Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

SRDEN/C/MB acting for and on behalf of The President of India invites E-Tenders against Tender No 12-DRM-MB-19-20 Closing Date/Time 11/06/2019 16:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed. 1. NIT HEADER Name of Work Construction of boundary near station MB its approaches as measure to safeguard track and establishment avoiding encroachment in jurisdiction of ADEN/HQ/MB Bidding type Normal Tender Tender Type Open Bidding System Single Packet System Tender Closing Date Time 11/06/2019 16:00 Date Time Of Uploading Tender 11/05/2019 13:16 Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Advertised Value 18613097.34 Tendering Section DEN HQ Bidding Style Single Rate for Each Schedule Bidding Unit Earnest Money (Rs.) 243100.00 Validity of Offer ( Days) 45 Tender Doc. Cost (Rs.) 5000.00 Period of Completion 8 Months Contract Type Works Contract Category Expenditure Bidding Start Date 28/05/2019 Are Joint Venture (JV) firms allowed to bid No Ranking Order For Bids Lowest to Highest 2. SCHEDULE S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule A-SOR 200996.98 Above/ Below/Par 1 Please see Item Breakup for details. 158041.34 27.18 200996.98 Item Description:- All items of Ch. No. 1 (Earth work) of NR's Unified Standard Schedule of Rates 2010 except banned item S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-SOR 38937.98 Above/ Below/Par 2 Please see Item Breakup for details. 27992.80 39.10 38937.98 Item Description:- All items of Ch. No. 2 (Carriage of material ) of NR's Unified Standard Schedule of Rates 2010 except banned item S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule C-SOR 487634.65 Above/ Below/Par 3 Please see Item Breakup for details. 315315.00 54.65 487634.65 Item Description:- All item of Ch. No.3( Plain conc.) of SOR/2010 Except banned items S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule D-SOR 3301985.66 Above/ Below/Par 4 Please see Item Breakup for details. 2251456.20 46.66 3301985.66 Item Description:- Item No. 033061, 033063 (Supply of Cement) of Ch. No. 3 of NR's Unified Standard Schedule of Rates 2010 . S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule E-SOR 8954868.84 Above/ Below/Par 5 Please see Item Breakup for details. 5756907.00 55.55 8954868.84 Page 1 of 8 Run Date/Time: 11/05/2019 13:16:51 MORADABAD DIVISION-ENGINEERING/NORTHERN RLY TENDER DOCUMENT Tender No: 12-DRM-MB-19-20 Closing Date/Time: 11/06/2019 16:00 Item Description:- All items of Ch. No. 4 (RCC) of NR's Unified Standard Schedule of Rates 2010 except banned item S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule F-SOR 5628673.23 Above/ Below/Par 6 Please see Item Breakup for details. 4018184.77 40.08 5628673.23 Item Description:- Item No. 045014(Reinforcement) of Ch. No. 4 of NR's Unified Standard Schedule of Rates 2010 . 3. ITEM BREAKUP Schedule Schedule A-SOR Item- 1 All items of Ch. No. 1 (Earth work) of NR's Unified Standard Schedule of Rates 2010 except banned item S No. Item No Description of Item Unit Qty Rate Amount Earth work in excavation as per approved drawings and dumping at embankment site or spoil heap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of excavation to centre of gravity of spoil heap: the lift to be measured from natural g

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.