New Okhla Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
New Okhla Industrial Development Authority Tender
Eprocure
Opening Date22 Sep 2020
Closing Date28 Sep 2020
Tender Amount₹ 1,98,68,733
Costs
EMD
₹ 3,98,000Document Cost
₹ 5,310Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NOIDA_513931_1Bid Award Id
ViewTender No
13/GM/R/SM/WC-7/ET/2020-21Tender Authority
New Okhla Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.noidaauthorityonline.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Note : 1) Excess/less cement used than specified in this item is payable/ recoverable separately. All works up to plinth level. M-10 grade plain cement concrete (cement content considered @ 220 kg/cum).
765
-
7761.25
... More
P/L Separation Membrane of impermeable plastic sheeting 125 micron thick
7650
-
16.05
... More
Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for separately).(Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately).
1224
-
8663.05
... More
Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content use dis payable /recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum)
1224
-
69.75
... More
Providing and fixing in position 12mm thick bitumen impregnated fiber board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints.
24600
-
557.65
... More
Carriage of material by mechanical transport including Loading, unloading and stacking. Earth…3Km Lead (Rate for 2950 Mtr lead as per AOR ).
2940
-
129.23
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements