Directorate Of Urban Local Bodies Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Eprocure
Opening Date23 Nov 2021
Closing Date2 Dec 2021
Tender Amount₹ 26,29,914 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in foundation in ordinary soil( Loam,clay or sand) including lift up to 1.5 M,and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplush earth as directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches (Where machine con not reach/move) For building work only,(Excluding royalty)

149.62

-

120

... More
Earth work in filling upto distance 5.00 km lead with cartage/royalty for levelling dressing including supply of all material,labour and T&P etc.required for proper completion of work

37.05

-

303.5

... More
Cement Concrete with 4cm gauge approved brick ballast coarse sand and cement in proporation of 1:4:8 inculuding supply of all materail labour and T&P etc.required for proper completion.

33.94

-

3350

... More
M-150 brick work in 1:6 with (one cement and six fine sand of 1.25 F.M mortar) in foundation and plinth inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work.

41.12

-

4500

... More
M-150 brick work in 1:6 with (one cement and six fine sand of 1.25 F.M mortar) in Superstructure i/c cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work.

107.72

-

4740

... More
12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material ,labour and T&P etc.required for proper completion of work

717.65

-

178

... More
Cement concrete with 4cm gague approved stone ballast coarse sand and cement in proporation of 4:2:1 but with 2cm gaguge stone gritt instead of 4cm gauge stone ballast inculding supply of all materials labour and T&P etc for proper completion of work.As par S.I No-279A Ch.-05

12.05

-

6350

... More
R.C.C raft foundation work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost.

29.75

-

6450

... More
R.C.C lighter beam having spans upto 6M work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:2:4 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost.

39.74

-

7850

... More
R.C.C columns work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost.

6.51

-

8150

... More
Mild steel or iron in plain work such as concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work.

73.67

-

6150

... More
Providing & fixing rolling Shutter of approved made make of 80x125mm cold rolled MS lath lock including supply of all material ,labour and T&P etc.required for proper completion of work

92.07

-

2100

... More
Supply & fixing of Coil spring for Rolling shutterincluding supply of all material,labour and T&P etc.required for proper completion of work

34.1

-

740

... More
Supply & fixing of Hood cover for Rolling shutter including supply of all material ,labour and T&P etc.required for proper completion of work

34.1

-

760

... More
Supply & fixing of Ball bearing for Rolling shutter including supply of all material ,labour and T&P etc.required for proper completion of work

11

-

490

... More
Providing wall Putty on new srface with approved quality materail of berger/J.K/Birla or similar make 2 coat

717.65

-

58

... More
Applying Oil Bond distempering/ snowcem with primer coatincluding supply of all material ,labour and T&P etc.required for proper completion of work

717.65

-

84

... More
Applying two coat enaimel paint over one coat primer including supply of all material ,labour and T&P etc.required for proper completion of work

424.08

-

72

... More
Add Internal & External Electric Fitting @ 8.00%

1

-

194808



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.