Military Engineer Services Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Military Engineer Services - MES Tender
Automobiles and Auto Parts
Eprocure
Opening Date6 Jan 2024
Closing Date8 Feb 2024
Tender Amount₹ 4,59,800
Costs
EMD
₹ 9,196Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_636069_1Bid Award Id
ViewTender No
8100/B/787/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
ditto- as above item No 3.00 but for Motor Cycle Hero complete all as specified and as directed
6
-
-
(A) Tata Xenon
-
-
-
Servicing and Repair/Maintenance of Vehicles- Tata Xenon each comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP(Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed
Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.
2.Cost of Engine Oil included in quoted rate.
3 Cost of Brake oil, gear oil and coolant included in quoted rate. 4 Servicing of vehicle shall be carried out at authorised workshop only.
5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
1
-
-
Air filter ,Oil filter and Fuel filter each set of three as per existing make and type
1
-
-
Clutch and pressure plate set including clutch bearing and clutch cylinder,Cluthch Paddle complete as per existing make and type
1
-
-
Head light assembly complete with Bulb and connection complete as per existing make and type
1
-
-
Fog lamp
2
-
-
Brake/ Back light Assy as per existing make and type
2
-
-
Indicator Assy as per existing make and type
2
-
-
Wipper Assy with blade complete as per existing make and type
1
-
-
Door Lock assembly as per existing make and type
1
-
-
Water pump assembly
1
-
-
Coolant bottle with pipe
1
-
-
Wheel Arch Guard cover front and rear including clip and bolts
2
-
-
Mud pad of best quality
2
-
-
Side looking mirror of side doors of best quality
2
-
-
Fan v belt as per existing make and type
1
-
-
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items.
(a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
1
-
-
M & L for repair of alternator including repair/replace of rectifier assembly and repair/replace of rotor assembly complete all as specified and as directed
1
-
-
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
1
-
-
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:-
(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
1
-
-
Master cylinder complete
1
-
-
Supply and replacement of fuel pump assembly complete set including other item for fittings complete all as specified and directed.
1
-
-
Taking down of radiator complete assembly and repair of radiator including welding/brazing works and replacement of gaskets and seal other items as required all as specified
1
-
-
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:-
(a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
1
-
-
Replacement of seat cover complete set and stitching work complete all as specified and directed
1
-
-
Supply and fixing of foot mat for Vehicle-Tata Xenon complete all as specified and directed
1
-
-
Floor matting best quality
60
-
-
Supply and Fix of injector assembly complete set for Tata Xenon including taking down old complete all as specified and directed.
4
-
-
Supply and fixing of Horn assembly complete including wiring connection and fixing
1
-
-
Repair to gear box including bush repair/repalce and greasing etc. Complete.
1
-
-
Repair of puncture of tube inner
2
-
-
(B) Eicher 10.70/10.75
-
-
-
Servicing and Repair/Maintenance of Vehicles- Eicher 10.70/10.75 each comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed.
Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.
2.Cost of Engine Oil included in quoted rate.
3 Cost of Brake oil, gear oil,diffrential oil and coolant included in quoted rate. 4 Servicing of vehicle shall be carried out at authorised workshop only.
5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
1
-
-
Air filter ,Oil filter and Fuel filter each set of three as per existing make and type
1
-
-
Clutch and pressure plate set , including clutch cylinder , Clutch bearing complete all specified and directed.
1
-
-
Head light assembly complete with Bulb and connection complete as per existing make and type
1
-
-
Head light bulb Helogen 12 volt 60 watt as per existing make and type
2
-
-
Break/ Back light Assy as per existing make and type
1
-
-
Indicator Assy as per existing make and type
1
-
-
Fog lamp
1
-
-
Wipper Assy with blade complete as per existing make and type.
1
-
-
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items.
(a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
1
-
-
M & L for repair of alternator including repair/replace of rectifier assembly and repair/replace of rotor assembly complete all as specified and as directed
1
-
-
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
1
-
-
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, Hub greasing, brake work including replacing the following items:-
(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
1
-
-
Master cylinder complete
1
-
-
Repair of fuel pump and testing on testing bench reassembling after repair and replacing with following items:-
(a) Valve lifter -01 No (b) Spring -01 No and other items as required
1
-
-
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:-
(a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
1
-
-
Repair of puncture of tube inner complete all as specified and directed
2
-
-
Repair to gear box including supply of gear shifting assembly and bush repair/repalce and greesing etc. Complete.
1
-
-
Supply and Fix PVC Bucket of Hydra complete all as specified and directed
1
-
-
(C)Staff Car Ambassdor
-
-
-
Servicing and Repair/Maintenance of Vehicles- Ambassdor car Make- Hindustan comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed. Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.
2.Cost of Engine Oil included in quoted rate.
3Cost of Brake oil, gear oil and coolant inluded in quoted rate. 4 Servicing of vehicle shall be carried out at authorised workshop only.
5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
1
-
-
Air filter ,Oil filter and Fuel filter each set of three as per existing make and type
1
-
-
Car polish 200gm
1
-
-
Repair/replacement of electronic motorized fuel pump assembly incl dismentling of old unsv complete all as specified and directed.
1
-
-
Clutch and pressure plate set , including clutch cylinder , Clutch bearing complete all specified and directed.
1
-
-
Head light assembly complete with Bulb and connection complete as per existing make and type.
1
-
-
Head light bulb Helogen 12 volt 60 watt as per existing make and type.
2
-
-
Break/ Back light Assy as per existing make and type
1
-
-
Indicator Assy as per existing make and type
1
-
-
Fog lamp
1
-
-
Wipper Assy with blade complete as per existing make and type.
1
-
-
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items.
(a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
1
-
-
M & L for repair of alternator including repair/replace of rectifier assembly and repair/replace of rotor assembly complete all as specified and as directed
1
-
-
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
1
-
-
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, Hub greasing, brake work including replacing the following items:-
(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
1
-
-
Master cylinder complete
1
-
-
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:-
(a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
1
-
-
Repair of puncture of tube inner complete all as specified and directed
2
-
-
Repair to gear box including supply of gear shifting assembly and bush repair/repalce and greesing etc. Complete.
1
-
-
Supply and fix in repair seat cover valvet type including stitching complete all as specified and directed
1
-
-
(D)Motor Cycle Royal Enfield 350 CC/Hero
-
-
-
Servicing and Repair/Maintenance of Vehicles- Motor cycle Royal Enfield 350 CC two times at interval of five months comprising checking and repair/replacement of unserviceable spares of engine, gear box, FIP(Fuel Injector Pump), suspension system ,braking system , Chain and chain cover, Kick Assembly, replacement of filters and greasing of all wheels, of Vehicles including dismantling / Replacing of defective parts with new parts at work shop complete all as specified and directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate.
2.Cost of Engine Oil included in quoted rate.
3 Cost of Brake oil, gear oil included in quoted rate. 4 Servicing of vehicle shall be carried out at authorised workshop only.
5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
1
-
-
Ditto- but for Motor cycle -Hero/Bajaj Platina
3
-
-
Brake shoe
2
-
-
Clutch plate
2
-
-
Brake cable
1
-
-
Accelerater Cable
1
-
-
Clutch wire cable
1
-
-
Air Filter
2
-
-
Head light assly
1
-
-
Spark Plug
2
-
-
Indicating assly
8
-
-
Horn complete assembly
2
-
-
Speedometer Cable
1
-
-
Back light assembly
1
-
-
Lock and key of fuel tank & luggage/dak box
1
-
-
Labour charge for seat repair including replacement of seat cover complete all as specified and directed parts
1
-
-
S&F retrading of tyre Eicher/TATA Xenon/Staff Car complete all as specified and directed
8
-
-
S&F Battery 12 volt 80 AH complete all as specified and directed.
2
-
-
Repair of Air compressor Assembly and replacement of Display unit and repair of control wiring including replacement of Pressure pipe 5 mtr long complete all specified and directed.Note :- cost of Display unit ,pressure pipe are included in quoted rate.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements