If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Purvanchal Vidyut Vitaran Nigam Limited - PUVVNL Tender
Eprocure
Opening Date29 Oct 2024
Closing Date4 Nov 2024
Tender Amount₹ 56,30,000
Costs
EMD
₹ 60,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Summary
Protection And Other Miscellaneous Works For The Industrial Sector For The Works To Be Done Under The Additional Business Plan Scheme 2024-25 Under The Area Of Electricity Distribution Division-ii, Gorakhpur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PVVNV_969671_1Bid Award Id
ViewTender No
11/EDC-II(G)/2024-25Tender Authority
Purvanchal Vidyut Vitaran Nigam Limited ViewPurchaser Address
-Website
http://http://puvvnl.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
GI Strip (40X6 mm)
147
-
-
Number Plate with all fitting.
21
-
-
Danger Board with all fitting
21
-
-
16 Gauage GI Net between front & back (H-500 W-600 with Hole Dia 10mm and thickness of 1.5mm) in 25X25X3 mm angle frame with fasteners of required size for protection from Garbage
56
-
-
Construction of new plinth as per specifications
21
-
-
Fixing of RMU on plinth with complete fittings with Cable box.
21
-
-
Cable laying along with Cost of digging of trench.
1260
-
-
Chemical Earthing of RMU with material
42
-
-
Fixing of GI Strip with Electrode at One end & RMU on other end
147
-
-
Internal wiring of RMU with CT & Auxiliary
21
-
-
Erection of fencing with materials
168
-
-
Jointing of 11 KV Indoor cable Box with 3x185mm Sq. Cable
147
-
-
Fixing of Net with Fasteners in Angle Frame
21
-
-
Hkkx&2 feM LiSu iksy xhMk lsDVj 13 dk dk;ZA
Cartage of 11 Mtrs. long ST Pole from Store Centre Gorakhpur to Worksite with loading-Unloading and Safely Proper Stocking at site distance about 0-50 Kms.
24
-
-
Nut and Bolt with Washer off Size
15
-
-
Barbed Wire
24
-
-
F-Clamp for STP With Nut and Bolts
24
-
-
Cross Arm Holding Clamp ST Pole With Nut and Bolts
24
-
-
Errection of 11 Mtrs. Long Single ST Pole
24
-
-
Opening of line conductor and Re-stringing, Sagging and binding of line conductor after erection of MID Span Pole.
1
-
-
Concreting of ST Pole
24
-
-
Complete Earthing of ST Pole
24
-
-
Hkkx&3 ,y0Vh0 ,0lh0ch0 xhMk lsDVj 13 dk dk;ZA
Cartage of following Materials from Store Centre Gorakhpur to Worksite with loading-Unloading and Safely Proper Stocking at site distance about 0-50 Kms.
A- L.T. ACB 4 POLE 630 A
17
-
-
B- L.T. ACB 4 POLE 800 A
19
-
-
C- L.T. AL. XLPE CABLE 1X240 SQMM
204
-
-
D- L.T. AL. XLPE CABLE 1X400 SQMM
228
-
-
Copper Z Clamp for 250 KVA T/F
68
-
-
Copper Z Clamp for 400 KVA T/F
76
-
-
Aluminium Lug 240 Sqmm.
68
-
-
Aluminium Lug Long Size 400 Sqmm.
76
-
-
Construction of Plinth for ACB
36
-
-
Fixing of ACB from Transformer to ACB to Pole
36
-
-
Double Chemical Earthing of ACB by Aluminium Strip.
36
-
-
Hkkx&4 Vh0ih0,e0vks0 lsV yxkus dk dk;ZA
Cartage of following Materials from Store Centre Gorakhpur to Worksite with loading-Unloading and Safely Proper Stocking at site distance about 0-50 Kms.
A- 11 KV TPMO.
36
-
-
B- ACSR Weasal Conductor and other Materials.
0.36
-
-
Nut and Bolt.
72
-
-
M.S. Clamp For STP With Nut and Bolts
144
-
-
Complete Installation of TPMO
36
-
-
Hkkx&5 ,y0Vh0 ykbu dh jh&d.MDVfjax dk dk;ZA
Cartage of following Materials from Store Centre Gorakhpur to Worksite with loading-Unloading and Safely Proper Stocking at site distance about 0-50 Kms.
A- 09 Mtrs long ST Pole.
25
-
-
B- ACSR Dog Conductor
4.7
-
-
Erection of Single ST Pole.
25
-
-
Grouting of Pole.
25
-
-
Repairing of Damaged ST Pole with Plinth
50
-
-
Nut and Bolt for Shackle Insulator
32
-
-
LT Clamp for ST Pole.
220
-
-
Opening of line conductor and Re-stringing, Sagging and binding of line conductor after erection of ST Pole with painting of 25 Nos. ST Pole.
1
-
-
Complete Earthing of ST Pole
25
-
-
Hkkx&6 lsD'kuykbtj dk dk;ZA
Cartage of following Materials from Store Centre Gorakhpur to Worksite with loading-Unloading and Safely Proper Stocking at site distance about 0-50 Kms.
A- 33 KV Line Isolator.
2
-
-
B- ACSR Dog Conductor and other Materials.
0.16
-
-
Grouting and Errection of Isolator.
2
-
-
Mounting and Fitting of Isolater
2
-
-
Chemical Earthing of Line Isolator.
4
-
-
Painting of Isolator structure.
2
-
-
PG Clamp
18
-
-
Hkkx&7 fIyaFk dh fjis;fjxa ,oa QsfUlax dk dk;ZA
Repair of Plinth of 100/250/400 KVA Transformer.
21
-
-
Repairing of Fencing of 100/250/400 KVA Transformer.
21
-
-
Hkkx&8 dsfedy vfFkaZx dk dk;ZA
Chemical Earthing Complete for I/E.
50
-
-
Alluminium Crimping Lug 400 Sqmm.
44
-
-
Hkkx&9 Mh0vks0 ¶;qt lsV LFkkfir djus dk dk;ZA
Cartage of following Materials from Store Centre Gorakhpur to Worksite with loading-Unloading and Safely Proper Stocking at site distance about 0-50 Kms.
A- 03 Phase DO Fuse Set.
10
-
-
B- ACSR Weasal Conductor and other Materials.
0.1
-
-
MS NUT and BOLT 6"x5/8
5
-
-
Eraction of DO Fuse Set.
10
-
-
Complete Installation of D.O. Fuse Set at Site
10
-
-