Northern Railway Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Northern Railway - NR Tender
Civil And Construction
Civil Works Others
Ireps
Opening Date9 Jan 2024
Closing Date31 Jan 2024
Tender Amount₹ 23,14,01,908.83
Costs
EMD
₹ 13,07,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Provision Of Covering At Lhs No. 6, 9, 11, 12, 14, 20, 21, 22a, 29, 34, 42, 50, 51, 52, 53, 54, 56, 57, 58, 59, 64, 65, 66, 67 & 68 = 25 Nos Along With Boring & Cleaning Of Sump Well, hump & Water Proofing In The Section Of Aden/smql.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
NIT-41-23-24-W-2-DELHI DIVISION-ENGG/NORTHERN RLYTender No
NIT-41-23-24-W-2Tender Authority
Northern Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
All items appearing in chapter 4 i.e. ''Concrete work'' as per CPWD Delhi Schedule of rates ( Volume-I & II ) 2021 edition (Corrected upto date).
-
-
2572568.38
All items appearing in chapter 5 i.e. ''Reinforcement cement Concrete '' as per CPWD Delhi Schedule of rates ( Volume-I & II ) 2021 edition (Corrected upto date).
-
-
4366549.56
All items appearing in chapter 6 i.e. ''Masonary work '' as per CPWD Delhi Schedule of rates ( Volume-I & II ) 2021 edition (Corrected upto date).
-
-
7367949.95
All items appearing in chapter 10 i.e. ''Steel Work'' as per CPWD Delhi Schedule of rates ( Volume- I & II ) 2021 edition (Corrected upto date).
-
-
108606212.39
All items appearing in chapter 12 i.e. ''Roofing'' as per CPWD Delhi Schedule of rates ( Volume-I & II ) 2021 edition (Corrected upto date).
-
-
27990001.33
Chipping of unsound weak concrete, removing all spalled concrete, cleaning of rust from affected 1 reinforcement bars wherever required with wire brush. Providing and applying modified anti-crossing coating on already cleaned bars / Dosage: - Min 1.6/ sqm/layer or eq. material as per direction of engineer in charge. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
4061
350
1422162.2
Providing and applying epoxy resin bonding agent like SIKADUR 32 LP or eq. on the entire chipped 2 surface Flexural strength: 30-35 N/mm2 Tensile strength: 16-20 N/mm2 or eq. material of reputed brands as per direction of engineer in charge.2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
4061
556
2258728.2
Providing and applying microconcrete for repair of small damaged patched in RCC structure. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
18568
139
2581880.4
Providing and applying a pre-batches one component polymer modified cementitious mortar as top 4 cover over the chipped surface product requirement yield approx. 0.84ltr./ kg system requirement: Compressive strength >=50 n.mm2 (28days) according to ASTM C 109 Flexural strength: 3N/MM2 (7 days) according to ASTM C293-79. All Works shall be done as per engineer in charge. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
12765
309
3944385
"Injection Grouting with Conbextra EP-10 or eq. through the fixed NRV as per the direction of the Eng-in-charge. Conbextra EP-10 two component High strength epoxy grout cost including of all material labour, at 5 all heights including providing and fixing of nipple / NRV of required size and remocing / repairing of nipple complete. Density : Approx 1050 kg/m3 Tensile Strength : 20N / mm2 @ 7 days Flexural Strength : 40N. mm2 @ 7 days Compressive Strength : 45 N/mm2 @ 1 Day, 60 N/mm2 @ 3Days, 80 N/mm2 @ 7 Days. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
4063
4282
17400772.62
Supply and apply 2 component, elastic, low viscous, solvent free polyurethane injection resin based system for permanent sealing that does not need the presence of water for hardening reaction rapid reaction. 6 Project requirement, viscosity of mixture< 100m Pas(at + 20 X). Capable of penetrating cracks > 0.2 mm wide a CE conformity conformance label that product is approved to the essential requirement and under market surveillance product Make SIKA, NORMET, CAC, BASK or Equivalent. 100% PAYMENT shall be released only after satisfactory completion of work 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
18513
2214
40997038.5
Providing and injection micro fine injection grout panel ZL 10 or equivalent in the RCC plinth of tract 7 under high pressure upto 30 bar or as per site requirement during non traffic hours. Rates inclusive of providing, fixing cutting of non-return packers of required size and repairing the surface with polymer mortar complete at all heights.2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
3249
741
2409458.4
Cleaning of surface to remove existing plaster (if any), dust and loosely adhering particles completely and repairing all Cracks & joints with polymer modified high strength mortar. Providing and laying waterproofing treatment by applying IZONIL Hard - 100% waterproof, breathable and drying, fiber reinforced 8 ready to use plaster in two layer at an average thickness of 15 mm (7.5 + 7.5mm), sandwiched with 110 GSM glass fiber mesh as per manufacturers specification, in line and level and finished smooth. Prior to application of Izonil Hard, entire surface should be water cured and bring to SSD condition. For increased adhesion , it is recommended to apply a cement slurry coat on brick wall before izonil application. The IZONIL waterproofing system shall be cured for 5 to 7 days and curing should start within 5-6 hours of application. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
1160
1334
1548460.8
"Description: Hiring of Tractor with trolly/tractor trailer/Hydraulic trolley (for carrying 13 meter rail/switch etc) including driver, fuel lubricants, major/minor repair, salary of driver, toll taxes and all other taxes, complete operation & maintenance Vehicle is required for leading of T&P, P.Way fittings, sleepers, cement and other Rly. Material and man power and for earth work in cutting & filling removal of sand dunes near track, leveling of ground etc. The vehicle shall run on Pucca, Katcha road and along the track. The contractor shall arranged road permit for vehicles for the state of Haryana, Punjab, UP & Delhi. complete job, So nothing extra will be paid whatsoever the case may be."
580
782
453902.2
Item rate for hire charges of Poklain Machine (Excavator/pneumatic breaker) for working day and 10 night, for digging of earth/ misc. surface under the track and breaking of RCC/CC during block for early completion of work required, including loading, unloding of earth, malba off from the site etc, including all charges, such as fuel, carriage, driver's wages, with all labour, material as a complete job. so nothing extra shall be paid to affect this item whatsoever the case may be.Deployment of Poclain shall be as per direction of EIC.
580
4548
2638182.2