlocking paver blocks ISI mark confirming to IS: 15658-2006 with top layer of minium 8 mm thickness having plan dimension 200x(160+120 mm) of O.P cement, smooth high gloss finish, skid resistant, manufactured from, rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver block shall not be less than 30 MPa (3-30) and weigt 4.5 kg per including cost of materials, with a blanket layer of 4.00 cm. thick fine sand, including labour, T&P etc, required for proper completion of the work as directed by E/I New item No. 12 (Sanction by 1000 MT Godown )
30
-
720
... More
Supply and fixing aliminum door, window, ventialer I/C cost of all materilas, labour Vat, all taxes, T&P required for proper complection of the directed by E/I (LMR)
30
-
3550
... More
Painting or varnishing work in small areas or new wood work withone coat (upto one square metre) ready mixed priming paint and 2 coat of superior quality ready mixed paint or varnish including supply of all materials. Labour tools & plants etc required for proper completion of the work paint to be used should confirm the ISI no 641+642
5.14
-
90
... More
Painting on DPC or over roof slab one coat of air blown bitumen 60/70 or 80/100 grade @ one kg/sqm including cost of fuel wood other materials labour T&P etc. required for proper completion of the work SI No. 362 (VNS Schedule)
41
-
72
... More
Providing wall putty on new surfacwe with approved quality material of Berger/J.K/Birla or Similar make 2 coats S.I. No. 662 new item 04 (As Per D.S.R.)
628
-
60
... More
Distempering (Two coat) with oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an even shade over and including a priming coat with cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including the surface even with plaster of paris or approved synthetic materials and sand papered smooth including supply of all materials labour T&P etc. required for proper completion of the work. S.I.No. 649+650 (VNS Schedule)
253
-
63.3
... More
Finnishing walls with weather coat paint, snowcem of approved make & quailty of new work with three coats to give an even shade including pering surface by touughly cleaning and sand papering I/C supply of all materials, labour and T&P etc required for proper completion of the work. S.I No. 662 new item + NBO 18.52 (VNS Schedule)
385
-
58.5
... More
Provind and fixing granit stone 205 mm size as per D.S.R.
10
-
2500
... More
R.C.C. work with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:1½:3 in raft foundation including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 287A)
1.3
-
6200
... More
R.C.C. work with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:1.5:3 in Coloumn having span upto 6.0 mtr. excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 288B)
3.5
-
7700
... More
Supply and laying of sand in blanket coat including supply of necessary quantity of sand from a distance not exceeding 8 km from the side of work and including watering dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. (SI No. 255)
16.9
-
650
... More
Construction of Toilet Block (Sanitary Work)
-
-
-
... More
Providing and fixing water closet squatting pan ( Indian type W.C pan) with 100 mm sand cast iron P or Strap, including cutting and making good thw walls and floors wherever required. White virteous china orissa patter W.C pan of size 580x440 mm without Cistren LMR
5
-
1730
... More
Providing and fixing white vitreous china water closet (eurpean type) with seal and lia, completed including painting of fitting and brackets, cutting and making ggod the walls and floors, W.C pan with ISI marked white solid plastic seat and lid without Cistren. LMR
2
-
5266
... More
Supply and fixing wash basin with single hole/number of holes for pillers tap with C.I or M.S brackets painted white including cutting holes and making good the same 630x450 LMR
5
-
1647
... More
Supply and fixing of uirnal with sensar completed in all respect as per directed E/I LMR
5
-
16490
... More
Providing and fixing C.P Brass bib cock of approved quality conforming to IS 8931, 15 mm nominal bore LMR
11
-
900
... More
Supply and fixing of piller cock for wash basin. Push back approved compnty completed in all respect as per direted LMR
5
-
2172
... More
Providing and fixing C.P brass stop cock (Conceled) of standard desing and of approved make conforming to IS 8931, 15 mm nomainal bore, LMR.
4
-
1125
... More
Supply of mirror complete in all respect as per directe LMR
5
-
1030
... More
Supply and fixing PVC connection completed in all respect as per direted LMR
7
-
200
... More
Supply and fixing of bottal trap for wash basin LMR
5
-
1155
... More
Supply and fixing 10 cm. dia C.P jali complete in all respect as per directed LMR
15
-
150
... More
Supply and fixing tower holder completed in all respect as per directed LMR
7
-
715
... More
Supply and fixing of soap dish complete in all respect as per direted LMR
7
-
400
... More
Providing of fixing toilet paper holder 17.34.1 CP brass LMR
2
-
418
... More
Supply and fixing of Heath foccet for european seat complete in all respect as per directed LMR
2
-
1001
... More
Supply and fixing 110 mm di PVC pipe 6.00 kg per cm sq ISI mark compeleted in all respected LMR
70
-
240
... More
Supply and fixing of 100 mm nihani trap PVC completed in all respect as per directed LMR
25
-
260
... More
Construction masonry chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 for stop cock, with C.I surface box 100x100x75 mm (inside) with hinged cover fixed in cement concrete etc complection of the work E/I S.I. No. DSR 18.32
8
-
1195
... More
Construction brick masonry manhole in cement mortar 1:4 with inside size 90x80cm and 45 cm deep including C.I cover with frame 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg. S.I. No. DSR 19.7.1
4
-
8634
... More
Supply and fixing water tank ISI mark with fiting completed in all respect as per directed E/I LMR
4000
-
6.63
... More
Supply and fixing in build cistern for W.C seat completed in all respect as per directed E/I LMR
7
-
18550
... More
Supply and fixing of 20 mm dia C.P.V.C pipe of approved quality complete in all respect as per directed
45
-
281.35
... More
Supply and fixing of 25 mm dia C.P.V.C pipe of approved quality complete in all respect as per directed
24
-
336.25
... More
Supply and fixing of 32 mm dia C.P.V.C pipe of approved quality complete in all respect as per directed
35
-
407.4
... More
Supply and fixing of 50 mm dia C.P.V.C pipe of approved quality complete in all respect as per directed
25
-
569.2
... More
Supply and fixing of 75 mm dia C.P.V.C pipe 6.0 kg ISI mark of approved quality complete in all respect as per directed
20
-
132
... More
Supply and fixing of 90 mm dia C.P.V.C pipe 6.0 kg ISI mark of approved quality complete in all respect as per directed
10
-
220
... More
Supply and fixing of 140 mm dia C.P.V.C pipe 6.0 kg per cm sq ISI mark completed in all respect as per directed
10
-
299.5
... More
Construction of Toilet Block (Septic Tank)
-
-
-
... More
Excavation in foundation in b/cotton soil including upto 30 mtr and lift upto 30 meter and including of excavation earth in to the trenches or in to the space of the foundation trenches or into the plinth and removal and disposal of surface earth as directed E/I (S.I. No. 251A)
36.7
-
130
... More
Concrete with 4 cm guage brick ballast fine sand and cement in proportion of 12:6:1 in foundation and under floors including supply of all materials,labour,tools & plants etc. required for proper completion of the work. (S.I. No. 273 )
2.8
-
3100
... More
M-150 Brick work in 1:4 Cement & Coarse sand mortar in foundation and plinth in one brick thick wall including supply of all material labour and T&P etc. required for proper completion of the work (S.I. No. 305a)
7.4
-
4650
... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:2:4 in slab excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 284)
2.5
-
6800
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend hooks, and authorized overlapping shall be measured and including cost of binding wire. (S.i. No 504)
2.94
-
5200
... More
4cm thick plain cement concrete floor with 1:2:4 cement approved coarsand & stone grit laid in panels finished with 3 mm floating coat of neat cement and marble dust in ratio 5:1 as specified including supply of all material labour T&P required for proper complition of the work (without base concrete) S.I. No. 605
11.3
-
300
... More
2.50 C.M thick Damp proof course with cement and approved, coarse sand 1:2 with and including water proofing as ordered, by E/I in the proportio as spefied by the manufacturer including supply of all material labour and T&P etc. required for proper completion of the work and including proper curing & shutterings as necessary. (S.I. No. 574)
11.3
-
206.4
... More
Cement concrete 1:2:4 cement c/sand and 20 mm gauge stone ballast excluding reinforcement all complete (SI No. 279)
0.2
-
5250
... More
12 M.M thick cement plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1 cm including supply of all material labour and T&P etc. required for proper completion of the work. (S.I. No. 584)
31.73
-
125
... More
Providing and fixing of C.I. Step
8
-
80
... More
Providing and fixing of 100 mm dia C.I. Pipe.
4
-
350
... More
S/F of C.I. manhole cover 600*600.
2
-
1350
... More
100mm dia HCI ventiliating terminal guard.
2
-
305
... More
HCI 100 mm dia bend/tee
4
-
525
... More
Construction of Toilet Block (Soakpit Work)
-
-
-
... More
Excavation in foundation in b/cotton soil including upto 30 mtr and lift upto 30 meter and including of excavation earth in to the trenches or in to the space of the foundation trenches or into the plinth and removal and disposal of surface earth as directed E/I (S.I. No. 251A)
30.5
-
130
... More
M-150 Brick work in 1:4 Cement & Coarse sand mortar in foundation plinth in one brick thick wall including supply of all material labour and T&P etc. required for proper completion of the work (S.I. No. 305a)
8.8
-
4650
... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:2:4 in slab excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 284)
1.4
-
6800
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend hooks, and authorized overlapping shall be measured and including cost of binding wire. (S.i. No 504)
1.65
-
5200
... More
12 M.M thick cement plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1 cm including supply of all material labour and T&P etc. required for proper completion of the work. (S.I. No. 584)
20.26
-
125
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements