Rural Engineering Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Rural Engineering Department Tender

Works
Eprocure
Opening Date25 Nov 2021
Closing Date2 Dec 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.C.C work in 1:2:4 with cement c.sand &20 mm Grit in plinth beam i/c all mat. Labour T&P etc

7.95

-

6400

... More
R.C.C work in 1:1.5:3 with cement c.sand &20 mm Grit in in column i/c all mat. Labour T&P etc

8.28

-

7400

... More
M-150 class Brick works in 1:6 cement sand morter in plinth to foundation including all materials labour & T&P etc. complete work S.I.-303

9.79

-

5200

... More
P/L 25 mm thick D.P.C.with 1:1.5:3 with cement c.sand & 13 mm stone grit with water proofing compound i/c all materials , labour & T&P etc. S.I.-361

23.97

-

230

... More
M-150 class Brick works with1:6 cement sand mortar in superstructure one brick wall including all materials labour & T&P etc. complete work S.I.-303+309+310

41.14

-

5660

... More
R.C.C work in 1:2:4 with cement c.sand &20 mm Grit in lintel & sunshed etc. i/c all mat. Labour T&P etc

4.19

-

6400

... More
R.C.C work in 1:1.5:3 with cement c.sand &20 mm Grit in T-Beam & Slab etc. i/c all mat. Labour T&P etc

40.94

-

7500

... More
M.S tor steel iron work such as R.C.C. Work wrought to be requered shape i/c cutting & bending As necessary I/C all mat. Labour & T&P but excluding cost of binding wire etc.

60.22

-

5600

... More
Supply of M.S. angle(40*40*5) iron for door with shutter frame with M.S. sheet Pannel welding fabrication and one coat of red oxide paint etc S.I.-502 with 1 mm thk MS sheet SI 503

5.18

-

6600

... More
Supply of approved M.S. Z section quality and drawing made of flat iron i/c all material, labour, fabrication, T&P with one coat of red oxide paint Si new Item

4.86

-

6800

... More
Supply of approved M.S. small size sectionl quality and drawing made of flat iron i/c all material, labour, fabrication, T&P with one coat of red oxide paint Si 502

2.9

-

5600

... More
Fixing of 4mm thick glass pan as per PWD Si 812(ii)

16.47

-

480

... More
Fixing door, window and ventilator hold fast with P.C.C. 1:2:4 C/S & 20 mm stone grit i/c all complete S.I.-279a

1.43

-

5500

... More
Providing, Laying & jonting 100 mm dia PVC. pipe Rainwater drainage

24.6

-

270

... More
12 mm thick Plaster in wall 1:6 cement & sand mortar it Should be 14 days water curing by contactor S.I. -586

602.54

-

105

... More
Earth work in filling in B.C. Soil. Earth cartege by T/T withen 1 km i/c all labour T&P etc.

116.16

-

221.9

... More
S/F of local sand in floor i/c all labour and T&P S.I.-255

23.23

-

1000

... More
Laying of C.C. in 1:4:8 with cement, cores sand and 40 mm Stone ballast in Floor i/c all labour ,materials and T&P etc. S.I.281

23.23

-

4200

... More
Laying of C.C. in 1:2:4 with cement, cores sand and 40 mm Stone ballast in Floor with cement slurry neat finish i/c all labour ,materials and T&P etc

17.42

-

5500

... More
Providing and applying of cement based Putty average thickness 1 mm , of approved brand and manufacture over the plastered wall surface to prepare the surface even and smooth complete 13.8 Page 50

780.35

-

115

... More
Finishing wall with premiun acrylic smooth exterior paint of approved quality on new work with two coat to give an even shade including supply of all materials, labur, tools and plants etc. required for proper completion of work....... as per PWD specification 15.11.3 scheduled item no. 660

780.35

-

80

... More
Painting or venishing new iron work or new wood work with one coat priming and two coat of approved paint i/c all material labour T&P S.I. No.-641

24.27

-

60

... More
S/F of hexagonal type fan box Page 54 S.I.-7

20

-

180

... More
Earth work in excavation for foundation of apron , step and soak pit etc. i/c all labour T&P

8.89

-

120

... More
Sand filling in foundation of apron, stair i/c all labour and T&P

4.03

-

1000

... More
Laying of L.C. C. in 1:4:8 with c/s and 40mm G.S.B. in foundation i/c all

4.45

-

4200

... More
M150 Brick Work in 1:4 with c/s & mortar in satir ramp and septick tank i/c all labour & T&P

4.08

-

5400

... More
12 mm thk Plaster Work in 1:4 with c/s and mortar in septick tank i/c all labour & T&P

4.94

-

135



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.