Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Eprocure
Opening Date20 Sep 2021
Closing Date27 Sep 2021
Tender Amount₹ 10,00,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects complete as per clause 401.

3400

-

3400

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density with bitumenus emulssion SS. 3.5% and OPC Cement @1% by wet of mix and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects

5700

-

7000

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects

104500

-

13.5

... More
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause complete in all respects. and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects

2600

-

9200

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects

1550

-

10200

... More
Excavation in foundation in ordinary soil (loan, clay or sand) including lift up to 1.5 m and lead up to 30m and including filling waterning and ramming of excavated earth in to the trenches or in to the space in to the building and the side of foundation tranches.3 and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects

120

-

110

... More
Plain cement concrete with 4cm guage stone ballast and fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floors and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects SI No- 281

190

-

5500

... More
Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm. Thickness including local sand, in ratio 2:1 and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects SI No New item 1 Chp 5

14

-

1100

... More
Supply and laying & fixing NP-3, 600mm dia hume pipe and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects

20

-

2300

... More
Supply and laying & fixing NP-3, 900mm dia hume pipe and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects

20

-

4600

... More
M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects . (SI No - 307a)

85

-

4800

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of the fine sand of 1.25 finenes modulus on brick work and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects Si No 574

180

-

165

... More
Concrete with 2 cm guage stone grit instead 4cm guage stone ballastof fine sand of 1.25 F.M and cement in proportion of 1:2:4 in foundation and under floors and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects . (SI No- 279 A)

0.84

-

6100

... More
R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects Binding wire of supplied by the contractor free of cost. SI No- 283 and excluding G.S.T.

300

-

7100

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects including supply of all steel . SI No 504 and excluding G.S.T.

110

-

6100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.