Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date6 Aug 2020
Closing Date25 Aug 2020
Tender Amount₹ 6,25,70,539 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 13,35,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CEGKP_499053_1Bid Award Id
ViewTender No
709/76Yat-Deo-Circle/20 Dated 27.07.2020Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Compaction of earth obtained from roadway cutting Construction of embankment with approved materials deposited at site from road cutting and excavation from drain and foundation of other structure graded and compacted to meet reqirement of table 300-2 (Excluding GST)
2923.2
-
52
... More
Granular Sub-Base with Coarse Graded Material (Table:- 400- 2) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Excluding GST)
3215.2
-
4147
... More
Wet Mix Macadem Providing , laying , spreding and compacting graded stone aggregate to wet mix macadam specification including preixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in sub base / base couse on well prepared surface and compacting with vibratory roller to achieve the disired density (Excluding GST)
2820
-
4432
... More
Wet Mix Macadem (Stablised Layer) Providing , laying , spreading of graded stone aggregate (WMM) after mixing with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying with 1%OPC cement and 3.50% Emulsion in uniform single layers on sub base / subgrade and compacting with the roller to achieve the disired density. (Including cost of emulsion but excluding GST)
3640
-
6974
... More
Tack Coat First (over primed surface) Providing and applying tack first coat with VG.- 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm in the norms bituminous surface cleaned with mechanical broom . (Including cost of bitumen but excluding GST)
28000
-
11
... More
Bituminous Concrete Grade-II Providing and laying bituminous concrete with 120 TPH batch type hot mix plant producing an avarage output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler , transporting the hot mix to work site , laying with hydostatic paver finisher with sensor control to the required grade , level and aligmnment , rolling with smooth wheeled , vibratory and tendom roller to achieve the desired compaction as per MoRT&H Specification Clause 509 complete in all respects. (Excluding GST)
840
-
10672
... More
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (1.00 Km cartage) (Excluding GST)
3100
-
120
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material (Excluding GST)
320
-
31
... More
P. C.C. with M15 cement , coarse sand and 4 cm gauge Dalla grit including all taxes , royalty and including supply of martial , labour and T&P etc. required for proper completion of work as per direction of E/I . (Excluding GST)
51
-
5824
... More
R.C.C ( M-20 Grade) (Excluding GST)
113
-
7686
... More
Supplying, fitting, and placing MS bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded. (Excluding GST)
81
-
4710
... More
Excavation of foundation in ordinary soil including lift upto 1.50 m and lead up 30m and including filling watering and ramming of excavated earth into trenches or into the plinth and removel and disposal of surplus earth as direction by I/E upto a distance of 30m from the foundation trench as per SI No-251 (Excluding GST)
230
-
31
... More
Concrete with 4 cms gaugestone ballast Course sand of 1.25 fineness modules and cement in the ratio6:3:1 including supply of all materials, labour, T&P etc required for proper completion of the work as per SI NO-280 (Excluding GST)
48
-
5824
... More
1st class brick work with class 150 bricks in 1:4 in cement and C. sand mortor in foundation & plinth including all cost of material, all labour T&P etc for completion of work. as per SI No 305 (Excluding GST)
40
-
4368
... More
Struck cement Pointing with cement mortor consisting one part of cement 2 part of fine sand of 1.25 finencess moudulous on brick work including raking the joint washing and cleaning and supply of all material, labour T&P etc required for proper completion of the work as per SI No-574 (Excluding GST)
150
-
168
... More
Supply of 600 mm NP-3 Hume pipes Including Laying (Excluding GST)
50
-
2216
... More
Supply of 900 mm NP-3 Hume pipes Including Laying (Excluding GST)
50
-
4800
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (Excluding GST)
10
-
31
... More
Providing and laying fine sand layer in foundation ( black cotton soil bed) including all materials , labour , T&P etc. for proper completion of work . (Excluding GST)
4
-
967
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Excluding GST)
17
-
5824
... More
Brick Work masonry in 1:3 cement, coarse sand mortar in foundation and plinth including all taxes , royalty and including supply of all material , labour , T&P etc. required for proper completion of work as per direction of E/I .SI NO 307A (Excluding GST)
90
-
4896
... More
Brick Work masonry in 1:3 cement, coarse sand mortar including all taxes , royalty and including supply of all material , labour , T&P etc. required for proper completion of work as per direction of E/I .in Super Structure as per SI.NO 314 (Excluding GST)
190
-
5568
... More
Pointing with cement mortar (1:2 ) on brick work in substructure as per Technical Specifications SI NO 574 (Excluding GST)
185
-
168
... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications SI. No 584 (Excluding GST)
30
-
120
... More
RCC Grade M25 (Excluding GST)
3.3
-
7835
... More
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification (Excluding GST)
3.2
-
4710
... More
Kilometer & Hectometer stone Supply and fixing of Km Hectometer stone complete Ordinary KM stone (Excluding GST)
4
-
1920
... More
Hectometer stone (Excluding GST)
16
-
576