Military Engineer Services Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Military Engineer Services - MES Tender
Civil And Construction
Eprocure
Opening Date16 May 2020
Closing Date1 Jun 2020
Tender Amount₹ 28,06,237 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 84,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_MES_338989_2Bid Award Id
ViewTender No
8803/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
(c) Cylinder Nos will be scraped & spray painted before returning to MES.
-
-
-
Hydrostatic stretch test of chlorine gas cylinders of 100 kg capacity from Controller of Explosive or firms licensed from them will be submitted, complete all as specified alongwith test certificate.
20
-
-
Leakage cum pressuure test of chlorine gas cylinders of 100 kg capacity before filling of chlorine gas into cylinder alongwith test certificate will be submitted complete all as specified and directed.
20
-
-
Replacement of defective valve complete by OEM of chlorine gas cylinders with new valve of bronze silicon body with monel spindle ISI marked all as specified and directed by Enginer-in-Charge.
15
-
-
Supply only O-Tolodine regent solution in 500 ml bottle as per Sample approved complete all as specified and directed.
15
-
-
Supply and replace residual chlorine test kit to show 2 ppm.as per Sample approved by Engr in Charge.
15
-
-
Supply of Calcium hypochlorite 65-70% chlorine content packed in 45 Kg drum complete all as specified and directed. Make : Aquafit, DECLIBAC or equivalent
40
-
-
Supply only Vikram PAC (Poly Aluminium chloride -AC 100S) inorganic soluble polymer powder packed in 25 Kg plastic bag complete all as specified and directed.
250
-
-
Supply only Chlorine cylinder valve key complete all as specified and directed.
10
-
-
Supply only Alum crystal complete all as specified and directed.
500
-
-
Supply only chlorine leak test solution complete all as specified and directed.
3
-
-
Leak detecting of chlorine gas from cylinder/chloronome plant with necessary repairs to prevent / control the leakages incl removing leaked gas cylinder from the installation and depositing in AGE E/M (W/S) store yard complete all as specified and directed. Note:-The complaint of leakage will attended by contractor within 01 hour otherwise penalty @Rs 500/- per complaint per hour will be imposed .
6
-
-
S&F in repair of ejector assembly with Non return valve suitable for pressure feed type chloronome plants complete all as specified and directed. Make : JESCO
3
-
-
S&F in repair of ejector assembly suitable for pressure feed type chloronome plants complete all as specified and directed. Make : Capital control or eqvt.
2
-
-
S&F in replacement of Fully automatic star delta starters, 3 phase ,415 v, suitable for 12 to 17.5 HP motor incl taking out old starter of any type all as specified and directed by engr-in -charge Make:- L&T/C&S or eqvt
3
-
-
S&F in repair of DOL starter ,3 phase ,415 v, suitable for 2 to 5 HP motor incl taking out old starter of any type all as specified and directed by engr-in -charge Make:- Havells/C&S
6
-
-
S&F in repair of multistage booster pump incl repair of existing foundation complete all as specified and as directed.
Make:- NE or equivalent as per sample
4
-
-
Dismantiling electric motor upto 3HP from booster pump and foundation manually or mechanically and transporting to workshop for repair and back to site incl loading/ unloading complete, reinstallation, refixing, reconnecting complete all as specified and as directed.
6
-
-
Repair to 3 phase motor upto 3HP by opening the electric motor carefully, removing all burnt/wornout coils, cleaning the slots and rewinding with super enameled copper wire of existing size including varnishing two coats, drying, packing material and reassembling the electric motor complete all as specified and as directed.
6
-
-
S&F in repair of ball bearing of electric motor as per existing sample incl greasing etc complete all as specified and as directed.
5
-
-
Taking out of booster pump from foundation/electric motor manually or machnically and transporting to workshop for repair and back to site incl reinstallation refixing and reconnecting after necessary repair complete all as specified and as directed. Note :- Repair/Replacement of unserviceable parts will be measured and paid under relevent items
6
-
-
S&F in repair of Star coupling suitable for 2 to 5 HP multi stage pump set, complete all as specified and as directed.
MAKE:- NE or equivalent as approved by GE
5
-
-
S&F in repair of GM impeller for booster pump motor ,3 phase 415 v ,2HP/3HP capacity complete all as specified and as directed.
10
-
-
Taking down the chlorine plant of make JESCO from chlorine cylinder , opening it to detecting fault and repiar/replacement of unserviceable parts, overhauling and refixing the same after completion of job including testing complete all as specified and as directed.
4
-
-
Note :- Repair/Replacement of unserviceable parts will be measured and paid under relevent items
-
-
-
S&F in repair of following parts of Chlorine Plant complete all as specified and as directed. Make JESCO
-
-
-
(a) Vaccum regulator and measuring glass with 'O' ring set.
3
-
-
(b) Inlet valve
3
-
-
(c) 'O' ring set for measuring glass
4
-
-
(d) Clamping ring
3
-
-
(e) Valve body
3
-
-
(f) Wate pressure gauge round type 75mm dia. Suitable for 6 to 10 kg/cm2 pressure
4
-
-
(g) Valve cap
6
-
-
(h) Ball guide
4
-
-
(j) Spring support
4
-
-
(k) Filter
3
-
-
(l) Presssure spring
3
-
-
(m) Valve seat
3
-
-
(n) Set screw
4
-
-
(o) Adjust screw upto 200 gms /hr glass
8
-
-
(p) Diaphragm disc
4
-
-
(q) Ring diaphragm
3
-
-
(r) Main chlorinator diaphragm
4
-
-
(s) Yoke clamp assembly for chloronome plant
3
-
-
(t) Main diaphram with plate assembly
4
-
-
Taking down the ejector assembly of chlorine plant make JESCO, opening it to detecting fault and repiar/ replacement of unserviceable parts, overhauling and refixing the same after completion of job including testing all as specified and as directed. Note :- Repair/Replacement of unserviceable parts will be measured and paid under relevent items.
4
-
-
S&F in repair of following parts of ejector assembly of Chlorine Plant complete all as specified and as directed. Make JESCO
-
-
-
(a) Ejector nozzle pressure feed
4
-
-
(b) Ejector diaphragm assembly
3
-
-
(c) Ejector spring assembly
3
-
-
(d) Ejector diaphram nut
8
-
-
Taking down the chlorine plant of make capital control /chlorinator from chlorine cylinder , opening it to detecting fault and repiar/replacement of unserviceable parts, overhauling and refixing the same after completion of job including testing all as specified and as directed. Note :- Repair/Replacement of unserviceable parts will be measured and paid under relevent items
3
-
-
S&F in repair of following parts of Chlorine Plant complete complete all as specified and as directed. Make : Capital Control
-
-
-
(a) 'O' ring set
3
-
-
(b) Flow meter top fitting
3
-
-
(c) Flow meter bottom fitting
3
-
-
(d) Flow meter assembly
2
-
-
(e) Diaphragm assembly
3
-
-
(f) Relief spring
2
-
-
(g) Flow tube
2
-
-
(h) Yoke assembly
3
-
-
(j) Filter
3
-
-
(k) Rate valve assembly
3
-
-
(l) Tubing connector
3
-
-
(m) Flow meter top gasket
2
-
-
(n) Flow meter bottom gasket
2
-
-
Taking down the ejector assembly of make Capital control , opening it to detecting fault and repiar/replacement of unserviceable parts, overhauling and refixing the same after completion of job including testing all as specified and as directed. Note :- Repair/Replacement of unsv parts will be measured and paid under relevent items
3
-
-
S&F in repair of following parts of ejector assembly of Chlorine Plant complete all as specified and as directed. Make : Capital Control
-
-
-
(a) Ejector gasket
2
-
-
(b) Ejector diaphragm assembly
2
-
-
(c) Ejector top block
2
-
-
(d) Ejector bottom block
3
-
-
(e) Ejector Nozzle
2
-
-
(f) Ejector throat
2
-
-
(g) Ejector support diaphragm
2
-
-
(h) Ejector clamp
2
-
-
S&F in repair Y type strainer complete all as specified and as directed.
2
-
-
S&F in repair of PVC stop valve (check valve ) 3m bore suitable for cylinder mounted chloronome plant, fixed in repairs complete all as specified and as directed.
5
-
-
S&F in repair of nylon braided PVC pipe 25mm bore heavy duty complete all as specified and as directed.
45
-
-
S&F in repair of teflon pipe 6mm internal dia. and 10mm outer dia complete all as specified and as directed.
45
-
-
S&F in repair of PVC tapper nipple suitable for suction block of pressure feed chloronome plant size 20mm bore and 100mm long complete all as specified and as directed.
6
-
-
Supply only soda ash complete all as specified and as directed.
250
-
-
Supply only Copper sulphate complete all as specified and as directed.
350
-
-
Supply only Bleaching powder Make- Kaneria chemicals
450
-
-
Supply only unslaked lime complete all as specified and as directed.
600
-
-
Provn of chemical testing of water at source (i.e Pump House) as per relevent IS codes from IIT/Regional Govt lab/IRTC/other Govt approved lab seperately for each Pump House twice complete all as specified and directed. (i) The sample of water shall be taken in presence of Engr-in-Charge for testing. (ii) Test report of water shall be submitted in original and payment of the item shall be made on production of test reports. (iii) 1st test of water at each pump house will be got carried out within one month of acceptance or else a penalty of Rs 500/- per test will be imposed and second test shall be carried out after six months of first test.
28
-
-
Taking out connection of Chlorine / Altoch dosing system , detecting fault and repair /replacement of unserviceable parts and refixing same after completion job and connecting dosing system and testing complete all as specified and directed. Make : Aquafit, Chloromax or eqvt. Details of Spares are as under :-
8
-
-
(a) S&F in repair rotor assembly with bearing brackets and tolerance rings suitable for decree dosing pump complete all as specified and directed.
4
-
-
(b) S&F in repair pump tube suitable for dosing pump complete all as specified and directed.
6
-
-
(c) S&F in repair injectior assembly suitable for dosing pump complete all as specified and directed.
6
-
-
(d) S&F in repair duckwill suitable for dosing pump complete all as specified
6
-
-
(e) S&F in repair diaphragm assembly suitable for dosing pump complete all as specified
5
-
-
(f) S&F in repair weighted suction line stainer suitable for dosing pump complete all as specified and directed.
8
-
-
Note :- Repair/Replacement of unserviceable parts will be measured and paid under relevent items
-
-
-
M&L for Cleaning & removing, dewatering all scale & dirt etc from Over Head Reserviour and under ground reserviour of different capacities incl all inside pipes of any size. Details of process to be carried out in the following manner:-
(a) Stage-I : Drain out the remaining water from the tank.
(b) Stage-II : Cleaning of walls, ceiling and floor of tank by scrapping with wire brush and washing with water.
(c) Stage-III : Draining out of muddy water and sucking out of left over mud and dirt throughly and making the tank cleaned from dirt to the last drop.
(d) Stage-IV : Spraying of Anti bacterial sterlising agents on the inner walls and ceiling of the tank. (e) During this process it must be ensured that not a slightest trace of any algae, moss or dirt is left out at OHTs.
-
-
-
(a) RCC overhead reservoir one lakh gallon capacity 50 to 60 feet staging. (No of OHTs -07 )
14
-
-
(b) RCC overhead reservoir 50000 gallon capacity 50 to 60 feet staging (No of OHTs -03 )
6
-
-
(c) RCC overhead reservoir 25000 gallon capacity 50 to 60 feet staging (No of OHTs -04 )
8
-
-
(d) Underground sump/reserviour of capacity 2 lakh gallon at MH Bareilly. (No of Sump-01 )
2
-
-
NOTE:- (a) All the safety equipments, T&P for workers will be provided by the contactor. Cleaning of OHR/UG sump is in every six month or contracor is responsible to clean all OHR/UG Sump twice in 11 month period of contract. (b) The above process will be completed by the contractor in 10 hours at any cost to avoid water supply breach on 2nd day.
-
-
-
M&L for preparation of old concrete/plastered surfaces by scrapping , brooming etc and applying two coats of exterior emulsion weather proof paint (Apex of Asian paints or equivalent) over dome, wall, columns ,beams including all pipelines etc of overhead reservoir using scaffolding complete all as specified and directed for the following RCC over head reservoir:- Note :- Colour status shall be as under :-
(i) Rising main - Blue colour.
(ii) Delivery main - Green colour. (iii) Washout main - Red colour.
(iv) Overflow main - Yellow colour.
-
-
-
(a) RCC overhead reservoir one lakh gallon capacity 50 to 60 feet staging.
7071.36
-
-
(b) RCC overhead reservoir 50000 gallon capacity 50 to 60 feet staging
2044.57
-
-
(c) RCC overhead reservoir 25000 gallon capacity 50 to 60 feet staging
2872.68
-
-
M&L for installation of Digital water level indicator device,with 19mm size digit display including probe unit ,five stage magnetic sensor concealed in SS tube of required length,controlling box including systems incorporated with stage signal,high & low alarm, pump automation as directed capable to one tank from one pump complete all as specified and directed by Engr in Charge. Make : SECO/SATYA SAI or equivalent
Technical Specification Prinipal of operations : Negative sequence voltage sensing Systems Voltage & frequency :- 415 +/-20% , 50HZ +/- 5% Contact rating 1 Amp at 415 V AC
Trip time delay 3 to 5 seconds Temparature Range : -5 degree C to 50degree C Suitable for - Upto 18 to 25 mtrs OH/UG sump Humidity : Up to 95 % R.H H.V test : 2 KV AC (RMS) 1 min between live parts & body Mode of Operation : Auto/manual
6
-
-
M&L for laying in ground Wire from probe unit to controller of 10 pair PVC copper conductor (0.5 sqmm) all as specified and directed by Engr in Charge.Make-SECO/SATYA SAI or equivalent (Note:-this item shall be measured in accordance with the quantity required for item No 44, besides shall also be measured as required in existing level indicators)
400
-
-
Overhauling and reparing to Monobloc centrifugal pumping set of capacity 23 LPS/18400 GPH ,20 HP, 50 Hz,32 Amp ,size 100 x 75 mm ,S.No.BP-001325 and BP-010068 at filtration plant Make-Beacon,with connected accessories to put the plants in perfect working condition and testing as test sheet given by Engineer in Charge, alligning CF pumps and motor including balancing of motor, rewinding of motors ,varnishing of stator winding and painting of entire pump set with two coats of synthetic enamel paint including preparation of surfaces as required, renewal of nuts,bolts and washers, renewal of gland and seats, greasing and oiling, and renewal of unserviceable parts.
2
-
-
M&L for replacement of sluice valve class PN-1.6 heavy duty flanged ends drilled ISI marked confirming to IS: 14846 suitable for following bore pipe, wheel operated (Handle) with high tensile stainless steel spindle, including nuts, bolts and jointing with jointing materials etc. complete including taking out old existing unservicable sluice valve including making arrangement for safe working all as specified and directed. Make: BIR, KIRLOSKAR or equivalent
-
-
-
(a) 150 mm dia
6
-
-
(b) 100 mm dia
6
-
-
S&F in rep foot valve of 100 mm at filteration plant complete all as specified and as directed.
2
-
-
S&F wood core nylon brush of size 24" for swimming pool complete all as specified and as directed
2
-
-
M&L for taking out unserviceable submersible sewage pumping set of cap 2 HP to 12.5 HP complete with column pipe any capacity and any type from existing bore well carefully without damaging the p/set including connecting parts and lowering the same after repair including provision of suitable size of nut & bolts with washer and suitable packing for column pipes and connection of submersible cable complete all as directed by Engineer -in-Charge. NOTE: (1) Chain pully block and clamps etc shall be provided by the contractor. (2) Necessary safety pracaution will be responsibility of the contractor.
7
-
-
M & L for dismantling of non clog type submersible motor for sewage pumping and taking out unserviceable spares and rewinding of submersible motor of following capacities with insulated copper winding wire including sleeves as per original company and replacement of worn out parts, including grinding & polishing of rotor sleeves and refixing, testing complete all as specified & directed by Engr in Charge.
-
-
-
(a) 12.5 HP motor
4
-
-
(b) 02 HP motor
3
-
-
S&F the following parts of the non clog type sewage submersible pump and motor for capacity between 02 to 12.5 HP of original company as approved by Accepting Officer.
-
-
-
(a) Bowl bush
5
-
-
(b) Impeller
6
-
-
(c) Neck ring
12
-
-
(d) Shaft sleeve
6
-
-
(e) Pump shaft
2
-
-
(f) Coupling
3
-
-
(g) Coupling key
3
-
-
(h) Impeller key
3
-
-
(j) Stud with nuts
6
-
-
(m) Thrust bearing
5
-
-
(n) Lower housing bush
5
-
-
(o) Upper housing bush
5
-
-
(p) Rotor shaft sleave
2
-
-
(q) Drain plug
4
-
-
(p) Water seal
6
-
-
(s) CI Bowl
4
-
-
(t) Rotor Shaft
2
-
-
De-watering of sewage sump/well 18 feet deep by portable pumping set and manually taking out waste materials like soil, sludge and mud etc from inner sump and outer housing sump using labours and equipment etc and depositing the waste materials at low lying ares by digging pit and taking out unserviceable spares complete all as specified and directed.
4
-
-
Opening of electric connection of compressed air blower 7.5 KW, 3 Phase, disconnecting the motor and air pipes etc, transporting to authrised service station/workshop and back for following repairs. (Note Repairs shall be carried out through authorised service agent/ firm)
4
-
-
(a) Overhauling of blower is to done with replacement of all US parts like bearing/bushes, pinion, oil sels, air filter etc incl replacement of gaskets, US nuts, bolts and washers etc
4
-
-
(b) Dismantling of motor, 3 phase, 7.5 KW taking out burnt winding wire from stator, cleaning all slots properly rewinding the motor with proper guage of super enamelled winding wire and varnishing properly incl baking and providing insulation and packing properly re-assembling the motor with blower and installed at its proper position and testing the same
4
-
-
M&L for removing unserviceable media of MBBR from the tank and supply of filling fresh media of MBBR in the main tank of reactor as specified of existing /suitable make with following specification:-
(a) Effective surface area of media approx - 400 Sqm/ Cum (b) Media heigh approx - 15 mm/10 meter (c) Media dia approx - 22mm (d) Weight per unit surface area approx - 0.37 Kg / Cum (e) Voidage - 98% (f) Density - 0.93 gm/ Cucm (g) Media fill range - 25- 55% of Volume
3
-
-
M&L for cleaning of seconday tank of the plant reamoving all waste material washing with the fresh water complete all as specified and directed.
2
-
-
S&F in repairs 3 pole power contractors type MNX 18, 415 volts 50HZ size Fr1 AC3 rating 18A , AC1 rating 30A aux contacts 1 NO +1 NC complete all as specified and as directed. Make : L&T and equivalent.
10
-
-
S&F in repair Mini motor protection relay for protections of earth fault, thermal overload locked rotor, single phasing ,current unbalance phase sequence reversal, under current incl inbuilt CT's 4A to 22 A complete all as specified and directed. Make : L&T & eqvt
6
-
-
M&L for glow sign board (box type) LED of required size made out of MS sheet of suitable size with flex sheet fixed on front and quality marked with details of Pump House etc on front and rear with different colours including provision of LED power- fittings & fixtures in equal distance to illuminate board including connections with 2.5 sqmm single core stranded copper conductor cable and writing with 10 mm size letters as specified and directed by Engr in Charge.
6
-
-
S&F in replacement of single phase preventer in motor control panel 415V complete all as specified and as directed. Make : L&T, Minilac or eqvt
6
-
-
M&L for cleaning of busbar and de carbounising of panel board and replacement of unsv parts including wiring and testing complete all as specified and as directed.
4
-
-
NOTES :-
1.The time limit for attending the complaints on intimation to the contracts by the department shall be as under:-
(a) Leakage of Chlorine gas- within 1 hour
(b) Repair to motor/pump- within 2 days (c) other Misc jobs- with in 1 day
2. In case the contractors fails to attend/rectify the defects within the above time limit, penalty will the imposed as under:- (a) Rs 500/- per hour in case of leakage of chlorine as mentioned at note 1(a) above (b) Rs 1000/- per day in case of complaints/jobs mentioned at note 1 (b) & (c) above. 3. The contractor or his authorised representative shall report to the Engineer-in-charge or concered JE at 0900 hour daily on all working days to receive order/instructions of the work. A register shall be maintained to record all orders & instructions and their complaints and is to be signed by the contractor/his representative and the Engineer-in -Charge / JE Concered.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements