Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date21 Feb 2019
Closing Date28 Feb 2019
Tender Amount₹ 31,00,000
Costs
EMD
₹ 3,10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CEAGR_316537_1Bid Award Id
ViewTender No
358/17A Dt 11-02-2019Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Costruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
10
38500
3850
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregates, watering and compacting to the required density grade 3 as per Technical Clause 405. Including 4 % Cement (OPC) & its Mixingh with rotaveter.
300
1407000
4690
... More
Earth work in patries in ordinary soil in 20 cm layers including ramming and dressing the surface to be required levels and slopes and also including 1.5 M lift and 30m lead also including cost of royalty as per direction of the E/I in
338
28054
83
... More
Providing and applying Tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. as per Technical Specification Clause 503(MoRD)
2250
25875
11.5
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. 511(MoRD)
2250
265500
118
... More
Providing, laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510.(MoRD)
2250
90000
40
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
20
1660
83
... More
Concrete with 4 cm gauge stone ballast fine sand of 1.25 F.M. and Cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour, tools and plants etc. required for proper completion of work. (Si No. 275a)
1.6
6800
4250
... More
M-150 brick work in one cement and three coarse sand mortar in foundation and plinth including supply of all materials, labour, T&P etc. reuired for proper completion of work. (SI No. 307)
10
48000
4800
... More
Supply and Laying dry 40 mm gauge O.B.B. ballast filling under H.P., including supply of all material, labour and T&P required for proper completion of work. (SI No. 790f)
1.6
1600
1000
... More
Pointing with cement and coarse sand in 1:3 over brick work including supply of all material labour T&P etc. required for proper completion of work (SI No. -13.20)
20
2100
105
... More
Supply / Laying and Fixing Propoer Position of 600 mm Ø N.P-3 H.P Including Supply of all material, labour and T&P required for proper complerion of work.
15
36000
2400
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements