Northern Railway Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Northern Railway - NR Tender
Ireps
Opening Date11 Mar 2025
Closing Date3 Apr 2025
Tender Amount₹ 4,16,92,906.89
Costs
EMD
₹ 3,58,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
358-DRM-MB-24-25-MORADABAD DIVISION-ENGINEERING/NORTHERN RLYTender No
358-DRM-MB-24-25Tender Authority
Northern Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Item No. 025082 (Suppy of Steel) ofSub Head-2 (Bridge Works -Substructure) of USSOR-2021(Except banned item).
-
-
17005890
... More
All items of Sub Head-3 (BridgeWorks-Super Structure (RCC)) of USSOR-2021 (Except banned item)
-
-
40732.43
... More
All items of Sub Head-4 (BridgeWorks-Super Structure (Steel)) ofUSSOR-2021 (Except banned item) 7
-
-
2559757.86
... More
All items of Sub Head-5 (BridgeWorks-Misc.) of USSOR-2021 (Exceptbanned item)
-
-
790474.67
... More
All items of Ch. No. 6 (Rails, Sleepers and Fittings Renewal) of NR's Unified Standard Schedule of Rates 2021 (except banned items )
-
-
14366.74
... More
All items of Sub Head-8 (Deep Screening and Ballast Related Activities) of USSOR- 2021 (Exceptbanned item)
-
-
211742.44
... More
All items of Ch. No. 12 (Activities at work site) of NR's Unified Standard Schedule of Rates 2021 (except banned items )
-
-
46789.65
... More
All items of Ch. No. 16(Small Track Machines) of NR's Unified Standard Schedule of Rates 2021 (except banned items )
-
-
6567
... More
All items of Ch. No. 17 (Handling of Materials) of NR's Unified Standard Schedule of Rates 2021 (except banned items )
-
-
45132.21
... More
All items of Sub Head-19 (Bridge Related Activities) of USSOR-2021 (Exceptbanned item)
-
-
2523.84
... More
All items of Ch. No. 21 (Miscellaneous Items) of NR's Unified Standard Schedule of Rates 2021 (except banned items )
-
-
823499.84
... More
All items of sub head - 10 of DSOR-2021 (except banned items) 16
-
-
5224536.06
... More
All items of sub head - 12 of DSOR-2021 (except banned items) 17
-
-
950485.01
... More
All items of sub head - 13 of DSOR-2021 (except banned items) 18
-
-
112375.16
... More
All items of sub head - 16 of DSOR-2021 (except banned items)
-
-
2229073.91
... More
Two rounds of through packingdoing all operations of SystematicThrough Packing For BG track with52KG / 60KG / 90R / 20 rail panels /3 rail panels / single rails / LWR railson PRC / Wooden / Metal sleepersetc. with any type of track structure ,including boxing and dressing ofballast provided for cushion 200mm /250mm / 300mm and stipulatedprofile for LWR / SWR curves / singlerails as per IRPWM / LWR manual asdirected by the Engineer - in -Charge including first and secondpacking at required interval ,squaring of sleepers ensuring correctspacing , gauge , alignment ,longitudinal and cross levels withboxing etc. complete to bring thetrack to required tolerances so as 19 tomake the track fit for the speed of50KMPH including all lead , lifts ,handling and re - handling etc. oftrack and points and crossing underworking traffic conditions or on newlylaid track as a complete job . NOTE :Payment schedule will be as under :( a ) 40 % payment will be made oncompletion of 1st.through packing . (b ) 10 % balance payment will bemade after picking up stacks &maintaining the track in goodgeometry up to one month aftercommissioning of line for traffic .. ( c) 30 % payment will be made oncompletion of 2nd through packingafter making the track toleranceswithin the range defined in specialconditions / specifications includingboxing , dressing and stipulatedballast profiling and making track fitfor the speed of 45 KMPH . ( d ) 20% payment shall be released afterone month from opening the trackfor rail traffic or handing over thetrack to open line , whichever isearlier including rectifying all thedefects as instructed by the Engineerat site.
50
2881
2881
... More
Putting of ballast in track uniformly from the stack lying along the cessas per 20 requirement including boxing ,dressing as per latest specificationsor as per directions of engineer - in -charge at all heights , depths ,ascends , descends , all type of xings or any other obstruction withcontractors own tools and plants ,labour complete job . Lead 0 to 20
50
337
16892.5
... More
Hiring of heavy earth machinery orheavy excavator like poclain fordredging of river for making cofferdam including all labour , leadingetc. all complete .
40
3004
120178
... More
Providing lighting arrangementduring night block to be availedbetween 20.00 Hrs. (night) to 6.00Hrs. (morning) in the section ofADEN/Spl on hiring basis withcontractors generator of minimum 5KVA capacity 6 halogen lamps of 500Watt operation and maintenance ofgenerator set & Halogen lamps withhis own labour, T&P transportationetc. The payment will be done foronly that day when Site Engineeractually required. Standbyarrangement has to be ensured byagency for any possible failure asblock may be burst on this account only
300
621
186348
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements