Saharanpur Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Saharanpur Development Authority - SDA Tender

Works
Eprocure
Opening Date2 Jan 2019
Closing Date16 Jan 2019
Tender Amount₹ 21,16,167 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M-150 Brick work 1:4 cement & four coarse sand in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. SI-305a

47

188000

4000

... More
12 mm thick plaster with cement and coarse sand of 1.25 fineness modulus in 1:4 including neat cement floating coat over brick work minimum thickness not to be less then icm including suppy of all materials, labour, tools and plants etc. requried for proper completion on work. S.I.-584

210

29400

140

... More
Cement Concrete with 2cm, guage approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc required for proper completion of the work. SI-279

9

45450

5050

... More
Construction of un-reinforced dowel jointed at expansion and construction joint only plain Cement Concrete pavement thickness as per design over a prepared sub base in 1:1.5:3cement coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregates not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weight batcher using approved mix design laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading by the concerete with shovels rackes compacted using needle, scred and plate vibrators and finshing in continuous operation including provision of contraction and expansion, construction joint as per norms, applying debonding strips primer, sealant, dowel bars, neer approaches to bridge/ culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (Where specified) including Cost of Polythene Sheet and Dowel bar and also including complete shifting of materials & Concrete etc complete work. thickness of c.c is less then 20 cm New item no. 9 (1) (Road work)

230

1311000

5700

... More
Dismentling brick work or stone work in line or cement motar including stacking of materials as directed by the engineer charge within a distance of 60 meter. as per S.I. 692

162

51192

316

... More
Disposal of Dismental material obtained from dismentling up to 5 km distance including loading, unloading and cartage complete in all respect as per diretion of engineer in charge.S.I.- 231a

155

26815

173

... More
Concrete with 4cm guage stone ballast. Finesand of 1.25 F.M. and cement in proportion of 1:5:10 including supply of all materials, labour, t&p etc. required for proper completion of the work complete in all respect. S.I. No-273/2016

25

100000

4000

... More
R.C.C. work with cement, approved coarse sand & 2cm gauge approved stone girt in proportion of 1:1.5:3 in slab exluding supply of reinforcement and its bending, but including its fixing & binding the same with 24 B.W.G.G.I. binding wire & including necessary centering and shuttering etc. and supply of all material, labour, t&p etc. required for proper completion of the work including cost of binding wire (S.I. NO-284a)

2

13200

6600

... More
Mild steel or Iron in plain work such as R.C.C. or RB work including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorised overlapping shall be measured and including cost of binding wire.--------------(SI NO-504)

2

11200

5600



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.